
Juan D.
Site Foreman (Practical year of my studies)

Connect with Juan D. to Send Message
Connect
Connect with Juan D. to Send Message
ConnectTimeline
About me
Commercial Manager
Education

Framesby High School
1995 - 1995Post Matriculation Mathematics; Biology; English 12Activities and Societies: Rugby I post matriculated to better my marks.

Winterberg Agricultural School
1990 - 1994Matriculation English; Afrikaans; Mathematics; Biology; Agricultural Science; Practical Agricultural 12Activities and Societies: Rugby

Nelson Mandela University
1996 - 2000Bachelor’s Degree Quantity SurveyingB-Tech Degree: Quantity Surveying.Awards Received:Merit award for Academic Achievements in Faculty Civil Engineering, Architecture and Agriculture in the November 1997 examination in the Second year of the National Diploma: Building.
Experience

BUILDNET
Dec 1996 - Dec 1997Site Foreman (Practical year of my studies)I was responsible for different small project running simultaneously. My responsibilities were to do everything from A – Z on site, from order and collecting material to doing small quotations.

Mostert Construction
Mar 2000 - Aug 2000Quantity SurveyorOnly QS working for the company and my responsibilities was to do everything from A – Z, measuring, pricing, material orders, payment, wages and etc.

Dave O’Keefe & Co Ltd
Nov 2000 - Oct 2001Quantity SurveyorShow flats & apartments (UK) – £1.094 millionPosition – Quantity Surveyor

Laing O'Rourke
Oct 2001 - Jan 2004Quantity SurveyorStratford Tube Tunnel 20km (UK) – £62.7 millionPosition – Quantity Surveyor

HOCHTIEF Solutions AG - Civil Engineering
Mar 2004 - Dec 2005Quantity SurveyorEllington Incinerating Plant (UK) – £43 millionPosition – Quantity Surveyor

Group Five Building
Apr 2007 - May 2011Senior Quantity SurveyorProject – Montsopa Hospital (South Africa) - R310 million • Complete procurement of subcontractors using a procurement website to source vendors and send compiled tenders out including un-priced bill of quantities and drawings.• Subcontract contract award; standard Group Five subcontract was used that tied the subcontractor to the main contract. • Manage the site financial team to re-measure and report quantities accurately.• Prepared quarterly applications to submit and agree with client using a costing system called CCS.• Prepared monthly contract reports for contract review with directors.Other employment and key projects:Project – King Shaka International Airport (South Africa) – R2.85 billionPosition – Senior Quantity Surveyor – (June 08 - Oct 10)Project – Woodmead Shopping Mall (South Africa) – R364.8 millionPosition – Quantity Surveyor (April 07 - June 08) Show less

Nevlar Project t/a NL Stainless Steel
Jun 2011 - May 2013Financial Manager• Responsible for managing the financial side of the company, also assisting the business from an operational side. • Instigating, preparing and implemented operational systems to assist the business more efficient and in doing so, saving time and money for the company. Examples would be:• Converting the use of hand written log sheets for quotations to preparing quotations via an excel system.• Creating a cost reporting system via excel which I believe works better than some of the proprietary cost report systems implemented at other companies.• Creating a proper ordering system via excel and ensuring it was used.• With no documented procedures, each employee was doing things individually I prepared a series of process within a procedure manual and rolled them out for employees to follow. Show less

Group Five "Structured Ingenuity"
Jun 2013 - Sept 2015Senior Quantity Surveyor• Procurement of subcontractors including following a contractual condition to use local vendors in the area.• Subcontract contract award using standard Group Five terms and conditions to step down the appropriate sections of the head contract to manage the risk allocation. • Managed the project team including re-measure and report quantities in conjunction with costs and earned value.• Prepared monthly applications for submission and agreed with client, using a costing system called CCS.• Prepared monthly contract reports for contract review with directors.• Closing out of final accounts with subcontractors and client. Show less

OHL Construction Canada Inc.
Sept 2015 - Jan 2019Commercial Lead Equipment ManagerProject – CHUM Hospital - (Canada) - $2.2 billion CAD• Procurement of subcontractors including raising recommendation reports to client and senior JV management,• Drafting and awarding subcontracts,• Managing up to of 240 subtrades including subcontract administration, raising all required notices and maintaining a log of any liens served,• Raising payments and change orders, • Preparing monthly reports with forecasts and• Concluding final account agreements.

Graham
Jan 2019 - Jun 2020Commercial ManagerProject – All Projects for Infrastructure department - (Canada) - $622 Million CAD (Combined)• Plan, organize, direct, control and evaluate construction projects from start to finish according to schedule, specifications and budget• Prepare and submit construction project budget estimates• Plan and prepare construction schedules and milestones and monitor progress againstestablished schedules• Prepare contracts and negotiate revisions, changes and additions to contractual agreements witharchitects, consultants, clients, suppliers and subcontractors• Develop and implement quality control programs• Represent company on matters such as business services and union contracts negotiation• Prepare progress reports and issue progress schedules to clients• Direct the purchase of building materials and land acquisitions• Commercial reviews of bid contracts (CCDC-2008)• Preparing monthly contract review reports with forecasts and Managing claims to and from Clients and Subtrades. Show less
Licenses & Certifications

B-Tech Degree: Quantity Surveying
Nelson Mandela UniversityFeb 1996
Languages
- enEnglish
- afAfrikaans
Recommendations

Douglas leite
Analista de Marketing Digital na KIA BrasilItu, São Paulo, Brasil
Kevin everard
People | Property | TechnologyReno, Nevada, United States
James griffiths
Logistics Assistant Manager at Net World Sports LtdCefn-Y-Bedd, Wales, United Kingdom
Tom glebas
Vice President at VideoRayDowningtown, Pennsylvania, United States
Roy john garcia
Cloud Solutions Architect @ Microsoft Viva | Solutions EngineeringSingapore
Tatiane oliveira rafachine
Auxiliar Administrativo | Unimed UberabaIgarapava, São Paulo, Brazil
Tatiana chikalina
Product Manager | Yandex | 4+ years exp.Moscow, Moscow City, Russia
Sara crohns
Project Manager IT på TrafikverketStockholm County, Sweden
Erwan cozza
Concepteur/Intégrateur Réalité Virtuelle Thérapeutique - UnityNice, Provence-Alpes-Côte d'Azur, France
Ashwin nambiar
Electrical EngineerSaudi Arabia
Ngân hoàng bảo
Student at Ton Duc Thang UniversityDistrict 7, Ho Chi Minh City, Vietnam
Mauro machado
Performance Marketing | Digital Marketing | PPC ManagerPorto Metropolitan Area
Yuka yasuda
求職中Tokyo, Tokyo, Japan
Fernando perez rubio
Project ManagerGuadalajara, Jalisco, Mexico
Moataz alashmawy
Physical education officerEgypt
Narasimha rao
Senior Software Engineer at Wells FargoTelangana, India
Michael owens
Educational Researcher and AdvisorThe College Board
Dhinesh kumar
Addl. General Manager at NTPC LtdChennai, Tamil Nadu, India
Suchismita ghosh
Software Engineer at CGIHyderabad, Telangana, India
Oluwafemi sopade
Software Engineer || Salesforce DeveloperLagos, Lagos State, Nigeria
...