Parselian Mahendran

Parselian mahendran

bookmark on deepenrich
Followers of Parselian Mahendran130 followers
  • Timeline

  • About me

    Technical Engineer at JH Construction W.L.L

  • Education

    • Anna university chennai

      2009 - 2013
      Bachelor's degree civil engineering frist class
  • Experience

    • Sri annamaar & co

      Sept 2012 - Aug 2015
      Civil engineer

      Work objective Combined court building seven judicial magistrate courts will three floors of office. Road, MEP, pile foundation compound wall and bridge pier (four deck slab, two abutments and three pier foundation).Role & Responsibilities- Preparing the construction design of interior, elevation, wall panel, layout plan and parapet wall design.- Design calculation preparation and stability check for the three-pier foundation and four deck slab and abutment reinforcement for pier bridge.- Preparing BSS schedule for base slab, wall, bridges reinforcement.- Design calculation preparation for tapered pyramid roof with steel reinforcement.- Design preparation of MEP and electrical connection. Show less

    • Qd-sbg construction

      Aug 2015 - Sept 2018
      Technical engineer

      Work objective As part of the expressway program. The Dukhan highway east project runs around 11.7km from the Bani hajer interchange (West) to the tilled interchange (East) and along Al Gharaffa Road from Al Rayyan Street (South) to Thani Bin hasim street (North).Role & Responsibilities- Review the IFC drawing of Section-5 Bani hajer Interchange (Roundabout, With Link1 and Link2 bridge, Camel bridge, Link 2 underpass, Rayyan underpass), Roads and wet & dry Utilities.- Preparing BSS schedule for base slab, wall, bridges reinforcement.- Posttensioning bridge stability calculation and load acting of the bridge calculation and design review and submitted to consultant to obtain approval.- Preparing the concrete pouring sequence for retaining wall and base slab casting as per QCS2014 Specification.- Review and submit the shop drawing on time before execution work at site and make sure of Xref file and layer are according the PWA CAD standard manual version 5.0.- RFI (Request for information) will be raised when encounter with utilities clashing. E.g. Manhole to manhole pipe connection will be clashed by another manhole. In that case we rise RIF and propose a proposal illustrate sketch showing by profile.- Review and submit red mark drawing to the consultant. The changes made at site during construction by RFI and other due to existing utilities and ducts.- Final Survey as-built Rev-Z by PWA CAD standard manual version 5.0. will be submit to the consultant for approval and handover inspection.- Traceability and tracking of work completion of each area road and utilities- GIS attributes and recorded as built submit to the end user for proper handing over. Show less

    • Jh construction w.l.l

      Sept 2018 - now
      Design review technical engineer

      Work objective Road improvement works contains three package site instructions each has existing & proposed dry utilities and wet utilities. Existing Roads widening and newly proposed 8 lane road works then open cut and micro tunneling work.Role & Responsibilities- Review IFC drawing and make a report including any additional information or missing drawing form the consultant and make sure of QDRS approval from Kahramaa, QNBN…- We have encountered foul sewer coming under asphalt widening due to that need to do chamber lowering. So, the existing cover slab will be removed and replaced with new cover slab calculated to withstand the load and with steel reinforcement then taken approval from Consultant.- Prepare the BBS and checked the design requirements.- Existing portable air value chamber come under the asphalt, it should be lowered and extended to near island. Review design of existing chamber load then calculated the additional reinforcement of stability.- Reviewing the design calculation of precast manhole of 1800, 2100, 5100 Día manhole with depth of more than 31 meter submitted to consultant and taken approval.- Review and submit the shop drawing on time before execution work at site and make sure of Xref file and layer are according the PWA CAD standard manual version 5.0.- RFI (Request for information) will be raised when encounter with utilities clashing. E.g. Manhole to manhole pipe connection will be clashed by another manhole. In that case we rise RIF and propose a proposal illustrate sketch showing by profile.- Review and submit red mark drawing to the consultant. The changes made at site during construction by RFI and other due to existing utilities and ducts.- Final Survey as-built Rev-Z by PWA CAD standard manual version 5.0. will be submit to the consultant for approval and handover inspection.- Cut and fill quantity analysis and stockpile quantity analysis. Show less

  • Licenses & Certifications

    • Iso 9001:2015 - quality management system (internal auditor training ) ,diploma in computer application

      Guardian independent certification limited, csc
      Feb 2016
    • Pmp

      Chicago training center
      Nov 2016