Ahmed Haggag

Ahmed Haggag

Site Engineer

Followers of Ahmed Haggag527 followers
location of Ahmed Haggagالسعودية

Connect with Ahmed Haggag to Send Message

Connect

Connect with Ahmed Haggag to Send Message

Connect
  • Timeline

  • About me

    Senior Project Manager at Tronox

  • Education

    • Alexandria University

      1996 - 2001
      Bachelor of Science (BSc) Architectural Engineering
  • Experience

    • Al DELTA Co. (Piling Co.)

      Dec 2002 - Jun 2003
      Site Engineer

      DAMANHOUR OLYMPIC STADIUM PROJECTDec. 2002 till June 2003> Job Title: Site Engineer. > Owner: Egyptian Ministry of Youth and Sport.> Owner Consultant: Hassan Allam Co. for cont.> Partner Consultant: Vebro Co. for Mechanical Foundations.> Project Contents: CFA Piles "R=50 cm, L=20 m, steel L=16 m" -1800 Piles> Was in charge of the following :- Piles coordinates preparation (by AutoCAD) and site leveling network.- Piles drilling machine positioning and inspecting drilling operation (as team-work leader).- Concrete mixture inspecting and concrete pouring operation (concrete mix station, mixer cars, and concrete pump).- Piles Steel cages fabrication and placing.- Piles tests (Loading test, ultrasonic test). عرض أقل

    • Al-Shams Construction & Engineering

      Jun 2003 - Feb 2004
      Site Engineer

      MABARRAH HOSPITAL IN MAHALLAHOct. 2003 till Feb. 2004RAMAD HOSPITAL IN KAFR EL-SHIEKHJune 2003 till Oct. 2003

    • South star Est. (KSA)

      Mar 2004 - Mar 2005
      Site Engineer

      ACADEMIC BUILDINGS FOR GIRLS COLLEDGE IN DAMMAM (2nd Phase) March 2004 till March 2005> Job Title: Site Engineer. > Owner: Ministry of Higher Education> Owner’s Consultant: Ministry of Higher Education> Designer: Devecon Engineers and Architects (Finland)> Project Contents: 6 Main Buildings, TV Network Building, Sub-Stations & Chillers Station, Underground Tunnels, (Fences - Layout finishes - Landscape).> Project cost: 70 million Saudi Riyals. (1st Phase) 55 million Saudi Riyals. (2nd Phase) عرض أقل

    • PETROJET

      Mar 2005 - Oct 2009

      Upper Egypt Gas Pipeline (30") in 400 km length, (Gerga – Aswan Phase)From Mar. 2009 October 2009> Job Title: Planning Engineer. > Owner: EGAS> Owner’s Consultant: GASCO > Project Contents:30” coated steel Pipeline, Valves Rooms, Launcher, Receiver, Cathodic protection system and guidance signs.Silos Complex project ( 90000 ton) Elmnya, Egypt :from July 2007 – Feb. 2009> Job Title: Planning Engineer. > Owner: Egyptian Holding Company for Silos And Storage (E.H.C.S.S).> Owner’s Consultant: Nile Engineering Consulting Office (N.E.C.B).> Partner Contractor: Cimbria Unigrain A/S (Danish Co.)> Petrojet’s Consultant: Nile Engineering Consulting Office (N.E.C.B).> Project Contents:In Area of 35000 m2- 20 Storage silos - 6 Levels steel structure machine tower.- Sanitary work& septic tanks. - Underground Tunnels and water tank.- Administration Buildings - ( Fences - Layout finishes - Landscape )> Project cost: 46 million LE pounds. عرض أقل Silos Complex project ( 30000 ton) Giza, Egypt :from April 2006 – June 2007> Job Title: Site Engineer. > Owner: Egyptian Holding Company for Silos And Storage (E.H.C.S.S).> Owner’s Consultant: Engineering Consulting Office (E.C.O.G.I.M).> Main Sub-Contractor: Cimbria Unigrain A/S (Danish)> Petrojet’s Consultant: Consulting Engineering Office (C.E.O).> Project Contents:In Area of 10000 m2- 6 Storage silos - 6 Levels steel structure machine tower.- Sanitary work& septic tanks. - Underground Tunnels and water tank.- Administration Buildings - ( Fences - Layout finishes - Landscape )> Project cost: 20 million LE pounds.››› West Desert, Qarun Petroleum Company (Q.P.C), Karama fields, Egypt:Crude Oil Pipeline (8") in 30 km length,From Nov. 2005 – April 2006> Job Title: Site Engineer. > Owner: Qarun Petroleum Company (Q.P.C)> Owner’s Consultant: Egyptian Petroleum Researches Institute (E.P.R.I)> Project Contents:8” coated steel Pipeline, Valves Rooms, Launcher, Receiver, Cathodic protection system, wells and guidance signs.Foundations of (10) crude oil tanks 5000 pbls,From Sep. 2005 – Nov. 2005> Job Title: Site Engineer. > Owner: Qarun Petroleum Company (Q.P.C)> Owner’s Consultant: Egyptian Petroleum Researches Institute (E.P.R.I)> Project Contents:Tank’s R.C Foundations, Pipe’s R.C sleepers, Steel shell construction, Pipe network, Cathodic protection system, earthing system.Crude Oil Pipeline (10") in 117 km length,From March 2005 – Sep. 2005> Job Title: Site Engineer. > Owner: Qarun Petroleum Company (Q.P.C)> Owner’s Consultant: Egyptian Petroleum Researches Institute (E.P.R.I) عرض أقل

      • Planning Engineer

        Jul 2007 - Oct 2009
      • Site Engineer

        Mar 2005 - Jun 2007
    • Cristal

      Oct 2009 - Jul 2020

      Planning and Control Section is a section under Projects Engineering Department at CRISTAL Yanbu Plant.Planning and Control Section Leader Responsibilities - Team Leading [Capital Planning Engineer, Planning Engineer, Cost Engineer, SAP Specialist and Contract Administrator] - Projects, Shutdown activities scheduling and Progress Tracking and reporting (as a member of Plant Shutdown Planning Team and as a Projects Dep. Planning and Control Leader) - Department Overhead Cost Budgeting, Tracking and reporting - Contractors / Vendors Invoicing verifying, Processing - Projects ECEA (Electronic Capital Expenditure Authority) Process Planning and Supporting with PMT (Budget Estimation, L2 Schedule and Milestones, ECEA process support) - Project’s Budget Planning, Tracking and Reporting - Spending Planning, Tracking and Reporting (Project and Capital Levels) - Risk Assessment, Planning, Tracking and Reporting - SAP (Project System) Management and Reporting (WBSs, Assets, Settlements … etc.) - Projects Closing (Closing Reports, align with Finance for Assets Capitalization ... etc.) - Periodic Division / Department Management Reports issuance. عرض أقل Sr. Project Control Engineer working for the Planning and Control Section under Projects Engineering Department.Sr. Project Control Engineer responsibilities: - Supervision and quality control of planning, cost, quantities, estimating and progress measurement staff for overall completion of project objectives. - Preparation and update of Project Controls sections of the PEP, including WBS, CBS, Risk management, contingency management, progress measurement & reporting, project reports, etc. - Coordinates with PMT on Project, Schedules, Progress and Cost Review meetings on a weekly basis. - Creation of Work, Cost and Organizational Breakdown Structures (WBS, CBS & OBS), and development of schedules for those WBS elements. - Responsible for performing baseline schedule preparation, maintenance and control in conjunction with the Project Manager. - Monitor actual performance against the schedule to identify delay, early and late completion. - Coordinate Project Forecast And Implement Change Management. - Projects Budgeting, Cost Controlling. - Prepare and Update, On A Regular Basis, Project Cash Flow Forecasts - Contractors /Vendors Contracts /Invoices Tracking & Controlling. - Initiate and Plan Projects Division’s Team Capability and Resources utilization [specially with In-House-Engineering Department] عرض أقل

      • Planning and Control Superintendent, Projects

        Oct 2015 - Jul 2020
      • Sr. Project Control Engineer

        Oct 2009 - Sept 2015
    • Tronox

      Aug 2020 - now

      Project Manager role in addition to continuous BIA role for Stage Gate process Tracking and Reporting, CAPITAL process Tracking and Reporting, CWIP process Planning, Tracking and Reporting,Power-Bi reports design and development for BT-Resourcing, MFC-Deep Dive, and preparation for CAPEX, CWIP and SG reports,CAPITAL, CWIP, SG and Benefits local-DBs, Site uploads and compliance with TRONOX Apps (SharePoint, EPPM, Ideation and Benefits & Cost), support awareness and training tasks for Scheduling, CWIP and SGP.examples of projects, “Ore & Coke emission reduction” and “Plantwide Car Parking” projects ..►as Owner: Technology & Improvement Department, Projects section عرض أقل In compliance with TRONOX, Stage Gate process initiation in Yanbu site, CAPITAL process Planning, Tracking and Reporting,CAPITAL, CWIP process Planning, Tracking and Reporting, CWIP, SG and Benefits local-DBs, Site uploads and compliance with TRONOX Apps (INSTANTIS, PWA, Ideation and Benefits & Cost)Support awareness and training tasks for Scheduling, CWIP and SGP,Participate in site’s Business transformation workshops and related initiatives and tasks planning and reporting, an developing a benefits planning local tool and integrate it with the site’s CAPITAL planning process, Power-Bi reports design and development for BT-Resourcing, MFC-Deep Dive.►as Owner: Technology & Improvement Department, Business Improvement section عرض أقل

      • Senior Project Manager

        Jul 2022 - now
      • Business Improvement Analyst

        Aug 2020 - Jul 2022
  • Licenses & Certifications

    • Project Management Professional (PMP)

      Project Management Institute
    • Developing an Effective Business Case

      Skillsoft
      Jul 2021
      View certificate certificate
    • Agile Principles and Methodologies

      Skillsoft
      Aug 2022
    • Working with Databases in Access 2019 for Windows

      Skillsoft
      Nov 2022
      View certificate certificate
    • Saving, Printing & Exporting Databases in Access 2019<br> for Windows

      Skillsoft
      Nov 2022
      View certificate certificate