Case Blum, RA

Case Blum, RA

Intern

Followers of Case Blum, RA1000 followers
location of Case Blum, RAUnited States

Connect with Case Blum, RA to Send Message

Connect

Connect with Case Blum, RA to Send Message

Connect
  • Timeline

  • About me

    Sr Industrial Design Engineer at Amazon

  • Education

    • Miami University

      2004 - 2008
      Bachelors Architecture
  • Experience

    • Michael Canatsey Associates

      May 2005 - Aug 2005
      Intern

      Worked on the design for a cabin in Tumble Creek, WA and a residential renovation in Eastern WA.

    • Walker Partnership

      May 2006 - Aug 2006
      Intern

      Worked on several single family residential designs and renovations in the greater Seattle area.

    • Callison

      Jul 2008 - Sept 2010
      Architectural Staff II

      Corporate StudioProject Staff on a 2-block mixed use project in downtown Phoenix called Cityscape from early design through construction. This built project includes an office tower, hotel tower, two low-rise retail buildings, a pedestrian bridge, and large landscaped plaza.Asia and India Commercial StudioProject Staff on numerous design packages on a wide range of mixed-use retail and residential projects in Shanghai, Mumbai, and Riyadh.

    • HEWITT

      Apr 2011 - Oct 2020
      Project Manager

      Eight Eighty Eight (888 108th Ave NE)Project Manager & Project Architect on a 19-story, type I construction, multifamily tower in Bellevue, WA. Project includes 158 high-end apartment units, a wrap-around roof deck, and a ground level retail space with an adjacent drive court. Project completed in 2020.The LeeAnn (5th Ave N & Roy St)Project Manager & Project Architect on a 5-story, multifamily, mixed-use development in Seattle, WA. This project has 107 apartment units, an expansive, terraced courtyard area, 3,500sf of ground level commercial, and a large roof deck with multiple amenity spaces. Project completed in 2020.7th & Dearborn TowerProject Manager on an 18-story, type I construction, multifamily tower in Seattle, WA. This project will have an estimated 450 units. Project in design.Roosevelt Station - Sound TransitProject Architect on the Roosevelt Light Rail Station. This transit center is located more than 60-feet below grade and is accessed through two separate at-grade entrance structures. The station design includes several levels of complex vertical transportation, MEP spaces, and the large fan rooms that ventilate several miles of connected transit tunneling. Project completed in 2021.Capitol Hill Transit-Oriented-DevelopmentProject Architect on two multifamily, 7-story, mixed-use buildings above the below grade light rail transit station on Capitol Hill in Seattle, WA. Project completed in 2021.Green Lake VillageProject Staff on a mixed-use, multi-family development in Seattle, WA that consists of three independently functioning, 5-story buildings, with 297 apartment units, two major plaza spaces, a PCC grocery, and several other at grade retail stores and restaurants. Project completed. Show less

    • Amazon

      Oct 2020 - now
      • Sr Industrial Design Engineer, NASC Engineering

        Nov 2023 - now
      • Sr Design Program Manager, Global Realty Building Design

        Oct 2020 - Nov 2023
  • Licenses & Certifications

    • Architect

      Washington State Department of Licensing
      Feb 2020