Peter Cotugno

Peter Cotugno

Assistant Project Manager

Followers of Peter Cotugno2000 followers
location of Peter CotugnoLos Angeles Metropolitan Area

Connect with Peter Cotugno to Send Message

Connect

Connect with Peter Cotugno to Send Message

Connect
  • Timeline

  • About me

    Vice President of Operations at W.E.O'Neil Construction

  • Education

    • University of Illinois at Urbana-Champaign

      1997 - 2001
      Bachelor of Science Civil Engineering
  • Experience

    • W.E. O'Neil Construction

      Jun 2000 - Mar 2006
      Assistant Project Manager

      2005-2006Archstone Warner Center Apartments, Canoga Park, CA 642,545 sf multifamily apartment development with 522 Units and two poured-in-place concrete parking structures. Wood framed facility; Type V construction.2004-2005Harrahs Rincon Hotel and Casino, Valley Center, CA22 story (462 room) reinforced post tension concrete hotel tower; Type I construction. 60,000 sq. ft. structural steel casino and spa expansion; Type I construction. 10,000 sq. ft. remodel of existing casino back-of-house; Type I construction.2002-2004Maravilla Senior Community, Goleta, CA272,000 sf assisted living facility with 272 Units, and 50,000 sf front of house common area. Wood framed facility; Type V construction.2001-2002Belmont Village, Burbank, CA143,000 sf assisted living facility with 147 Units. Structural steel framed facility with concrete podium; Type II construction. Show less

    • The Athens Group

      Mar 2006 - Mar 2009
      Construction Manager

      2006-2009Montage Beverly Hills, Beverly Hills, CA9 Story (201 room) reinforced post tension concrete hotel tower; Type I construction. 20 Condominiums, 20,000SF Spa, 9,000SF Meeting and Private Event Space, Two Restaurants, Rooftop pool and bar, 3 Commercial Kitchens. 400,000SF subterranean parking garage. 4 Story, 100,000 SF multipurpose building for the City of Beverly Hills.Awards: 1 of 4 LEED Gold certified hotels worldwide (new construction). 1 of 54 Forbes / Mobile Travel 5-star rated hotels worldwide. Show less

    • Montage Hotels & Resorts

      Apr 2009 - Dec 2009
      Project Manager Technical Services
    • W.E. O'Neil Construction

      Jan 2010 - now

      2012-2014Tongva Park, Santa Monica, CADesign-build of a new 7-acre park. W.E. O’Neil partnered with world renowned Architect, James Corner Field Operations as the lead Landscape Architect. The 7-acre park consists of many unique design elements. The project was fully coordinated with BIM. Multiple award winner.2013-2014Regency Westlake Village, Westlake Village, CARemodel of an existing 315,000 SF outdoor mall in Westlake Village for Regency Centers. Work includes façade, storefront upgrades, new roofing, removal and replacement of all existing hardscape, removal and replacement of all parking lots, removal and replacement of hazardous trees.2015Occidental College Hameetman Center, Los Angeles, CAPhase 1 of an interior renovation of university administrative and student support space. Includes high end finishes, glass, millwork and HVAC/lighting replacement. Includes renovation of exterior courtyard.2015Regency Westlake Village Phase 2, Westlake Village, CADesign-build remodel of existing 250,000 SF outdoor mall in Westlake Village for Regency Centers. Work includes façade, storefront upgrades, new roofing, removal and replacement of all existing hardscape, removal and replacement of all parking lots, removal and replacement of hazardous trees.2015Occidental College Stearns Hall Renovation, Los Angeles, CASummer remodel of existing dorm restrooms. Scope of work included re-pipe and renovations within a student housing facility at Occidental College. Show less 2010Parking Structure 7&8 Renovation, Santa Monica, CA Parking Structures 7&8 contain 1,600 parking spaces in two 6-story structures which were renovated, reconfigured, and seismic upgraded.2010-2012Northrop Grumman Aerospace Systems M4 High Bay, Redondo Beach, CADesign-build of a new LEED Gold, class 10,000, high bay clean room manufacturing facility and attached control room for Northrop Grumman. The project was fully design and coordinated with BIM.2012Northrop Grumman Aerospace Systems Building 150A Renovation, Redondo Beach, CADesign-build warehouse renovation at building 150A for Northrop Grumman. Renovation included removal existing slab on grade and replacement with 18” thick mat foundation as well as all infrastructure required to support new Vertical Lifting Module (VLM) storage units as part of Northrop Grumman’s global supply chain consolidation. Show less

      • Vice President Operations

        Aug 2024 - now
      • Project Executive

        Dec 2015 - Sept 2024
      • Project Manager

        Dec 2012 - Dec 2015
      • Project Manager

        Jan 2010 - Dec 2012
    • University of California, Los Angeles

      Jan 2017 - now
      Lecturer

      Lecturer for CEE 188 - Intro to Construction Management within the Department of Civil and Environmental Engineering.

  • Licenses & Certifications