
Deepakkumar Oza
Site Engineer

Connect with Deepakkumar Oza to Send Message
Connect
Connect with Deepakkumar Oza to Send Message
ConnectTimeline
About me
DGM (Renewable Energy Project)
Education

University of Allahabad
2004 - 2007Bachelor of Technology - BTech Electrical and Electronics Engineering 1Activities and Societies: Student Placement

Government Polytechnic Rajkot
2001 - 2004Diploma of Education Electrical and Electronics Engineering 1 st
Experience
.webp)
Utility Powertech Limited.(A Jv Of Ntpc&Reliance Infrastructure)
May 2007 - May 2008Site Engineer• Prepare the project schedule of 66/11 KV substation with daily activities of man-hours.• Planning of engineering execution with the setting of goal with respect to handing over to customer.• Daily execution preplanning for step by step job related activities and weekly meeting with client for project update and joint audit. • Execution of Equipment arrangement, erection, installation, testing and commissioning with respect to released SLD, GA Drawings, Supplier drawings etc.• Erection of All electrical equipments of 66/11 KV substation (66/11 KV – 10 MVA Transformer, 66KV SF6 Breaker, 66KV CT and PT, 66KV LA, 66KV Horizontal Double Break Isolator – Manual & Motorized, Insulators).• Earthing for Main transformer, structure and individual equipments and grid.• Installation of 66 KV control panel & 11 KV distributions CB panel for outgoing overhead lines.• Installation of Station transformer & LT panel for lighting load, Battery Bank & UPS for auxiliary power and control wiring supply.• Installation of fire and Safety devices.• After installation of all equipments, testing & commissioning.• All the testing and commissioning activities jointly carried out by TSP contractor and Customer.• Joint sign off (Handover & Takeover) by both the parties after successful completion of the project. Show less

Wireless Tt Info Servises Limited
May 2008 - Jul 2009Senior Engineer• Project construction work of telecom tower, MSC, BSC and responsible for Electrical I&C, Civil Construction, Mechanical Erection work, Communication equipment installation, RF equipment installation, Electrical AC & DC wiring etc.• Helping all Engineers & Field technicians for regular technical problems of saurashtra & kutch circle and I have to guide and solve all technical quires of the circle for fault finding & troubleshooting.• Management of all expenses of diesels, power utilization at site, DG run reading, and Regular maintenance of all utilities at sites.• Prime responsible to manage all Electrical equipments like DG Set, ACDB, SMPS Power Plant, Battery Bank, PAC, DDF Device, Transporter Device, BTS Device, RF work etc. Other main work is coordination with all Vendors for Installation of all Electrical Utilities, Testing & Commissioning than Maintenance activities.• Civil activities of CDMA & GSM site construction like Site validation, tower foundation, Concrete work as per drawing, Shuttering, Plumb & Spirit level, checking of Reinforcement as per drawing at Ground based tower (40 Mt., 50Mt., 60 Mt), Repeater sites (40 Mt., 60 Mt.), & Roof Top Sites (18 Mt, 15 Mt, 9Mt, 6 Mt) at saurashtra & Kutch district.• Electrical Activities: Installation, Testing & Commissioning of Electrical Utilities like DG, SMPS Power Plants, Battery Bank, PAC, ACDB, DCDB, Transport Equipments, Power caballing & termination, Earth pit and Earth Grid lying and interconnection, Lighting Arrestor, and AC & DC electrical wiring work.• Mechanical Activities: According to the drawing Tower Erection, Strengthening, LA installation, RF & MW pole erection at given height and degree on GBT, Repeater & Roof Top Tower site.• Commercial Activities: Finance management, Material Management, Material consumption, MRN, GRN, OGP, ITP & JMR verification and validation of MSP & TSP vendor. Show less

Reliance Communications
Jul 2009 - Sept 2011Senior Project Engineer• Electrical Operation and maintenance of Telecom sites like BTS, MCN, IS and Power Substations.• Regular maintenance and health check up of all Telecom Electrical equipments and OFC Routes.• Maintenance of Transformer, Penal, 11 KV incomer line, Isolators, Breakers, CT, PT, DG, SMPS, Battery Banks, Transport Equipments, BTS equipments, DC and AC supply systems.• Regular calibrations and health check up of all measuring equipments in coordination with CHQ and NHQ (OTDR, Power Meter, Multi Meter, Cable locator, Splice Machine, Cleaver, Stripper, Crone tool).• Regular power consumption & other parameters meter readings to be submitted to circle and national head quarter.• Regular route maintenance of Fiber Distribution penal, OFC route and equipments.• Team management of engineer, technicians, labors and drivers.• Regular audit, attendance and performance review.• Quarterly training arrangement for knowledge building and awareness about safe work.• Taking care of resource management, material management and consumption management.• SAP Activities: Commercial activities like MIN, GRN, PR, PO, WO, Bill certification, Stock and inventory management.• Vendor Management: Management of TSP and MSP vendor to ensure about quality and safe work. Show less
%20Ltd..webp)
Sunkon Energy (P) Ltd.
Sept 2011 - Apr 2012Deputy Manager• Project planning, design, construction, erection, installation, testing and commissioning of 10 MW PV based solar farm construction. (DC, LVAC, HVAC & Transmission line construction)• Preparation of DC & AC power SLD (Single Line Diagram) & other drawings with the help of Draughtsman. Technical guidelines fulfilled by me as per IS, Client, GUVNL, CDM & GETCO standard.• Schedule preparation from earth work up to testing & commissioning stages. • Team arrangement for DC side work, LVAC side work, HV Substation construction work and Transmission Line construction work.• Day to day progress planning and scheduled execution on ground and regular update to HO, Client and GUVNL & CDM (Gujarat Urja Vikas Nigam Limited & Clean Development Mechanism) team.• Plot planning of the ground and cable root identification of Electrical cables & communications/Instrumentation/SCADA cables.• Equipment Selection Planning & procurement with the help of commercial team (DC side Equipments, LVAC Equipments & Substation Equipments).• Cable (Power & Communication) sizing finalization as considering the IS & Client standard.• Erection, testing & commissioning of DC, LVAC, and HV Substation & Transmission line construction.• Daily team task review with respect towards achieves the integration date.• Quality work analysis while ongoing execution.• Supervise the Equipment & cable stock and planning for upcoming job and material availability in warehouse.• To check FAT (Factory acceptance Tests) of all arrived electrical equipments. After the checking of those results I had to give clearance for equipment erection. • Maintain records related to daily scheduled and completed work, correspondence with client and Government Authorities, records of number of technicians, vendor teams, and Engineers work each day.• To measure all safety guidelines while executions, working at Height, live line work etc. Show less

Reliance Communications
Apr 2012 - May 2013Assistant Manager( Construction of 25 MW solar Farm, Erection, Installation, Testing and Commissioning of PV modules, JB, STB, Isolators, Step-up Transformers, RMU, Interconnectivity Caballing, 11KV Switchyard Panel, 66 KV Switchyard Equipment like CT, PT, LA, SF6 Breaker and Isolator)Highlights: Generated DC & AC Power SLD (Single Line Diagram) & other drawings with the help of Draughtsman by ensuring strict adherence to technical guidelines as per IS, Client, GUVNL, CDM & GETCO standards Focused on records related to daily scheduled and completed work, correspondence with client and government authorities, records of number of technicians, vendor teams, engineers working each day Safeguarded proper usage of minimum safety equipment by the entire team members as per the safety guidelines thereby measuring safety guidelines while executions, working at Height, live line work and so on Engaged in upgrading of accomplishing jobs by EPC, Vendor & Client during the project. (i.e., PV penal Erection & Installation String Setup, String Series Wiring Work, Wiring reached up to Inverter, Substation Equipment Work, Transmission Line Progress) Apprised the records of vendor work as well as formulated the JMR (Joint measurement record) RE bills (Running execution) Show less

Himachal Futuristic Communications Limited / Quadrant / Videocon
Jul 2013 - Jul 2015Project Manager(Construction of IDC Electrical work, design, plan, execution, installation, testing and commissioning; construction of telecom towers (Electrical, Civil & Erection) & OFC Route Execution & Commissioning)* Engaged in reviewing and supervising electrical drawings and specification of supply vendor* Strategizing the working hours according to the plans and availability of manpower of vendor and team members * Intended cable sizing for interconnection of equipment as considering to the load flow criteria, RIL & IS standards * Generated and compared evaluation supply vendor according to the need of project; successfully issued the purchase order in coordination with SCM and procurement team * Safeguarded safety precautions (HSEF) to be taken by the team members and regular base training for electrical work and HSEF is delivered * Synchronized according to the project needs with other departments by verbal or written communication Show less

Reliance Communications
Aug 2015 - Nov 2018Senior Project Manager* Working in collaboration with team work, team management and assistance to Electrical Engineers and Engineering Technologists in design and layout of telecom & electrical installations and circuitry * Engaged in daily up loading of all equipment meter consumption / reading to circle office and approval process * Safeguarding about safety management and regular HSCF training for all staff to avoid any Fatal Accident of human or equipment loss and safe for environment * Measuring equipment in liaison with CHQ and NHQ (OTDR, Power Meter, Multi Meter, OFC cable locator, Splice Machine, Cleaver, Stripper, Crone tool) by conducting regular calibrations and health checkup * Focusing on minimizing energy consumption and enhance the efficiency of each team member by imparting quarterly training, research and experimentation programsHighlights: * Engaged in regular maintenance of Electrical Telecom equipment like BTS, OFC, RF Cable, IF Cable, Transport Equipment, Routers, Optical Modem, DDF, FDF, 11 KV LT panels, Transformers, power plants, battery banks, DG, AC distribution circuits, DC distribution circuits, LA, Isolators, protective relays, switches, ACB and VCB breakers * Successfully scheduled shutdown for pre-maintenance of all Electrical equipment and health checkup and aged parts replacement job * Administered project management BTS Sites, OFC Route, Splicing, Node Installation, FTTH construction in South Gujarat Area * Focused on project work of overhead structured OFC Line and underground OFC Cabling Installation, Chamber, Splicing, Testing and Commissioning Show less

Reliance jio
Nov 2018 - Dec 2020Senior Technical Manager• Construction of National Long Distance (NLD) links of South Gujarat, as current scope on hand is approximately 1150 KM and 850 KM already completed.• GIS released route survey of NLD links as well as Last Mile enodb sites. After completion of survey NPE. • Preparation of SLD, GA drawing, Electrical drawings, and other drawings with the help of Engineering department. Review and revision if required according to the ground requirement. • Working hours planning according to the availability of man powers of vendor and own team members.• Daily plan vs. Execution review to achieve the targeted time frame.• SAP activities for MIN, MRN, GRN, PR, PO, Budget etc.• Monitoring the daily attendance of the team.• Review and evaluation of NLD routes, LM routes, electrical drawings, and specification of supply vendor.• Carried out engineering calculations for electrical equipments like transformers, LT Penal, UPS, SMPS, Battery bank, Chiller systems & Motor sizing (IDC, ILD and NLD AG1/AG2).• Calculation of cable sizing for interconnection of equipments as considering the load flow criteria.• Preparation and comparison of evaluation supply vendor according to the need of project.• Issue the purchase order in coordination with SCM and procurement team.• Equipment-wise load calculation and execution planning.• Erection, Installation, testing and commissioning work of electrical and telecom equipments.• Ensure safety precautions (HSEF).• Regular & need base training for Electrical work, HSEF. • Weekly, fortnightly, and monthly meetings with all stakeholders.• Daily vendor joint measurement and work sheet sign off. • Vendor running & final bills certification, HOTO process, Punch points rectification activities. Show less

DCK Infrastructure P. Ltd.
Dec 2020 - nowDy. General Manager• Construction work at 30 GW solar Farm at Khavda location.• More than 600 MW completed at Charnaka, Bhadli, Upleta, Jafrabad and Babarjar locations.• Execution of UG Cabling for HT/LT, OH Transmission, Civil Piling, IDT work, Structure Erection, Earthing Work, ACDC work Installation, Testing and Commissioning of PV modules, Inverters, Transformers, cable connectivity etc. • Plot survey and demarcation of piles, IDT location by TM.• Regular meeting & coordination with client for progress of construction work at multiple sites.• Working hours planning according to the availability of man powers of vendor and own team members.• Manpower and vendor management in this extremely challenging region.• Daily plan vs. Execution review to achieve the targeted time frame.• Monitoring the daily attendance and performance of the team and team members.• Review and cross check of completed jobs like civil work, structure job, earth and earth grid work, ACDC electrical work according to drawings, and specification of supply vendor.• Cable sizing for interconnection of equipments as considering the load flow criteria, AGEL standards. • Daily follow the protocol and update the checklists provided by the client.• Follow the guidelines of AGEL ie. Execution, QC, Safety.• Preparation and comparison of evaluation supply vendor according to the need of project.• Erection, Installation, testing and commissioning work of electrical equipments.• Strictly Follow the safety guidelines (HSEF), Execute regular TBT at site.• Weekly, fortnightly, and monthly meetings with all stake holders.• Cross coordination according to the project need with other departments by verbal or written communication.• Daily vendor joint measurement and work sheet sign off. • Apprised the records of sub-vendor work as well as formulated the JMR (Joint measurement record) RA bills (Running execution) Show less
Licenses & Certifications
- View certificate

Industrial Electrician [Journeyman]
Ontario College of TradesDec 2019 
Professional Electrical Engineer
Engineers AustraliaAug 2017
Recommendations

Benny lonappan
Driller at ARO DrillingKochi, Kerala, India
Boyce chang
Product DesignerNew Taipei City, New Taipei City, Taiwan
Jose luis villalobos soto
MBA, Ing. Industrial, SSBB.Costa Rica
Gretchen meyers
Director of Assessment at University of Phoenix Implementing Innovative Assessment ProcessesSimpsonville, Carolina do Sul, Estados Unidos
John lubbers jr
Dedicated team oriented leader focusing on people in order to capture results.Montgomery, New York, United States
Dustin voyles
Branch Manager / ASNT RT Level III at IRISNDTPort Neches, Texas, United States
Paul barrett, cfa, cipm
Chief Financial Officer / Director of FinanceCleveland, Ohio, United States
Julian place cfp®
CFP® | MBA | GAICD | FFAAA | Director | Retirement Specialist | Advice/Business CoachGreater Melbourne Area
Thomas lansing
Carnegie Mellon Master in Innovation for Products & ServicesPittsburgh, Pennsylvania, United States
Tazhikiz balabayeva
Lead Metrology Engineer – LLP YKK (Wood Group)Kazakhstan
Simona corvo
Sales Phc Pharmacy ConsultantMessina, Sicily, Italy
Mohanraj s
Java Software Developer | Passionate about Software Development | Seeking Intern OpportunitiesChennai, Tamil Nadu, India
Brian neavin
Inventory Control & Quality Manager at RS AmericaHurst, Texas, United States
Polly man
Manager in Mazars (Account Outsourcing Services)Hong Kong SAR
Juwan robinson
Information Technology Desktop Support @ Hilton Worldwide | CompTIA Security+United States
Jonathan alexander hernández hernández
Lic. Sistemas de informaciónSanto Domingo, Distrito Nacional, Dominican Republic
Wouter scholiers
IT, Marketing & Content bij Acs AccountantsAntwerp Metropolitan Area
Jonathan maleknasr
PM & BA Cross Border Travel Management at Credit SuisseZurich, Switzerland
Mariana chavez cervantes
Consulta privada (Profesional independiente)Mexico City, Mexico
Brandon le
Account Coordinator at HRIS Insurance ServicesAnaheim, California, United States
...