Ruairi Maher

Ruairi Maher

Transmission Engineer

Followers of Ruairi Maher246 followers
location of Ruairi MaherIreland

Connect with Ruairi Maher to Send Message

Connect

Connect with Ruairi Maher to Send Message

Connect
  • Timeline

  • About me

    Electrical Project Engineer at Kirby Group Engineering

  • Education

    • St. Clements College

      2000 - 2006
      Leaving Certificate English,Irish,Mathematics,Economics,Business,Geography,Physics
    • Limerick Institute of Technology

      2006 - 2010
      Bachelor of Science Honours in Electronic Systems (Level 8) Electrical and Electronics Engineering
  • Experience

    • Meteor Mobile Communications

      May 2005 - Sept 2008
      Transmission Engineer

      The design & implementation for a region of Meteor’s Transmission network.• Carry out site surveys to confirm equipment on site & space availability in the cabin and on the tower.• Order line of sight survey and asses the results.• Sign off on site drawings.• End-to-end circuit planning from 2G BTS to BSC over Ericsson Traffic Node, Siemens SRAL XD, Siemens SDH Radio and fibre. • Produce workpacks for equipment installs and for circuit routing• Review handover documentation Show less

    • Analog Devices

      Jul 2010 - Feb 2012
      Design Evaluation Engineer

      Responsible for completing the full evaluation of core switch parts. This included:• The holding of CRM and DRM meetings.• Design and tape out of evaluation boards.• Writing and debugging of Labview Programs for evaluation tests.• Gathering and presentation of data for various evaluation tests.• Completion of checklist, functionality and evaluation reports.• Archiving of hardware and software programs and results.• Dealing with follow up issues.• Dealing with customer issues. Show less

    • Pan Process

      May 2012 - Aug 2013
      Electrical Engineering

      • Assist the Project Estimating team with the preparation of tenders. This includes site visits to assess the job, quantity take offs from drawings, project design in some cases and acquiring pricing from suppliers. • Worked on the Mt. Carlton Gold Mine and Wiggins Island Coal Export Terminal (WICET) project performing the following tasks: - Preparation of Cable schedules which includes origin and destination, cable type, size and length for HV, LV and Fibre cables. Routing and termination of cables from origin to destination through Cable tray and conduits. - Providing engineering solutions for conduit layout and cable tray layout and mounting on steel work and concrete. Working with the Design team to implement the layout on the 3D model. - Provide support to sub-contractors with the completion of civil, trenching, earthing and pit works. - Design of solar lighting systems along conveyor overpasses. - Planning work time frames using Microsoft Project and Primavera P6. - Liaising with all suppliers regarding pricing, warranties and delivery schedule to adhere to required construction time frames. - Liaise with clients on a weekly basis to identify risks/issues and project outcomes. - Provide commissioning technical support for site activities. - Designing Inspection and Test Plans (ITP) and Test Sheets as part of the Commissioning and Quality Assurance (QA) work. - Document controller for projects. - Managing project costs and variations in the Forecast Project Appraisal (FPA). - Ladder Logic programming for process control systems. - Overall management of end-to-end projects with a strong focus on Australian Standards and Health and Safety. Show less

    • RCR Infrastructure

      May 2014 - Jul 2015
      Electrical Support Engineer

      • Overseeing the installation of cable ladder and catenary wire systems to support lighting and emergency fire system cabling.• Performing insulation resistance and continuity tests on installed cables before termination to equipment.• Prepare and submit daily shift reports.• Responsible for all Document Controller activities.• Prepare, submit and track all QA documentation. • Assist Foremen with forecasting of works against construction programme, design changes and commissioning.• Assist commissioning team with energization of substations and cross passages.• Commission dry fire systems and redline As Built drawings to confirm new layout.• Participate with IV (Independent Verification) to complete outstanding punchlist items.• Commitment to enforcing safety standards and general OHS requirements. Show less

    • Kirby Group Engineering

      Feb 2016 - now
      Electrical Project Engineer

      -Develop, maintain and update a range of documentation including Technical Submittals, Inspection & Test Plan, QA Plan, Cable Schedule, RFI Register, System Test Packs and Operation & Maintenance Manuel’s-Ensure all installed equipment conforms to CE Marking standards-Liaise with client and sub-contractors regarding design changes-Micromanage electrical system installations-Update distribution panel schedules according to onsite installations-Produce and close out electrical system punchlist items-Redline As-Built drawings Show less

  • Licenses & Certifications

    • EWP above 11m

  • Honors & Awards

    • Awarded to Ruairi Maher
      All Ireland Interfirm Hurling Championship GAA Oct 2011 Won the All Ireland Interfirm Hurling Championship with Analog Devices.