
Vijendra Dhamanse

Connect with Vijendra Dhamanse to Send Message
Connect
Connect with Vijendra Dhamanse to Send Message
ConnectTimeline
Skills
ScadaHvacProject engineeringElectrical engineeringVendor managementTransformerData centerTeam managementSecurityCctvUps systemsEnergyEngineeringProject planningHt/lt distribution systemAccess controlLightingEarthingVesdaContract managementAbout me
Objectives: To become a successful professional in the field of Electrical engineer & work hard towards improving my future as well as strive and contribute in a positive way for the betterment of the firm in which I work. Specialties: DG, UPS, Transformers, LT panel, HVAC, Electrical equipments, security systems Vendor management and Material procurement Infrastructure building modifications planning, approvals & execution of technical aspects Calculation of load list, Capacitor Bank, capacity of DG & UPS required for site. Installation of DG Set, UPS set, Capacitor Bank, main panels, UPS panels All AutoCAD drawings (UPS , row power, ,lighting, earthing, raceway, cctv, WLD ,VESDA, FM200, Access control,etc) for project
Education

Dr babasaheb ambedkar technological university lonere mangaon
2003 - 2007B.TECH Electrical engineeringB- Tech electrical Engineering

G R agrawal vidyamandir nagothane, roha raigad
2002 - 2003HSC SSCActivities and Societies: Ground play, cricket , kho-kho etc School up to SSC

Doctor Babasaheb Ambedkar Technological University
2003 - 2007B. tech electrical electricalB-Tech Electrical

Dr.Babasaheb Ambedkar Technological University, Lonere - Raigad
2003 - 2008B.TECH Electrical engineeringActivities and Societies: Energy losses measuring, Board competition Grading Team co-coordinator etc B-Tech Electrical Engineering

Mumbai University Mumbai
2000 - 2001Secondary school certificate First Class
Dr.Babasaheb Ambedkar Technological University, Lonere - Raigad
2003 - 2007Bachelor's degree Electrical Engineering First ClassActivities and Societies: Electrical Engineering
Experience

Sudarshan chemical Ind. Ltd
Jun 2004 - Aug 2004Worked in Electrical maintenance department, carried out preventive maintenance of electrical Machines used in chemical industry (Pumps, compressors, motors, transformers. Studied economics of Small scale industry, worked on electrical layout of chemical plant, load distribution & energy Conservation and conducted energy audit at the plant. Worked in Electrical maintenance department, carried out preventive maintenance of electrical Machines used in chemical industry (Pumps, compressors, motors, transformers. Studied economics of Small scale industry, worked on electrical layout of chemical plant, load distribution & energy Conservation and conducted energy audit at the plant.
Trainee
Jun 2004 - Aug 2004Trainee
Jun 2004 - Aug 2004

Maharashtra state Electricity Board
Jun 2005 - Aug 2005Industrial Exposure:Prolific Institute (PLC & SCADA), Thane (2week) Trainee : Alien Bradley PLC, Logical programming; Worked at 400kV Receiving End Substation Studied switchgears, maintenance of substation equipments And parameters involved in substation design Industrial Exposure: Prolific Institute (PLC & SCADA), Thane (2week) Trainee Alien Bradley PLC, Logical programming; Worked at 400kV Receiving End Substation Studied switchgears, maintenance of substation equipments And parameters involved in substation design
Trainee
Jun 2005 - Aug 2005Trainee
Jun 2005 - Aug 2005

Capgemini Invent
Jul 2007 - May 2011Facility electrical engineer• Day to day technical operations• Providing administrative support and facility engineering management of 3 office aggregating to 3 lacks Sq. ft.• Responsible for overall electrical operations & maintenance of CG offices• DG, UPS, Transformers, LT panel, HVAC, Electrical equipments, security systems• Facility works involving administrative, civil, carpentry, plumbing, gardening• Makes regular inspections of the office & Guest houses & All electrical equipments, AC units to be checked on day to day basis to avoid any break down• Vendor management and Material procurement: Seeking quotations from vendors & necessary approvals for same.• Infrastructure building modifications planning, approvals & execution of technical aspects covered in projects including all electrical modifications• Develops and implements ISO systems & processes to establish and maintain records for the operating unit.• Analyze/ recommend solution and execute the rectification process on the complaint Analysis. • Carry out routine / weekly / monthly Preventive Maintenance of Electrical installations with the help of AMC provider. Show less

Sify Technologies Limited.
Jun 2011 - Jun 2013Sr. Electrical Engineer (FMS) at III Tier Data Center•Responsibility and Handling:1) 100 kv Substation: 12.5 Mva TR, Pass breaker, Isolators, CT & PT 2) 22 kv Substation : 2MVA TR x 6Nos ,800 kvar X 6 capacitor panels3) Data Center : 1) UPS: 500kVA x 21 Nos, 2) PAC: 28 Tr x87 Nos, 3) PDU: 225 kVA x 58 Nos,4) CAC: 66 Nos, 4) DG: 2MVA x 5 nos, & 1.1 MVA x 4 nos.• Preventive Maintenance and shutdown planning• 100 % uptime: - Taking corrective action to avoid or reduce the downtime, Make sure no single point of failure in any system and maintain 100 % uptime with power and HVAC. And responsible to any power related, cooling related, TR, UPS, PAC, DG, and security related issues.• BMS Management and Monitoring: - Issue the access card and Temporary ID card, card report review. Each and every Alarm Monitoring PAC,PDU, WLD, VESDA, FM200, Fire system, CCTV, Rodent Access control, Fire extinguishers• Infrastructure: - Management, uptime / utilization report, Server Farm Management.• Customer and Vendor managements: - As per Arrangement for cage and Rack space infrastructure details provided by service delivery team, co-ordination with vendor seeking quotations and take necessary approvals and execute the work with proper channel.• Logistic: - Inward/Outward of Material, Sify Internal Asset List management• Audit: - Audit facing Internal, External and rectifying and implementation for any findings, following ISO 9001 (QMS), 20000(ITSM), 27000 (SMS).Achievements:• PF Improvement: Now PF Improved from 0.944 to 0.991 i.e. 5 % incentive in bill, aprox.18L/ Month. (Have mail appreciation)• PUE improvement: Now PUE improved from 2.10 to 1.80 (Mist magic, ODU modification, PAC return air hood, Cold ails containments, Temp sensors installation in server farms, tracking on UPS losses) • DG performance checking ( battery health, proper synchronization , radiator cooling checking, physical checking etc) Show less

CBRE
Jul 2013 - Feb 2024Property ManagerRoles and Responsibilities:• Current area and power Load: 1.52 LK SQ Feet Data Center with 2 MVA Power.• Responsibility and Handling: 1MVA x2 Nos of transformers, 1010kVA x2 nos of DGs, STP Plant, Rain water Harvesting. • Facility works involving administrative, civil, carpentry, plumbing, and gardening.• Analyze/ recommend solution and execute the rectification process on the complaint Analysis.• Infrastructure building modifications planning, approvals & execution of technical aspects covered in projects including all electrical modifications.• Housekeeping, securities ,Technicians , Plumbers, Carpenter, Gardening etc handaling• Preventive Maintenance and shutdown planning : - planning shutdown for addressing any serious issue and Prepare and execute PM Schedule for IDC Infra all above equipments , Carry out the Infra major BCPs and change Managements as per schedule and Communicate same to customers• Co-ordination with AMC Vendors: -co-ordinate with vendors in getting the service done for the equipments as per the schedule. And in any breakdown to rectification and implementation.• Vendor managements: - co-ordination with vendor seeking quotations and takes necessary approvals and executes the work with proper channel. Bills processing for payments.• Budget: seeking quotations Preparing Yearly budget, Tracking Expenses. Taking necessary approvals.• Logistic: - Inward/Outward of Material Show less

ISS Facility Services India Private Limited
Feb 2015 - Feb 2024Sr. Technical ManagerRoles:•Office Sqft Area: 2.8L Sq feet•Responsibility and Handling: 1.5 MVA x5 Nos of transformers for 5 Sections, 1010kVA x2 nos of DGs, HVAC, Hydro-pneumatic system, Parking, Rain water Harvesting, FAS, CCTV, PA Etc.•Facility works involving administrative, civil, carpentry, and plumbing.•Infrastructure building modifications planning, approvals & execution of technical aspects covered in projects including all electrical modifications.•Budget: seeking quotations Preparing Yearly budget, Tracking Expenses, Taking necessary approvals.•Team Strength: 34 People: Technicians , Plumbers, Carpenters,•Preventive Maintenance and shutdown planning : - planning shutdown for addressing any serious issue and Prepare and execute PM Schedule for IDC Infra all above equipment , Carry out the Infra major BCPs and change Managements as per schedule and Communicate same to customers.•Co-ordination with AMC Vendors: -co-ordinate with vendors in getting the PPM service done for the equipment as per the schedule. And in any breakdown to rectification and implementation.Achievements:-•Achieve Appreciation “Award for passion for performance” in Dec 2015 for WNS mumbai site.•Savings initiatives and tracking : having appreciations email on INR savings done on site,•Initiatives: Chiller in integration, Child water cassette AC installation, LED lights implementation for all the plants, water savings with zero investments, HVAC optimization uses, kitchen equipment’s switching off at night, Automation of hydro pneumatic system & HVAC makes up tanks, DG radiator cleaning.•Successfully done shutdown planning and implementation without any issue and zero down time of critical equipment 1st time in WNS.•Successfully started online software for TDM, PPM & stock inventory at WNS site.•Standardization of all technical equipment’s, documents and prepare one site as one model site of ISS.•Actively participation in the project work of entire plant 10 modifications and refurbishment. Show less

K Raheja Corp
Apr 2019 - nowBuilding Manager
Licenses & Certifications

Apple award appreciations "passion for performance"
Dec 2015
Languages
- enEnglish
- hiHindi
- maMarathi
Recommendations

Veda varun upputerla
Actively seeking for Full-Time opportunities in Design and Verification | Former CPU Core Verificati...Raleigh, North Carolina, United States
Frank ude
Stockholm, Stockholm County, Sweden
Daniel gallagher
Vice President at PIMCODublin, County Dublin, Ireland
Marlo dickens jr.
Solutions architectTallahassee, Florida, United States
Felix de haas
Revit modelleur bij van Hoogevest architectenRandstad.webp)
Alif najmi bahari (deaf)
Digital Media Manager at Alfred Design & DecorationKaiang, Selangor, Malaysia
Pawan singh
Assistant manager in Maxop engineering company pvt ltd. Insuring NPD quality in process machining & ...Jaipur, Rajasthan, India
Dylan alto
Program Director at YAI - CA START San AndreasSan Jose, California, United States
𝔼𝕟𝕘𝕣 𝐀𝐥𝐢 r̆̈ă̈z̆̈ă̈
Electrical Communication EngineerIslamabad, Islāmābād, Pakistan
Suresh r
Area Manager Operations at Pizza Hut | Area Manager Training at Pizza Hut | Ex Senior Associate City...Bengaluru, Karnataka, India
Ashish patel, p.eng
Electrical Design Engineer at PTI Transformers LPBrampton, Ontario, Canada
Anthony puricelli
Operations Manager at ThriventMorganville, New Jersey, United States
Ítalo .
Supply Chain | Logística Multimodal | Sustentabilidade em Transportes | Gestão de Projetos | Inovaç...Belo Horizonte, Minas Gerais, Brazil
Svetoslav stoychev
Regional ManagerBulgaria
Debdas chakraborty
International Country Manager | Pharma-Marketing & Sales | Strategic Business Planning & Brand Build...Kampala, Central Region, Uganda
Bhawana kushwah
HRBP at Infosys BPM | Strategic HR Consultation, Talent ManagementBangalore Urban, Karnataka, India
Chukwuekwu israel
Business Development Specialist | Business Strategist | Sales Manager |Brand Manager | Customer Serv...Lagos State, Nigeria
Joe wagner pe bcne bcee
National Sediment Management & Dredging Lead | Senior Coastal/Dredging Engineer at Black & VeatchJacksonville, Florida, United States
Shaun farrell
Experienced Business Development/Marketing ManagerGreater Portsmouth Area
Yashi shrivastava
Compute Engineer at Hewlett Packard Enterprise|Pune, Maharashtra, India
...