Qamar Rehman

Qamar Rehman

Internee

Followers of Qamar Rehman231 followers
location of Qamar RehmanLahore District, Punjab, Pakistan

Connect with Qamar Rehman to Send Message

Connect

Connect with Qamar Rehman to Send Message

Connect
  • Timeline

  • About me

    Executive Engineer UET Lahore

  • Education

    • NUST

      2009 - 2013
      Engineer's Degree Mechanical Engineering A

      Activities and Societies: • Institution of Mechanical Engineers (IMechE) Student Chapter at NUST (2011-12) • Director, NUST Olympiad (2013) • Director, Event Management, NUST Media Club (2012-13) Part of team responsible for conversion single fuel diesel to dual fuel (gas + diesel) Engine (2016)Responsible for installation of compressed air dryer at plant (2016) Involved in major overhauls of Wartsila 16V32 and 18V34SG engines (2014,2016)Involved in installation of an economizer of waste heat recovery boiler (2014)Water Jet Cutter (Final Year Project) (2013)

    • National University of Sciences and Technology (NUST)

      2009 - 2013
      Bachelor of Engineering (BE) Mechanical Engineering A

      Activities and Societies: • General-Secretary, Institution of Mechanical Engineers (IMechE) Student Chapter at NUST (2011-12) o Member of team responsible for setting up the first student chapter of the institution in Pakistan o Responsible for coordinating with Executive Committee of IMechE Pakistan o Led team responsible for organizing the intra-NUST Speak Out for Engineering Competition and the inauguration ceremony of the chapter • Director, Event Management, NUST Media Club (2012-13) o Led team of 7 members o Organ Studied B.Sc Mechanical Engineering

  • Experience

    • Trojans International Ltd

      Jun 2011 - Aug 2011
      Internee

      o Intern in Design Departmento Facilitated development of CAD Models on Pro-Engineer (Creo) Softwareo Reverse engineering of parts based on requirements given by customero Assisted Production Department in the developing machine parts

    • Descon Engineering

      Jun 2012 - Aug 2012
      Internee

      o Intern in the Project Monitoring Divisiono Facilitated team working on the Satpara Dam Projecto Worked on project scheduling and data entryo Training on in-house software (Primavera Manual Stage 2)

    • Crescent Energy

      Feb 2014 - Nov 2016
      Assistant Manager

      o Operational and maintenance responsibilities of 28 MW reciprocating engines based power plant having Wartsila engines; 16V25 Nohab (Total=3, 2.2 MW each), Vasa 16V32 (Total=2, 5 MW each) and 18V34SG (Total=2, 5.8 MW each)o Operational and maintenance responsibilities of utility equipments like Gas & Air Compressors (centrifugal, vane and screw type), Waste Heat Recovery Boilers (Total=10Ton/hr), Cooling towers, Radiators and Pumpso Calculation of fuel consumption and power generation on daily basiso Troubleshooting of overall plant on daily basis and making report accordinglyo Preventive maintenance scheduling and inventory management of mechanical spares on Maximo softwareo Maintaining and up gradation of SOPs as per plant requirementso Responsible for making annual budgetso Responsible for ISO and OEE implementation Show less

    • UET Lahore

      Nov 2016 - now
      Executive Engineer
  • Licenses & Certifications

    • Certified Software Project Manager (CSPM)

      PPMI
    • Managerial skills certified by IFC (World Bank)

      IFC - International Finance Corporation
      Apr 2012
  • Volunteer Experience

    • Managing Blood donation camps

      Issued by NUST SMME on Jan 2012
      NUST SMMEAssociated with Qamar Rehman