Ronald Parada - Industrial Engineer

Ronald Parada - Industrial Engineer

Sewing Trainer

Followers of Ronald Parada - Industrial Engineer743 followers
location of Ronald Parada - Industrial EngineerEl Salvador

Connect with Ronald Parada - Industrial Engineer to Send Message

Connect

Connect with Ronald Parada - Industrial Engineer to Send Message

Connect
  • Timeline

  • About me

    Maintenance Manager

  • Education

    • ASIMEI

      2018 - 2018
      HVAC Systems Diploma Heating, Air Conditioning, Ventilation and Refrigeration Systems Maintenance, HVAC

      - Preventive and Corrective HVAC Systems Maintenance - Air Conditioning Distributor Systems Design - Design, Installation and Operation for Water Chiller Systems.

    • ISA-INGEMAN

      2013 - 2013
      Maintenance Engineering and Cost Analysis Techniques, Projects and Inventories. Industrial Maintenance Management

      - Basic maintenance planning and scheduling processes - Maintenance cost, analysis and control - Project planning and control techniques applied to maintenance management processes- Inventory management and optimization in the maintenance area (integration with reliability techniques)

    • Universidad de El Salvador

      2001 - 2006
      Engineering Industrial Engineer
    • Universidad Francisco Gavidia

      2011 - 2011
      Supply Chain Management and Logistic Diploma Supply Chain Management
    • Universidad Don Bosco

      2011 - 2013
      Degree in Computer Integrated Manufacturing Systems. Industrial Management/Engineering, Production, Automatization and Mechatronics

      Industrial Pneumatics - Industrial Hydraulics - Processes Automatization PLC I - Processes Automatization PLC II - Automatic Control Industrial Processes Level I - Automatic Control Industrial Processes Level II - Servo Mechanism and Motion Control - Industrial Robots Programming - AGV Mobil Robots for Material Transportation - Quality Control Thought Artificial Vision - CNC Manufacturing Center Level I - CNC Manufacturing Center Level II - Manufacturing and Design Computer Assisted -… Show more Industrial Pneumatics - Industrial Hydraulics - Processes Automatization PLC I - Processes Automatization PLC II - Automatic Control Industrial Processes Level I - Automatic Control Industrial Processes Level II - Servo Mechanism and Motion Control - Industrial Robots Programming - AGV Mobil Robots for Material Transportation - Quality Control Thought Artificial Vision - CNC Manufacturing Center Level I - CNC Manufacturing Center Level II - Manufacturing and Design Computer Assisted - Industrial communication Network Level I - Industrial Communication Network Level II - Production Management in a Computer Integrated System. Show less

  • Experience

    • Fruit of the Loom

      Jan 2007 - Oct 2007
      Sewing Trainer

      As a sewing trainer, I lead the production cell operators to correctly implement the sewing methods of each of the processes necessary for the manufacture of the garment, instructing on the use and care of the different machines used, the different pieces of the product, taking care of the quality during and after the production process, determining the tack time, teaching the proposed method, carrying out time and movement studies, controlling productivity per hour and personnel control, coordinating efforts between the quality auditor and the mechanic assigned to the unit. Everything to guarantee the fulfillment of production goals in a timely manner. Show less

    • INCO

      May 2008 - Sept 2012

      I was responsible about the maintenance activities coordination, both building and production machinery, controlling inventory levels and coordinating in conjunction with the purchasing area the supply of the essential materials for the execution of the activities. Developed infrastructure projects and energy savings projects like installing efficiently lights, Inverter compressors, constant pression pump systems, etc. Performed the Preventive and Predictive Maintenance Master Plan for the company. Show less

      • Head of Production Plant

        Jan 2012 - Sept 2012
      • Head of Maintenance

        May 2008 - Sept 2012
    • YKK Corporation of America

      Sept 2012 - Oct 2016
      Maintenance Superintendent

      In this opportunity, I was leading the maintenance team executing mechanical maintenance, facilities maintenance, cleaning and gardening; I had the opportunity to bring to optimal conditions and maintain systems and equipment in perfect conditions; some of this equipment like industrial water well, different kind of water pumps, centrifugal pumps, bell pumps, etc., two Boilers 150 BHP each one, water softeners, two emergency electric generator 750 KVA each one, equipment for industrial water treatment plant, water Chiller up to 60 TOR air cooled, among other equipment and systems. One of my greatest achievements was the negotiation for the contract with the electric distributor, in which, the company reach very good savings in the electricity bill and the acquisition of an electrical sub-station on loan. I also developed many energy efficiency projects like led lighting instead fluorescent lighting, VRF air conditioning systems, changed the compressor and air dryer for inverter technology; I developed many infrastructure of the facilities and office remodeling, etc., among other responsibilities. Show less

    • Unifi Manufacturing, Inc. (makers of REPREVE® )

      Nov 2016 - now
      Maintenance Manager

      I am responsible for ensuring the optimal performance of the support equipment for the company's production work and the infrastructure of the building, managing all the activities, supplies, resources, employees and perform the projects necessary for the effective and efficient operation of the equipment assigned to the area. I am responsible for a compressors room with six Air Compressors 300 HP capacity each one, seven Air Dryers 2,000 CFM capacity each one, two Water Chiller 500 TOR capacity each one, their softener water systems and their respective Cooling Tower Systems and chemical water treatment, eleven Air Handler Units 282 Kw capacity each one, etc. Execution of all necessary activities for the correct operations of the company's facilities, lighting, mechanical ventilation, air conditioning equipment, etc., and performance energy efficiency projects to save costs; among other activities. Show less

  • Licenses & Certifications

    • Cartografía y geografía estadística

      Banco Interamericano de Desarrollo
      Nov 2022
      View certificate certificate
    • Code of Conduct Essentials 2022

      Traliant
      Apr 2022
    • Fall Prevention Standars by OSHA

      Soluciones Floruma Ltda
      Apr 2013
    • Introduction to Cybersecurity

      Cisco
      Mar 2024
      View certificate certificate
    • Maintenance Engineering and Cost Analysis Techniques, Projects and Inventories Diploma.

      INGEMAN
      May 2013
    • Computer Integrated Manufacturing

      Festo
      Oct 2013