Berk Yıldırım

Berk Yıldırım

Followers of Berk Yıldırım958 followers
location of Berk YıldırımSliema, Sliema, Malta

Connect with Berk Yıldırım to Send Message

Connect

Connect with Berk Yıldırım to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer

  • Education

    • Eskişehir Osmangazi Üniversitesi

      2009 - 2014
      İnşaat Mühendisliği
    • Ted Ankara Koleji Vakfı Özel Lisesi

      2005 - 2009
  • Experience

    • DOĞUŞ İNŞAAT VE TİCARET A.Ş.

      Dec 2014 - Nov 2018

      Al Rayyan Road Upgrade Project-The project involves the construction and development works of the most critical part of 10,7 km of Al Rayyan Road. Within the scope of the project, structures including bridges and underpasses are being constructed and upgraded but also an electrical power station, a storm water drainage network and an intelligent transportation system, treated sewage effluent networks, electrical and telecommunication networks and landscaping.-Responsible for all kinds of structural and finishing works of the longest and deepest tunnel of Qatar. ---Supervising diapghram wall works.-Supervising of structural excavation. Preparing 9 meter wall formwork according to PERI Single Sided&Double sided system regulations.Preparing shoring system formwork for top slab according to PERI system. Quantity of concrete was 7300 m3. (Qatar`s highest one) -Executing all kinds of utility works according to Qatar General Electricity and Water Corporation, Telecom, Public Works Authority and Qatar Army Forces regulations.Supervising of all subcontractors and their operations.-Overcoming high pressure groundwater with dewatering. ( 1000l/s) Show less Al Rayyan Road Upgrade Project-The project involves the construction and development works of the most critical part of 10,7 km of Al Rayyan Road. Within the scope of the project, structures including bridges and underpasses are being constructed and upgraded but also an electrical power station, a storm water drainage network and an intelligent transportation system, treated sewage effluent networks, electrical and telecommunication networks and landscaping.-Responsible for all kinds of structural and finishing works of the longest and deepest tunnel of Qatar. ---Supervising diapghram wall works.-Supervising of structural excavation. Preparing 9 meter wall formwork according to PERI Single Sided&Double sided system regulations.Preparing shoring system formwork for top slab according to PERI system. Quantity of concrete was 7300 m3. (Qatar`s highest one) -Executing all kinds of utility works according to Qatar General Electricity and Water Corporation, Telecom, Public Works Authority and Qatar Army Forces regulations.Supervising of all subcontractors and their operations.-Overcoming high pressure groundwater with dewatering. ( 1000l/s) Show less

      • Site Chief

        Oct 2016 - Nov 2018
      • Site Engineer

        Jul 2015 - Oct 2016
      • Site Engineer

        Dec 2014 - Jul 2015
    • Limak İnşaat Kuwait S.P.C

      Jun 2019 - Sept 2020
      Senior Site Engineer

      Kuwait New International Airport Terminal 2 Construction

    • ESC Group

      May 2021 - Nov 2023
      Site Civil Engineer ( Infrastructure )

      Implementing Residential Roads Of Malta .

    • Rockcut Ltd.

      Nov 2023 - Apr 2024
      Site Manager
    • ESC Group

      Apr 2024 - now
      Civil Engineer
  • Licenses & Certifications

    • NEBOSH International General Certificate in Occupational Health and Safety

      NEBOSH
      May 2025
    • IOSH Managing Safely Certificate

      IOSH