Eric Siu

Eric Siu

Piping Designer

Followers of Eric Siu745 followers
location of Eric SiuCalgary, Alberta, Canada

Connect with Eric Siu to Send Message

Connect

Connect with Eric Siu to Send Message

Connect
  • Timeline

  • About me

    PMP, CET

  • Education

    • Southern Alberta Institute of Technology / SAIT

      2009 - 2011
      Engineer Design & Drafting Piping
    • The University of Calgary

      2006 - 2009
      Economics
  • Experience

    • Worley Parsons

      May 2011 - Oct 2012
      Piping Designer

      Project - HUSKY, East Hardisty. • Responsible for drafting of Plot Plans, P&ID’s, General Arrangements, MTO’s. • Piping design using 3D modeling• Verifying clashes with all the disciplines in the 3D model design.Field Experience- Spectra Fort Nelson North Processing FacilityDevon Jackfish Phase II Site VisitStantec Fabricating Shop Visit

    • WorleyParsons

      Nov 2011 - Oct 2012

      Project- Spectra Energy, F.N.N.P.F Project (500 million) : • Verifying piping issues resolved and resinstating packs. • Yellow OFF P&IDS, Performed Piping Material Take Offs, Glycol Tracing Design.• Assist in coordinating techniques and site construction to safely do Hydrotest as well as Pnuematic test.• Assisting with the management of the Site Safety by monitoring at all time the safety conditions of the construction site• Inspection of flange faces as well as properly torqued.• Air blow Inspections dealing with glycol. Visually inspect glycol circuits.• Ensuring hydro logs are up to date on the master stick file of latest P&ID’s.• Assisted with problems with construction defects, marked up ISOS for field run. • Provide technical assistance and support to contractors to ensure the proper understanding and application of standards and procedures during erection.• Inspection of design, installation and materials for external heat tracing of piping with glycol/water medium.• Confirm all testpacks are associated with master scope of P&ID's, finding any missing spools not tested.• Coordination and inspections of final walkdowns for insulation and glycol tubing.• Re-routing pipes and field fitting on vendor skids upon clients' requests for modifications. • Walking down reinstatement packs catching punch items.• Assisted in the Naviswork Training for the employees of WorleyParsons in construction field.• Witnessed pipe straining, verifying the dials are set correctly before torqueing pumps and other equipments. Show less

      • Piping-Coordinator

        Nov 2011 - Oct 2012
      • Piping Coordinator

        Nov 2011 - Oct 2012
    • Bantrel

      Oct 2012 - Sept 2014

      Field Facilities-Pipeline inspection for above aground as well as underground during construction-Properly audit and witness trenching, boring, hydrotesting lines before laydown of a section of pipe and checking for no damage during the process of backfilling.-Safety monitored throughout the site especially for the subcontractors dealing with pipeline to ensure all procedures are followed and done prior to each task.-Inspection of shipped Mods, checking for any defects before they are put together.-Insulation walk-downs checking to required specs before release for cladding.-Checking/Tracing material count for pipes & fittings for different contracts on the project.-Verifying shoe supports as per design, and checking if they have the minimum offsets on the beam to release for insulation.-Tracking completion of undergound/above ground piping by keeping a master copy of General Arrangements and color code each section to show the status of completion.-Inspecting flange faces of mods for damages/proper preservation.-Cathodic Protection, doing a visual inspection on the thermite welds for the pipelines and witnessing a proper backfill for the cables to run up the ground for test lead stations.-Delegating day to day job tasks for each day with my colleagues for most efficient and proper coverage of our subcontractors. Show less

      • Piping Engineering

        Apr 2013 - Sept 2014
      • Piping Inspector / Engineer Tech / Field Engineer Specialist

        Oct 2012 - Apr 2013
    • E Siu Piping Designs Inc.

      Jul 2014 - Apr 2022
      Director
    • Revcon Oilfield Constructors Inc.

      Sept 2014 - Feb 2015

      Conocophillips Canada Surmont 1 - Pipeline from CPF to Wellpad 103Completing the process for multiple systems to be properly turned over, from initial construction stage to quality control (inspection/paperwork) and progressive building of turnover binders for complete system turnover to CSU. Implemented process for RFI procedure as well as properly keeping track of status, tracibility, redlining of engineering changes on drawings. Properly communicating with both client side as well as construction on RFI dispositions as well as assisting in progressive work in documenting paperwork for turnover success.

      • Quality/Turnover Coordinator

        Jan 2015 - Feb 2015
      • RFI Coordinator/ Field Engineering/ Inspector

        Sept 2014 - Jan 2015
    • Whaler Industrial Contracting Inc.

      Jul 2015 - Nov 2021
      • Project Coordinator

        May 2016 - Nov 2021
      • Project Engineering

        Jul 2015 - May 2016
    • Trotter & Morton Group of Companies

      Nov 2021 - May 2022
      Project Manager
    • BC Hydro

      Jun 2022 - now

      Construction and Contract Management Practice

      • Project Manager Team Lead

        Apr 2024 - now
      • Construction Manager

        Jun 2022 - Apr 2024
  • Licenses & Certifications