Ping Wang

Ping Wang

Intern as project assistant

Followers of Ping Wang115 followers
location of Ping WangDongli District, Tianjin, China

Connect with Ping Wang to Send Message

Connect

Connect with Ping Wang to Send Message

Connect
  • Timeline

  • About me

    Volkswagen Automatic Transmission (Tianjin) Co., Ltd. - Planning Engineer

  • Education

    • 东北石油大学

      2007 - 2011
      学士 金属材料工程
    • Universität Augsburg

      2011 - 2014
      硕士 material science
  • Experience

    • LEONI AG

      Aug 2013 - Feb 2014
      Intern as project assistant

      1. Working as assistant for project manager in R&D department to develop new type of wiring system made from Al-Cu alloys for successive reducing of cost.2. Teamwork with Labor to research the electric and mechanic properties of the new wiring.3. Master thesis with thema “ investigation of the influence of corrosion on the electrical properties of aluminum copper compound in the electrical wiring system with focus on the automobile power line-segmentation“.

    • Volkswagen Automatic Transmission (Tianjin) Co., Ltd.

      Jan 2015 - Sept 2018

      1. Plan to establish mechatronic assembly line for new DQ500 transmission and hybrid mode transmission DQ400e into VW Tianjin factory.2. Work for project definition, definition of production processes and development of new processes.3. Choose potential suppliers to responsible to implement high-tech assembly lines into VW Tianjin within the specified milestone.4. Responsible for machine inspections, installation, startup of trial production, and do final acceptance of machines till readiness for the SOP.5. Control the benchmarks for hybrid-model transmission project Q400E, e.g. cost, delivery dates and quality.6. Improve technological process in cooperation with all related departments (design and development, production, quality) regularly. Show less 1. Support in the strategic planning of the new transmission by analyzing market/customer demands and preparing decisions. 2. Tack and monitor all project process to achieve strategic goals in terms of time, cost, quality and performance so that the projects benefit from a comprehensive strategic alignment. 3. Manage the DQ500 project from the initiation stage including Lessons Learned according to Product Development Process (PEP).4. Develop future projects for electrical cars at the production site Tianjin.5. Organize and execute workshops and Kick-off meeting with international experts for establishing new Project in Tianjin. Show less

      • Planning Engineer

        May 2016 - Sept 2018
      • Trainee/Project coordinator

        Jan 2015 - May 2016
    • Beijing Benz Automotive Co., Ltd.

      Sept 2018 - Dec 2019
      Project planning engineer

      Responsible for the modification project of M274&M264 engine assembly lines as core-project coordinator. Monitoring the project milestones regarding in scheduled timeline, in order to ensure the in-time completion of project progressMaking technical specifications for engine lines according to MTM analysis.Collaboration with purchaser for equipment procurement process(negation/bidding/contract/payment)Tracking the manufacture/installation process and ensure the in-time delivery of equipment.Technical coordination with internal/external technical departments(production/development/quality).Collection of the project open issues and making risk evaluation regarding in the cost and timelines. Definition of the countermeasures and doing proper topic escalations to project manager.Organization of the regular project meetings and doing regular project reports to project stakeholdersCreation and establish of the technical process documentation and product related documentationsCreation implementation timeline of product change in terms of assembling process and make documentation of change information and the status of implementation. Show less

  • Licenses & Certifications