Dogan Cebecioglu

Dogan Cebecioglu

Mechanical Engineer

Followers of Dogan Cebecioglu907 followers
location of Dogan CebeciogluBursa, Türkiye

Connect with Dogan Cebecioglu to Send Message

Connect

Connect with Dogan Cebecioglu to Send Message

Connect
  • Timeline

  • About me

    Project Engineer

  • Education

    • Sisli Terakki

      -
    • Canadian Welding Bureau

      2015 - 2015
      Level 1 Welding Inspector Quality Control Technology/Technician
    • Lycee Saint Benoit

      2004 - 2009
      High school science

      Faaliyetler ve Topluluklar:I went to Pamukkale as a school trip. I went to Gallipoli to visit and understand cost of the freedom I was in chess team

    • Laurentian University/Université Laurentienne

      2009 - 2014
      Bachelor's degree Mechanical Engineering
    • FMV Işık University

      2017 - 2019
      Master of Business Administration - MBA
  • Experience

    • Floteks

      May 2013 - Jan 2013
      Mechanical Engineer

      - Creating molds and check the clearance.- Improving the welding quality of mouth that is joint to fuel tank- For the main project of Mr. Ali Balci I worked with, I followed the bills, manufactured parts at CNC, assembled , make welding, purchased necessary screws, tested the MACH 3 software to control 3 servo motor and DC motor of drill head with motor drives, painted the machine to blue after coating. Tested a linear motion system we were using two rails parallel to each other for each Degree of Freedom and it was challenging to make them perfectly parallel so we can even move everything that is carried at top by rotating threaded rod by hand. Daha az göster

    • Ledcor

      Jan 2015 - Jan 2016
      Quality Control

      CWB Level 1 Welding Inspector-Pipeline quality control-On site welding inspection according to WPS(from allignment to coating)-Material receiving & tracking-Pipe mapping-Hydrostatic test-Coating inspection-Data verification-NDT analysis-Ditch inspection and checking backfilling of pipeline-Construction site surveillanceCompleted the Project by following Z662 code

    • Gemlik Fertilizer Industry Inc.

      Jan 2019 - Jan 2022

      • Ammonia Plant Revamp FEED Study completed for capacity increase and decrease at specific Natural gas consumption with Maire Tecnimont and CASALE.• Enrolled in Ammonia Plant RBI system set up.• I was constantly following the requirements of EPC Contract signed with Tecnimont and acting accordingly.• Coordinating following Tie-in Lines Project from their foundations to testing in order to fulfill Employer’s Responsibilities at Urea Plant Project:o 32″ CO2 Line that continues on CO2 compressor suction lineo 14″ Fire Water Lineo 8″ Raw Water Lineo 8″ Urea Ammonium Nitrate Lineo 6″ Demineralized Water Lineo 6″ Ammonia Lineo 6″ Wastewater Lineo 4″ 76% Ammonium Nitrate Solution Line and 2″ 76% ANS Return Lineo 3″ Natural Gas Lineo 2″ Nitric Acid Lineo 2″ Potable Water Line• Fulfilled fabrication of primary tie-in supports for lines listed above. 116 types in total.• Participated Environmental Social Impact Assessment (ESIA) works.• Participated to HAZOP SIL studies for Urea Plant and some sections of Ammonia Plant; tie-in lines from Ammonia Plant to Urea Plant and Ammonia Plant Revamp Feed.• Controlling the construction site of Urea Plant and implementing Employer’s works on the site• Quality control of Project equipment and parts upon arrival to Employer’s Warehouse for Tie-in works. Periodically controlling Contractor’s Warehouse.• Document Control, letters & transmittals for ongoing Urea Plant Project with Maire Tecnimont and Stamicarbon.• Urea Plant Equipment Quality Control & Inspections (shop, warehouse, factory acceptance, site preservation)• Studying green ammonia & hydrogen, carbon capture, urea process and equipment• Reading necessary ASME & API codes and standards when needed• P&ID design review for Urea Plant. Daha az göster Mechanical Maintenance Engineer since July 2019. I am currently performing preventive maintenance, control and maintain pumps, lines (water, steam, ammonia, and nitricacid), valves, welds, heat exchangers, conveyor systems. Trying to ease the adaptation to SAP PM Module for department which is started to use at the beginning of the year. Self-improving for upcoming Urea fertilizer Plant by reading following standards API 510 & 570. Assigned to establish a RBI system for Ammonia Plant. Daha az göster

      • Project Engineer

        May 2020 - Jan 2022
      • Maintenance Engineer

        Jan 2019 - May 2020
    • Cargill

      Jan 2022 - now
      Project Engineer

      • Site works: civil works, pump installation and commissioning, tank and agitator installation, lifting plans, hydro cyclone installation, CIP design, piping works (including FRP and food grade piping), structural steel and secondary steel structure, chemical unloading station design and implementation (acetic & adipic anhydride (ex-proof)).• Contractor management: arrange multiple contractors working at same area to work in harmony by following health and safety rules (EHS). • Quality management of manufactured tanks and chemical lines• Ensured, Cargill's engineering, reliability, food safety, EHS standards and requirements are followed.• P&ID drawing via autocad mechanical 2020• Followed Cargill’s Build Project Template and Project Management Phases.• Commissioned Waxy Starch Project, including chemical unloading station and storage tanks (acetic anhydride).• Eliminated bottlenecks for Waxy Starch Project such as installation of new cooling water pump, reverse osmosis unit and sewage treatment plant.• Enrolled process risk assessments and reviews (PRA) for biogas, adipic anhydride.• Identified and solved non-conformities and MOC actions at Plant regarding Cargill • Standards, such as installing block valves for already running HCl tank, epoxy flooring, drainage system, etc.• Followed planned plant shutdowns for implementing works that requires shutdown and completed them without causing any delays at start-up.• Provided alternative for complicated parts of Projects and proceed with an alternative with both Quality, Production, Health & Safety and Maintenance Department mutually agreed to. • Decommissioned the old sulfuric acid storage tank which is failed to meet inspection criteria’s, then installed an IBC station to meet the sulfuric acid need of facility.• A Member of HACCP team. Recently our Plant had an AIB Audit at which we scored 900 out of 1000. I was in charge of eliminating mechanical non-conformities to meet with AIB requirements. Daha az göster