
Tracie Higgins
Field and Lab Technician

Connect with Tracie Higgins to Send Message
Connect
Connect with Tracie Higgins to Send Message
ConnectTimeline
About me
Environmental Professional
Education

Montana State University-Bozeman
1994 - 1998Minor American Indian/Native American Studies
Northern Virginia Community College
-Associates General Science
Montana State University-Bozeman
1994 - 1998Bachelor of Science Abused Land Rehabiliation
Montana State University-Bozeman
1994 - 1998Minor Range Science and Management
Experience

EnviroStaff Employment Agency hired out to Washington Group International
Mar 2000 - Oct 2000Field and Lab TechnicianContractor: Washington Group InternationalProject: Vasquez Boulevard/I-70 Superfund Site Two commercial/industrial areas and residential property in six neighborhoods; soil contaminated by heavy metals from two smelting plants.Collected and prepared soil samples; mapped residential property to determine placement of multiple sample points; documented all activities and procedures; and maintained sample integrity with strict chain of custody.

George Mason University
Jul 2001 - Jul 2002Administrative AssistantSchool of Management’s Deans OfficeAdministrative support to Dean, Senior Associate Dean, Managing Director of Operations and Office Manager.

Enscicon Corporation
Sept 2002 - Sept 2003Quality ControlProject: Rocky Mountain Arsenal (RMA) Superfund SiteReviewed in-depth final project documentation to ensure completeness and adherence to PMC procedures for transmittal to the RVO. Coordinated transportation, delivery and disposal of remediation waste between project sites and appropriate landfills.

Tetra Tech
Oct 2003 - Jul 2009Quality Control/Field EngineerClient: Remediation Venture Office (RVO) (U.S. Army, Shell Oil Company, and U.S. Fish & Wildlife Services)Project: Rocky Mountain Arsenal (RMA) Superfund Site Dismantled 300+ manufacturing and 150 additional structures, constructed 5 groundwater treatment plants, excavated contaminated soil, constructed 3 landfills and revegetated with native vegetation. Wildlife on site. Field Engineer: Provided oversight and documentation of subcontractors’ activities; construction of RCRA-Subtitle C Landfill, excavation of contaminated soil, re-vegetation, installation and operation of irrigation systems, and well installation. Wrote quality control reports, updated and revised project plans, procedures and drawings, wrote survey reports, and reviewed subcontractor submittals. Briefed contractor, subcontractor and client regularly on project activities. Used GIS software and GPS equipment to help identify and illustrate potential refuge-remediation conflicts. Performed ground water and soil sampling.Quality Control: Administered numerous databases; assisted with development, design, testing, training, implementation and wrote administrative and user manuals. In-depth review of project documents to ensure completeness and adherence to procedures for transmittal to the RVO. Coordinated, managed and entered into database 4,000+ tests taken during the construction of the RCRA-Subtitle C Landfill, to ensure project specifications were met. Reviewed lab and field data, identified trends and outliers. Provided presentations, information, and reports to the client, subcontractors, and other departments. Performed field project inspections, and topographical and quality assurance surveys. Managed, coordinated and reported site safety observations as site safety observer coordinator. Health and Safety Quality Scientist II: Coordinated and tracked the process of revisions to the 50+ Environmental Health and Safety Procedures. Show less

Ross Industries, Inc.
Dec 2011 - Aug 2016Sales CoordinatorSales department for commercial food packaging line of equipment; modified atmosphere and vacuum skin packaging case-ready food preparation.Managed all domestic and international sales orders; collaborated with parent company, salesmen, customers, engineering, procurement, and manufacturing departments. Entered and maintained all orders in multiple databases; worked with engineering department to develop a new database. Improved sales order process to ensure equipment was designed and built to customer’s specifications and shipped by quoted date. Diligently collected complete order documentation, increased order efficiency and ensured purchase orders were received for all required items; improved ordering process and increased revenue. Scheduled work activities and milestones exceeding desired results; created flexible plans to accommodate changes, worked through unexpected occurrences by proper planning, follow-up and adjusting as needed. Show less

Kokosing Construction Co., Inc.
Aug 2019 - nowEnvironmental AdministratorClient: VDOTProject: I-64 Widening and High-Rise Bridge (Design-Build: nine miles of roadway widening, noise barrier installation, lighting, ITS, overhead signs, special design wall, J&B's, and stormwater management facilities. High Rise Bridge construction over Southern Branch Elizabeth River, and seven bridge widenings. Job site is adjacent to jurisdictional wetlands.) Administrator: Document control, oversight and compliance with permits and regulatory agencies for project environmental records and documentation for the SWPPP (35+ binders), BMP's, Landscaping and field activities. Manage, prepare and coordinate with client, agencies, and GPC management for 5+ monthly agency inspections and daily/weekly inspections by VDOT IA of field activities and all documentation; in addition, address each inspection report. Process, schedule and coordinate corrective actions for 70-130 monthly environmental field and SWPPP observations sited by client, agencies and GPC. Facilitate weekly environmental meetings with client and GPC to discuss work activities, schedule and issues. Develop and implement multiple systems for improving and managing department processes/requirements. Field Engineer: Coordinate, plan and schedule with client, subcontractor, QC/QAM, designer, superintendents, survey and accounting on changes, modifications, updates to design products and activities. Execute purchases, confirm receipt and track inventory of materials. Maintain schedule of BMP's to track phases of work. Perform erosion, sediment control and stormwater management inspections for compliance. Address deficiencies, redlines, discharges, spills, P2 Plan and removal of hazardous waste materials. Generate inspection reports and update logs. Attend daily/weekly project meetings. Construction Environmental Manager (CEM): CEM's schedule is part-time; I manage CEM's responsibilities when CEM is not on site and ensure CEM is abreast of activities. Show less
Licenses & Certifications

OSHA 30 Hour Construction Safety & Health
Mar 2008
OSHA Supervisor Training
Mar 2008
U.S. Army Corps of Engineers: Construction Quality Management for Contractors
Jul 2005
Environmental and Safety Supervisor
Mar 2008
40 Hour Hazardous Waste Operations and Emergency Response Training
Apr 1996
8 Hour Refresher Hazardous Waste Operations and Emergency Response Training
ClickSafetyDec 2022
American Red Cross Adult and Pediatric First Aid/CPR/AED
American Red CrossSept 2022
Erosion and Sediment Control Contractor Certificate
Virginia Department of TransportationJun 2021
Recommendations

Sara wunsch
Event & Travel Coordinator | Seeking for challenging work experience |Fréjus, Provence-Alpes-Côte d'Azur, France
Zarah dalhatu
A Multi-foundational and Versatile Administrative OfficerAbuja, Federal Capital Territory, Nigeria
Rahul vijayvargiya
"""IT Engineer Embarks on Marketing Mastery Journey at KJ Somaiya Institute of Management with MBA Pur..."Mumbai, Maharashtra, India
Sebastian taborda vilariño
Especialista Marketing Digital Mi Proyecto @nexus.pixel.uy en InstagramMontevideo, Montevideo, Uruguay
Mangal sarkar
Talent scout | IT & ITES RecruitmentKolkata, West Bengal, India
Dr.mrunalika parmar
BDS,MOH LICENSED DENTIST,CPC-AAPCAbu Dhabi Emirate, United Arab Emirates
Goutham bakthavatsalam
Assistant Manager | Commercial Advisory & Transactions | SavillsChennai, Tamil Nadu, India
Abisheik j_p
Human Resources Executive at Wipro Foundation.Chennai, Tamil Nadu, India
Diana harrington
ICP-ACC | Experienced Program & Project Management Leader | Aspiring Change & Operations ManagerHouston, Texas, United States
Lucian coprinsu
Project Manager la Tehnoplus MedicalBucharest, Bucharest, Romania
Alsaedi mohammad, pmp® pmi-rmp®
Project Manager at aramcoSaudi Arabia
Ana puig palomar
Executive Coach (CPCC, PCC) & Strategic Consultant. I give support to professionals in developing th...Barcelona, Catalonia, Spain
Patricio gaston moreno
Information Systems Engineer - Computer ScienceArgentina
Noushin hussain
Business Graduate | Army Institute of Business AdministrationSylhet, Bangladesh
Reshma rajeev
Fortrea Centralized Clinical OperationsKerala, India
Laura mccartan
Helping small charities developNottinghamshire, England, United Kingdom
Tijo george roy
Business System Analyst at Village RoadshowGold Coast, Queensland, Australia
Pritam patra
Head of Design at Instrumus | Figma | Graphics Design | Btech | 3rd Year undergrad | MIT Manipal '26Udupi, Karnataka, India
Arif noviardiansyah
Indonesia
Jake huggett
Project Manager at Kent County CouncilMaidstone, England, United Kingdom
...