Goran Ilicic

Goran Ilicic

Site Manager assistant for Ada Bridge project

Followers of Goran Ilicic317 followers
location of Goran IlicicSerbia

Connect with Goran Ilicic to Send Message

Connect

Connect with Goran Ilicic to Send Message

Connect
  • Timeline

  • About me

    QA/QC Manager at Sichuan Road and Bridge (Group) Co.

  • Education

    • Faculty of Technical Sciences in Novi Sad

      -
      Master’s Degree Civil Engineering
  • Experience

    • DSD Konstruktion Serbia

      Jul 2009 - Dec 2011
      Site Manager assistant for Ada Bridge project
    • DSD Bruckenbau GmbH

      Dec 2011 - Dec 2013
      • Project Manager Assistant for Nesbru bridge

        Jul 2013 - Dec 2013
      • Technical coordinator for Schiffshebewerk Niederfinow Germany and Rail & Road Bridge Over Brahmaput

        Dec 2011 - Jul 2013
    • SRBG Germany

      Dec 2013 - Jan 2021

      Beitstadsundbrua is 580 meters long and 11 meters wide in a typical cross section.At the north end, bridge width will be extended for left storage lane.Main girder is build as the composite structure The bridge has 6 spans. The Hålogaland Bridge is a suspension bridge with a span of 1,145 meters. It is the second-longest bridge span in Norway. The span is built as a closed steel box girder and the sailing height under the bridge is 40 meters

      • Technical Manager

        Jan 2018 - Jan 2021
      • Technical Coordinator for Halogaland bridge

        Dec 2013 - Jan 2018
    • Sichuan Road and Bridge (Group) Co., Ltd. Merkezi Çin Halk Cumhuriyeti İstanbul Merkez Şubesi

      Jan 2021 - now
      QA/QC Manager

      Steel Deck Erection Works for 1915 ÇANAKKALE BRIDGE, Turkey The 1915 Çanakkale Bridge across the Çanakkale Strait in Turkey carries a newhighway connecting Europe and Asia.The 1915 Çanakkale Bridge comprises a suspension bridge, together withapproach bridges on the European and Asian sidesThe suspension bridge has a 2023 m long main span and 770 m long side spans.The bridge girder is of twin stiffened steel box girder construction, with stiffenedsteel plate decks with asphalt surfacing. The girder is structurally continuous forthe full length of the suspension bridge and has a total length of 3563 m. Show less

  • Licenses & Certifications

    • Odgovorni izvođač radova / Responsible Contracting Engineer

      Serbian Chamber of Engineers
      Apr 2023
      View certificate certificate
    • CEEQUAL assessors

      BRE Academy
      Mar 2022