Jayakrishnan Kadankot

Jayakrishnan Kadankot

Engineer

Followers of Jayakrishnan Kadankot2000 followers
location of Jayakrishnan KadankotWarrington, England, United Kingdom

Connect with Jayakrishnan Kadankot to Send Message

Connect

Connect with Jayakrishnan Kadankot to Send Message

Connect
  • Timeline

  • About me

    Bently Nevada Services Fulfillment Manager

  • Education

    • Bharathamatha

      1996 - 2005

      Activities and Societies: Coordinator Junior Chamber youth wing (Palakkad) Period: 2003-2004 Fine Arts Club Secretary Period:2004-2005 Group Captain Period:2002-2003

    • NSS COLLEGE OF ENGINEERING, AKATHETHARA

      2005 - 2009
      B-Tech Instrumentation & Control First Class

      Activities and Societies: Placement cell coordinator.

  • Experience

    • Fluid Control Research Institute

      Oct 2009 - Mar 2010
      Engineer

      • During my time with the FCRI, I learned many valuable skills on analog and digital control systems, including calibration, data acquisition electronic circuits, embedded C programming, HART communicator and compatible devices, PLCs, relay-based control systems, RS232 protocols, and transmitters.• I set up instrumentation and data acquisition systems utilizing LabVIEW programming and DAQ/USB cards, ADAM and ICP CON modules, and serial/parallel communication, also performing maintenance on hardware and software in flow labs utilizing LabVIEW and NI.• I served as a key team member participating in two projects managing instrument calibration and testing for flow meters, current and voltage transducers, counters, timers, turbine and mass flow meters, and ultrasonic level transmitters for the annual plant maintenance at Bangalore Water Supply and Sewerage Board and an automotive engine air intake mass flow meter for FCRI. Show less

    • Tata Consultancy Services

      Mar 2010 - Sept 2011
      System Engineer

      • As part of the core development team, I supplied my skills and knowledge to the creation and implementation of new software programs.• I was able to utilize my excellent communication and relationship-building skills to lead client meetings establish project requirements, liaise with our development team to strategize on project execution and create documentation, and collaborate with upper management and stakeholders. I also was a presenter, showing clients our software solutions and providing hands-on troubleshooting whenever needed. • One of my proudest accomplishments during my tenure was acting as critical support on a significant PricewaterhouseCoopers rebranding project, in which I successfully deployed an IDA application by the project deadline. Show less

    • Yokogawa

      Sept 2011 - Nov 2014
      System Engineer

      • For Yokogawa, I managed control system configuration to generate control blocks and logic/sequence based on instrument logic schematics and the process control narrative. I created static and human-machine interface graphics, installed software, and configured signal trends and control groups. I also set CAMS for alarm rationalization and directed commissioning and function testing. • Achievement-wise, I successfully installed a DCS system with a signal count of over 25000 for a Ruwais, UAE project, and delivered cybersecurity improvements through targeted system hardening, patch updates, and firewalls.• I was an essential part of engineering and FAT/SAT activities and led the design and development of documentation for distributed control systems. I also spearheaded technical specification reviews and hardware/software selection, ensuring compliance with all internal and external standards, monitoring the plant’s control network to confirm performance and safety. Show less

    • GE Oil & Gas

      Dec 2014 - May 2017
      Systems & Instrumentation Engineer

      • Overseeing installation, commissioning, and testing of Bently Nevada Machine Condition and Monitoring System (MCMS), I identified and defined requirements to develop engineering strategies. • I traveled to various sites to execute risk assessment and develop targeted safety strategies, ensuring that the installation of all equipment complied with engineering design, machine datasheets, and client/GE standards. I followed all best practices and API670 standards for all proximity, seismic probes, and temperature testing for calibration and loop checks. • I supported revenue growth by meeting with and up-selling clients to explain the benefits of additional services and products during the requirements identification phase.• I created multiple documents on engineering, rack configuration, bill of materials, network architecture, asset information, and Modbus Mapping. I also created detailed reports on network connections, capabilities, and infrastructure, including developing critical visual aids to flag gaps and support problem-solving. Show less

    • Baker Hughes

      Jun 2017 - now

      • My dedication to excellence in all tasks I undertake is consistently recognized by our management team and led to me receiving the CEO & President’s Top Work Recognition Award for Q3 2018.• Another result of my job performance is that I was recently promoted to Site Lead, managing planning and scheduling of jobs. As a specialist adept at condition monitoring, predictive and preventative maintenance, and reliability, I direct on-site technicians and engineers in all installation, configuration, commissioning, and testing of Bently Nevada Racks and related 3500, DSM, System 1, and 1900 software. I also implement Windows patch updates and Network configuration to improve cybersecurity and head up client review meetings to report on project progress and cultivate strong working relationships.• One of my latest accomplishments was to successfully minimize carryover at the ADNOC Takreer SSA, working closely with the client to develop targeted and workable delay solutions.• I execute detailed analysis to support risk mitigation, leading troubleshooting and risk strategy development. I oversee all tasks to ensure compliance, consistently meeting all milestones and objectives. Show less

      • Bently Nevada Services Fulfillment Manager

        Jun 2022 - now
      • Lead Customer Contract Management Specialist

        Apr 2019 - Jun 2022
      • Commissioning Specialist

        Jun 2017 - Apr 2019
  • Licenses & Certifications

    • System Integration Engineer Level1

      Baker Hughes, a GE company
      Jul 2019
    • Professional Networking for Career Starters

      LinkedIn
      Jul 2022
      View certificate certificate
    • Centrum VP and CS 3000 Fundamentals

      Yokogawa
      Oct 2011
    • Smart Signal Model Builder Level2

      GE Digital
    • System 1 certified

      GE
      Apr 2016
    • Production or Plant Engineer

      Engineers Australia
    • Field Engineering Programme

      GE
      Mar 2015
    • Smart Signal Tag Mapper Level2

      GE Digital
    • Smart Signals level 1

      GE Digital
      Aug 2016
    • BOSIET

      OPITO
      Feb 2015
  • Volunteer Experience

    • Youth Wing President(Palakkad)

      Issued by Junior Chamber
      Junior ChamberAssociated with Jayakrishnan Kadankot