Scott Anderson

Scott Anderson

Commercial Diver

Followers of Scott Anderson3 followers
location of Scott AndersonGreater Aberdeen Area

Connect with Scott Anderson to Send Message

Connect

Connect with Scott Anderson to Send Message

Connect
  • Timeline

  • About me

    Commercial Diver at Self Emplyed

  • Education

    • Aboyne Acadamy

      1994 - 1999
  • Experience

    • Self Emplyed

      Mar 2008 - now
      Commercial Diver

      Currently working self-employed, contracted to various diving companies - details can be seen below.

    • Shearwater Marine Services Ltd.

      Dec 2008 - Jan 2009
      Commercial Diver

      Full video inspection of 28 pier legs and anodes.

    • Zetland Marine Services Ltd.

      Feb 2009 - Nov 2009
      Commercial Diver

      Mainland, ShetlandRemoval of marine growth from hull and sides of 14 feed barges with H.P washers, and Inspection of welds and anodes.Cullivoe Peir, YellRecovery of tyres and chain from seabed front of pier, Welded 20 securing links to pile Face ready for fender attachment, cleaning sheet piling with air grinder ready for padeye Installation, welded 60 padeyes onto sheet piling, attachment of fender chains to Shackles then to padeyes secured shackles with wire.Scalloway, Shetland Inspection of oil tanker Ronya Setter,Aloy, ShetlandRemoval of marine growth from sides and hull of six feed barges with handscraper then use of an hp powerwash ,all barges were then inspected.Vidlin shore bresa,ShetlandRemoval of obstruction from starboard prop of vessel.West Burrafirth Pier, ShetlandRecovery of sixty tyres from seabed, cleaning of forty piles using hydraulic grinder ready for welding, welding of forty padeyes onto face of sheet piles, make up of fenders on surface, hanging fenders.Scalloway Habour, ShetlandCleaning of pile using hp powerwasher ready for stabilizing clamp to be fitted.Fitting of stabilizing clamp onto pile then into place using chain two chain blocks,four holes made with use of broco torch, then clamp was bolted to wave screen. Show less

    • EMAS GROUP

      Apr 2010 - Oct 2010
      Commercial Diver

      Working as BAM's main Subcontractor, AMC Subsea was resonsible for all the underwater construction works,comprising shuttering, concreting and block placement in the extension and upgrading of the existing pier to facilitate larger vessils. Divers duties included seabed surveys, airlifting seabed down to bedrock, fixing RSJs into place, topside construction of shutters, placing in Kelly bocks, attaching push pulls, securing shutter and panels, connecting stopend, bagging up stutter and concreting pouring, The average pour size was 90 cube, construction and pour of a slipway was also undertaken. Show less

    • Grampian Diving Services

      May 2011 - Sept 2011
      Commercial Diver

      Onboard the Bibby sapphire, video inspection of both moonpools found damage to a Lemon ring , grinded rough edges of lemon ring with air grinder.Montrose HarbourConcrete repairs done to harbour walls at sea bed, jack hammered damaged concrete and airlifted out, drilled holes for divy bars,then hilted them into place, set up shuttering then poured concrete.Aberdeen HarbourFitted blanks onto supply vessel Viking Dynamic to allow valves to be changed.

    • North West Marine Ltd

      Nov 2011 - Sept 2012
      Commercial Diver

      Tarbert, Harris ferry terminal, cmal, stork.Inspection of piles using UT signus meter for thickness readings, 280 anodes ranging for 35kg to 180kg was wielded onto pier, lifting dolphin and outer dolphin. 26 holes was patched using 12mm still plates.Lochboisdale south uist ferry terminal210 anodes ranging from 35kg to 180kg to be welded onto pier, outer and inner lifting dolphins.Lochboisdale south uist ferry terminalAirlifting bottom of dolphins back to bedrock, drilling of 30 dwells into bedrock set up shuttering, then did base level concrete pour .Installation of four ladders, welded on plates to cover holes on piles on outer dolphin.Kilchoen, West Coast ScotlandSlipway repairs, three patches was broken out of lower slip and reinforcing mesh put in, Airlifted end of toe and set shuttering up for concrete pour, 16 cube of concrete was Then pumped in. Show less

    • SUBTECH SERVICES LIMITED

      Sept 2012 - Dec 2012
      Commercial Diver

      Vessel- Zamil 401 client- Saudi AramcoMaintenance was carried out to following jack-ups zuluf gosp2, sfny 15, Safania 46, snfy 14, kescfonya150, majan gosp2, pnd,stny10, manifa2, works carried out included cleaning of water intakes, pen checks, and pipeline inspections.

    • North West Marine Ltd

      Feb 2013 - Jun 2013
      Commercial Diver

      Sconser isle of sky35 anodes welded onto pier legs,Portavadie Scotland.Installation of slipway using cast units.Aberdeen harbor, client - StorkInspection of sheet piles using UT meter.

    • OCEAN KINETICS LIMITED

      Jun 2013 - Sept 2013
      Commercial Diver

      Installation of cathodic protection to inner harbor, 68 frames containing 10 anodes each, were welded onto sheet piles subsea, duties were wet welding and some topside fabrication.

  • Licenses & Certifications

    • BOSIET

    • Diving Medical

    • HSE First aid at work

    • HSE Scuba

    • HSE Surface supply

    • MIST

    • OFFSHORE EMERGENCY RESPONSE TEAM MEMBER