Partha Halder

Partha Halder

Cluster Engineer

Followers of Partha Halder350 followers
location of Partha HalderKolkata, West Bengal, India

Connect with Partha Halder to Send Message

Connect

Connect with Partha Halder to Send Message

Connect
  • Timeline

  • About me

    B.TECH Mechanical Engineer | 16yr+ Experience in Industrial & Telecom Project & Maintenance of Civil Foundation | Fabrication with GI-Erection-Instruments Commissioning | Quality Assurance | Logistic | Safety | Billing

  • Education

    • Birbhum Institute of Engineering and Technology

      2004 - 2008
      Bachelor of Technology - BTech Mechanical Engineering 1

      Activities and Societies: Study, Excursion, Cricket, Volleyball, Library B. Tech Mechanical Engineering

    • Rasulpur B.M. High School

      2002 - 2004
      Science Biology/Biological Sciences, General 1

      Activities and Societies: Debate, Laboratory, General Sports, Cricket Higher Secondary with Main Science Subjects

    • Mahesh Sri Ramkrishna Ashram Vidyalaya

      1996 - 2002
      Secondary Examination Madhyamik 1

      Activities and Societies: Football, Debate, Cricket, Swimming, Drama Passed Madhyamik Examination

  • Experience

    • Ramboll India Private Limited

      Aug 2008 - Aug 2011
      Cluster Engineer

      1)Visiting Sites to Inspect Quality of Telecom Tower Foundation And Post Tower Erection.2) Prepare & Submit Quality Audit Reports with Photo for RFAI to Client Operator.3) Tower Loading Validation Analysis with Leg Buckling Measurement, SHA Projects.

    • ENERGY PLUS

      Aug 2011 - Jan 2015
      Project Engineer

      1) Erection & Installation of Boiler, Boiler Accessories, Chimney with Ducting & Auxiliary.2) Fabrication, Erection, Installation, Commissioning, Maintenance of Steam, Water, WTP, Utility, Fire Hydrant Pipeline, Fittings, Accessories with Supporting Structure & Insulations.3) Documentation maintained as per ISO 9001:2008 standard with IBR formalities as required.4) Execution of Total Project Starting from BARCHART Preparation, Planning, Material Procurement, Manpower Management, Tools-M/c Handling, Quality Assurance, Safety at Site to Billing, Payment Follow up, Commissioning Support & Final Costing Synopsis.5) Preventive, Scheduled Maintenance, Shut Down Job, Extension of Current System etc. Show less

    • Ramboll India Pvt. Ltd.

      Jan 2015 - Nov 2018
      Senior Cluster Engineer

      1) Visiting Sites to check Tower Loading Validation Analysis with Leg Bend Measurement.2) Antenna Loading Survey Visit for Re-verification of Issued Strengthening Drawing. 3) Joint Visit with STV to detailing them Strengthening Activity as per STR Drawing.4) Do Quality Audit Inspection after Site Improvement, Strengthening Activity carried out by STV.5) Prepare & Submit Quality Audit Inspection Report & Photos for issuing Final Work Completion Certificate to Customer & STV. Update the Certificate in INDUS ISQ Portal.6) Monitoring Site Improvement, Strengthening activities through Online Portal & FTP server. Show less

    • Teletech

      Dec 2018 - May 2020
      Project Manager Mechanical

      1) Monitoring Strengthening activities of Tower & Pole Sites at West Bengal & Andaman.2) Maintaining Safety of Worker & Quality of Work using proper PPE & Equipment’s.3) Monitoring Fabrication & GI activities at Own & Outsource Fabrication Units.4) Preparing Material & Fund Requisition for above activities with Monthly Roll Out Sheet.5) Arranging Manpower, Vendor, Fabricator, Hardware & Other Suppliers for above activities.6) Rate Negotiation with Vendor, Fabricator, Supplier to achieve maximum profitability. 7) Support to New Build Foundation Team for their Project as per their Requirement.8) Managing Client Relation about PO, Billing, Site Delivery, Audit Planning & Review Meetings. Show less

    • S.S CONSULTANT

      Jun 2020 - Nov 2020
      Project Manager

      1) Monitoring activities of UBR Link I & C + ATP at Sites of Kolkata & West Bengal for RJIL.2) Maintaining Safety of Worker & Quality of Work using proper PPE & Equipment’s.3) Monitoring MW Link I & C activities of CERAGON for AIRTEL.4) Monitoring Dismantling work of UBR & MW for Both the OPCO.5) Preparing Material & Fund Requisition for above activities with Monthly Roll Out Sheet.6) Managing Manpower, Vendor, Transporter, Tools & Other Instruments for above activities.7) Rate Negotiation with Vendor, Transporter, Supplier to achieve maximum profitability.8) Managing Client Relation about PO, Billing, Site Delivery, Planning, MRN & Review Meetings. Show less

    • Quality Austria Central Asia Pvt. Ltd.

      Nov 2020 - Jul 2021
      Project Lead Civil & Mechanical

      1) Monitoring New Build Tower Foundation & Erection Quality at West Bengal Circle.2) Monitoring Strengthening & Maintenance activities of Old Tower & Poles sites at West Bengal.3) Monitoring NDT, BFS, TLVA, PLVA, Cube Test activities of New & Old sites at West Bengal.4) Maintaining Safety of Engineer & Quality of Work using Proper Equipment, Tools & PPE.5) Update Daily DPR, Defect Catalogue, WIP Site Offered Catalogue, Vendor Rating, INDUS ISQ & One ATC Portal Documentation, JMS Verification, Non ISQ Product PPT Report Preparation.6) Managing Client Relation about Site Delivery (RFAI), Review Meetings, Improvement Planning.7) Audit Engineer Visit Planning, Execution Quality, Training to Engineers based on PP Analysis. Show less

    • LinkQuest Technologies Limited

      Aug 2021 - Mar 2022
      Project Manager

      1) Managing New Built Tower Foundation & Electrification activities at West Bengal Circle.2) Managing Client Relation about Site Delivery (RFAI), Review Meetings, Improvement Planning.3) Site Execution Planning, Quality, Training to Engineers for Execution & Vendor Negotiation.4) Preparing Material & Fund Requisition for above activities with Monthly Roll Out Sheet.

    • Indus Towers Limited

      Mar 2022 - Nov 2022
      Audit Executive

      1) Monitoring Technical Documentation of New Build Tower Foundation at West Bengal Circle.2) Monitoring Technical Documentation of Tower Strengthening & Maintenance at WB Circle.3) Site selection for Sample Audit of Tower/Pole Maintenance based on health report & snap shared by TSP after deep Analysis & Advance Rectification stage segregation with critical & non critical measures.4) Prepare consumed hardware material reconciliation of TM-PM activities monthly consolidation.5) New Build Joint Measurement Sheet validation of field engineers, convert to Excell & process for WCC BILL verification in INDUS ORACLE ERP system.6) Non FTR PP Analysis & preparation of PPT presentation for TSP performance review.7) Capturing all technical details of new build tower foundation & analyze for process improvement.8) Support to Daily Audit Planning with Engineer mapping as needed.9) NDT report collection & data sheet updating for further analysis reference to process improvement.10) Technical support to Field Engineers as required on audio video call. Show less

    • EKLAVYA INFRA PRIVATE LIMITED

      Dec 2022 - Sept 2023
      Project Manager

      1) Managing New Built Tower Foundation & Electrification activities at West Bengal & Odisha Circle.2) Managing Existing Tower’s Upgradation activities at West Bengal & Odisha Circle.3) Managing Client Relation about Site Delivery (RFAI), Review Meetings, Improvement Planning.4) Site Execution Planning, Quality, Training to Supervisors for Execution & Vendor Negotiation.5) Preparing Material & Fund Requisition for above activities with Monthly Roll Out Sheet.

    • HTIS Telecom

      Oct 2023 - now
      Manager Infra

      1) Managing New Built Tower & Solar & DG Foundation & Electrification activities at HPHP Circle.2) Managing Client Relation about Site Delivery (RFAI), Review Meetings, Improvement Planning.3) Site Execution Planning, Quality, Training to Supervisors for Execution & Vendor Negotiation.4) Total imapp management from site HOTO to RFAI including Online- Offline JMS, Non Standard.5) Preparing Material & Fund Requisition for above activities with Monthly Roll Out Synopsis.6) Full MIS work in ERP Portal- PO Amendment, WCC, Invoice Submission, in HTIS WFMS PO Booking, Attendance RUT, Employee- Assets Management etc.7) Safety Compliance, PTW creation to closure with ideploy documentation.8) Some Upgradation Activity of Civil & Electrical for MSC, BSC, Data Centre etc for BIL, VIL. Show less

  • Licenses & Certifications