SHETH JITESH

SHETH JITESH

Executive - Inspection

Followers of SHETH JITESH2000 followers
location of SHETH JITESHIndia

Connect with SHETH JITESH to Send Message

Connect

Connect with SHETH JITESH to Send Message

Connect
  • Timeline

  • About me

    Project Manager (Inspections)

  • Education

    • L E College of Engineering - Morbi

      1989 - 1993
      Bachlor of Industrial Engg.
    • Sarva Vidhyalay High School, Kadi

      1987 - 1989
      XII - Science Physics, Chemestry, Biology, Maths
  • Experience

    • SGS India Pvt. Ltd. Ahmedabad

      Jan 2005 - Jan 2007
      Executive - Inspection

      • Quality Surveillance/TPI of CNG, LPG and water pipeline projects. (which includes witness/review MTC of pipe fittings and consumable, PQR test , WPQT, weld visual, U.T., Review of R.T. films, sand blasting, coating thk., verification holiday test of LPE coated pipes, laying of pipe section, backfilling of pipe section, hydro testing , commissioning of pipeline.)• Inspection/ Monitoring of Mon of 3-LPE coating of various sizes of pipes. • Inspection/ Monitoring of various size of C.S. API 5L , IS: 3589 and SS pipe at SA 312 TP 304,316 at Ratnamani Metal & Tubes Asian Tubes , Heavy Metal & Tubes – Chhatral & Gandhidham, PSL- Gandhidham, Jindal - Gandhidham.• Inspection/ Monitoring of 3-LPE coating of various sizes of pipes at Site and pipe mill.• Inspection of Various type of Pressure vessel as per ASME Sec. VIII Div. 1 at ANUP Engg.- Ahmedabad, Patel Airtemp – Ahmedabad, Mazda Ltd. – Ahmedabad , Aero Engineers – Ahmedabad, Chem. Process – Ahmedabad, Aerotherm, Ingersoll Rand- Ahmedabad, Loyal Equipments, Pharma lab, Pharmatech, Ahmedabad.• Inspection of various size and type of valves at Oswal – Chhatral, Hawa Valves –Ahmedabad, M.H. Valves – Ahmedabad, Fludline valve – Ahmedabad, Fluid chem. – Ahmedabad etc.• Lead the team of 12 to 15 site engineers.• Inspection of various Piping materials, fabricated equipments and machined components.• Various type of Export inspection for total packages• Witnessing/ monitoring various Non-destructive (Visual, UT, PT., MPT, Leak Test) and Destructive testing• Compliance inspection according to P.O., Contract Document, ITPs, NDT Spec and issue a Release Note.• Review and approve the QAP, Inspection/Testing procedure and NDT procedure.• Review WPS and witness Procedure Qualification and Welder performance Test.• Review and approved the release note of inspected goods.• Co-ordination with branch office, contractors, NDT agencies, government agencies and clients.• To approve contractor monthly prog Show less

    • ABS Consulting

      Jul 2006 - Oct 2008
      Surveyor

      • Quality Surveillance/TPI of CNG, LPG and water pipeline projects. (which includes witness/review MTC of pipe fittings and consumable, PQR test , WPQT, weld visual, U.T., Review of R.T. films, sand blasting, coating thk., verification holiday test of LPE coated pipes, laying of pipe section, backfilling of pipe section, hydro testing , commissioning of pipeline.)• Inspection/ Monitoring of Mon of 3-LPE coating of various sizes of pipes. • Inspection/ Monitoring of various size of C.S. API 5L , IS: 3589 and SS pipe at SA 312 TP 304,316 at Ratnamani Metal & Tubes Asian Tubes , Heavy Metal & Tubes – Chhatral & Gandhidham, PSL- Gandhidham, Jindal - Gandhidham.• Inspection/ Monitoring of 3-LPE coating of various sizes of pipes at Site and pipe mill.• Inspection of Various type of Pressure vessel as per ASME Sec. VIII Div. 1 at ANUP Engg.- Ahmedabad, Patel Airtemp – Ahmedabad, Mazda Ltd. – Ahmedabad , Aero Engineers – Ahmedabad, Chem. Process – Ahmedabad, Aerotherm, Ingersoll Rand- Ahmedabad, Loyal Equipments, Pharma lab, Pharmatech, Ahmedabad.• Inspection of various size and type of valves at Oswal – Chhatral, Hawa Valves –Ahmedabad, M.H. Valves – Ahmedabad, Fludline valve – Ahmedabad, Fluid chem. – Ahmedabad etc.• Lead the team of 12 to 15 site engineers.• Inspection of various Piping materials, fabricated equipments and machined components.• Various type of Export inspection for total packages• Witnessing/ monitoring various Non-destructive (Visual, UT, PT., MPT, Leak Test) and Destructive testing• Compliance inspection according to P.O., Contract Document, ITPs, NDT Spec and issue a Release Note.• Review and approve the QAP, Inspection/Testing procedure and NDT procedure.• Review WPS and witness Procedure Qualification and Welder performance Test.• Review and approved the release note of inspected goods.• Co-ordination with branch office, contractors, NDT agencies, government agencies and clients.• To approve contractor monthly prog Show less

    • Punj Lloyd Limited

      Nov 2008 - Mar 2010
      Dy. Manager QA / QC

      • To assign and supervise QA/QC staff required for the different activities in the project, co-ordinate, support and assist for successful QA/QC Programs implementation at all times. • To ensure that all inspections were carried out as per applicable latest revision of documents such as QAP, ITP, Drawings, Specifications, and Method Statement etc.• Ensuring all inspection, measuring and test equipment are controlled, calibrated and maintained.• Establishing PWPS & qualify PQR as per codes / specification requirements & inline with project requirements and verify the welding consumables as per specification requirement.• Controlling the Welding Repair rate by training and tool box meeting.• Review of all Welding and NDT reports before final hydro testing of LOOPS identified.• Carry out line checking and clearing out of punch-points prior to commencing Pressure Testing and witnessing hydrostatic, pneumatic, service and leak testing of released test packages along with client representative. • Raise and monitor the Non-Conformance Reports (NCR) and Discrepancies and their closeouts for the projects internally, and by Client and liaise with Clients Quality representative for any Quality related issues.• Complete and coordinate the approval of the sites QC technical submittals to the customer • Attend the project QA/QC meetings with the Project Management, Sub Contractors, Consultants and Clients.• Co-ordinate the Client Feedbacks, Complaints, their reviews and proposals for the continued improvement of the Project Quality System. ACOMPLISHMENT Complete the total project (Mechanical works package for Utilities, Offsite & External Interconnection piping- Abu Dhabi Polymer Co. (Borouge – II)) with less than 2% weld repair. Show less

    • Bureau Veritas

      Apr 2010 - Mar 2015
      Operations Manager WCR

      • Lead a team of Sr. Inspection Engineers, Inspection Engineers and Field Inspector etc. for the overall effective operation of the area office.• Responsible for the delivery of Inspection services in conformance with regulatory and contractual obligation in West central area.• Deploy Inspection Engineers to various jobs based on job requirement, matching technical competency. • Review of Client P.O., QAP, technical specification, Data sheet etc and assist in preparing the Techno commercial offer for the Third Party Inspection services.• Ensure to provide services to clients as per their expectation and contractual obligation.• Review and approve the various QAP, welding, NDT, coating etc. procedures w. r. t. Technical section and project requirement. • Audit and approve the vendor manufacturing facilities w. r. t. client / project requirements or BV guidelines.• Inspection of vessels, pressurized storage containers, heat exchangers, steam generators, boilers, industrial piping, safety devices and pressure accessories. under PED 97/23/EC European Union and the European Economic Area• Ensure compliance of project specific quality plans.• Effective utilization of the Inspection Engineers. • Maintaining the Technical Competency Matrix of the Inspection engineers as per BV guidelines.• Monitoring of Inspection Engineers, contracts etc. as per BV Procedures.• Identifying training needs and organizing training for the inspection engineers.• Planning of resources .(including Inspection Engineer, IT support etc.)• Responsible for Timely invoicing and money receivable for the services provided to clients.• Complaint management: monitoring quality of BV services, reporting any client’s dissatisfaction / complaint and assisting in mitigating the same.• Assist Regional Manager for the growth of Industrial business. • Ensure the management system procedures are fully applied• Ensure all Health & Safety requirements are specified and implemented Show less

    • Dodsal E & C Pte Ltd

      Apr 2015 - Aug 2017
      Dy. Project Quality Manager

      ADCO NEB – III Project (EPC of Rumaitha/ Shanyel Facilities – Phase III -Wells & Clusters, Gathering and Injection System, Pipelines, Central Processing facilities, and pipeline manifold stations for ADNOC)• Coordinating Project QA activities with consortium partner GS construction and Engg. Ltd., and client ADCO.• Project Audits, Vendor Audits, NCR follow up and implementation of corrective and preventive action.• Vendor Document Review, Coordination for KOM / PIM, Conducting PIM at domestic and International vendor places.• Project vendor selection and Supplier assessment Audits• Vendor Inspection, Coordination with TPI, Release of Materials• QA/QC manpower selection• Mobilization of Quality personnel requirements in Projects, QA/QC manpower mobilization follow up.• Procedure development & Internal Audits, coordinating with External auditors, NCR follow-up and closure• Mange TPI for worldwide procurement inspection.• Responsible for all QA/QC requirements of UAE and worldwide Mechanical vendor vendor packages Piping and Pipeline bulk material, Valves, Static vessels, Pumps and Bared tee, Insulation etc.) to comply the project quality requirement.• Ensure that Contractor, Sub-Contractors and Vendors have the required competent resources, implant internationally acceptable practices and delivery of a product in compliance to Project Quality requirements.• Review, approve, monitoring and to ensure the implementation of approved vendor ITPs & Procedures for Piping materials, static and rotary equipment of domestic and international vendors.• Attend the critical stages of inspection.• Guide inspectors/ TPI on the inspection w.r.t. project quality requirement.• Ensure that product which does not conform to product requirements is identified and controlled to prevent its unintended release for delivery. • Planned visit to of the vendor for assurance of the quality system requirement as per project specification Show less

    • Bureau Veritas India

      Sept 2017 - now
      Project Manager (Inspections)
  • Licenses & Certifications

    • Lead Auditor QMS-9001:2015

      Bureau Veritas
    • PRESSURE EQUIPMENT DIRECTIVE 97/23/EC - LEVEL II

    • ASNT -SNT-TC-IA LEVEL - II IN RADIOGRAPHIC TESTING

      ULTRATECH
      Apr 2012
    • ASNT-SNT-TC-1A LEVEL II IN LIQUID PENETRANT TESTING

      ULTRATECH
      Jul 2011
    • ASNT-SNT-TC-1A LEVEL II IN MAGNETIC PARTICLE TESTING

      ULTRATECH
      Jul 2011
    • ASNT-SNT-TC-1A LEVEL II IN ULTRASONIC TESTING

      ULTRATECH
      Jun 2011
    • Diploma in International Welding Engineer

      International Welding Institute
      Aug 2008