
Sompol Tieamphacha
Welding Engineer

Connect with Sompol Tieamphacha to Send Message
Connect
Connect with Sompol Tieamphacha to Send Message
ConnectTimeline
About me
QA/QC Engineer ที่ Hicrete Products & Technology Co.,Ltd.
Education

มหาวิทยาลัยเทคโนโลยีพระจอมเกล้าพระนครเหนือ
2001 - 2005ปริญญาตรี ภาควิชาเทคโนโลยีวิศวกรรมเครื่องกล วิชาเอก เทคโนโลยีการเชื่อม 2.18Pre-Joint Review to verify the implementation of the quality program performed by the AI and the AIS Certtificate ASME U&S Stamp Pre Joint Review By Lloyd's Register check preparation of the Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), Welding personnel (WPQ / WOPQ)
Experience

Visavakit Patana Corporation Limited.(VIPCO)
Jun 2005 - Sept 2007Welding EngineerWelding Procedure Specifications (WPS) Code ASME IX Procedure Qualification Records (PQR) Code ASME IX Welding Performance Qualification (WPQ) Code ASME IX Welder/Welding Operator Qualification Test Procedure Welder/Welding Operator Qualification Test Procedure (WQT) Card Test ASME SEC IX Summary Of Welder Test Qualified Welder / Welding Operator List ASME Welder History Sheet Drawing Welding AWS D1.1

German-Thai Boiler Engineering Corporation Ltd. GETABEC
Oct 2007 - Jan 2009Engineer Department Engineer / Welding Engineer Section HeadWelding Procedure Specifications (WPS) Requirment Code ASME SEC IX 2007 by AI Lloyd's Register Requirment Code EN 287& 288 by Tuv Requirment Code ISO 15614-1,15614-8 Procedure Qualification Records (PQR) Requirment Code ASME SEC IX 2007 by AI Lloyd's Register Requirment Code EN 287& 288 by Tuv Requirment Code ISO 15614-1,15614-8 Welding Performance Qualification (WPQ) Requirment Code ASME SEC IX 2007 by AI Lloyd's Register Requirment Code EN 287& 288 by Tuv Requirment Code ISO 15614-1,15614-8 Welder/Welding Operator Qualification Test Procedure (WQT) Requirment Code ASME SEC IX 2007 by AI Lloyd's Register Requirment Code EN 287& 288 by Tuv Requirment Code ISO15614-1,8 by Tuv Requirment Code ISO 15614-1,15614-8 Preheat & Post Weld Heat Trement Post Weld Heat Treatment Work Instruction Requirment Code ASME SEC VIII ,IX 2007 by AI Lloyd's Register PSR,PR Consumable Welding Standard ASME,AWS,EN Check Result drawing Welding and Dimension Boiler TRD,ASME Visual Inspection Welding / Structural/Piping / Vessel Welder and Welding Operator Continuity Log Welding & NDE Schedule Dailly Welder Record Summary Of Welder Test Qualified Welder / Welding Operator List ASME,EN,ISO Card Test ASME SEC IX,EN Incoming Welding Consumables Inspection Report Inspection of Pre heat weld joint and Post Welding Joint Visual Check Result NDT&DT Code ASME,EN,ISO Design Drawing Welding Code AWS D1.1 Show less

Lobrothers Engineering Corporation Ltd.
Feb 2009 - Jul 2010QC Engineer Section HeadVisual Inspection Welding , Dimension,Fabrication Vessels Welding Procedure Specifications (WPS) Requirment Code ASME SEC IX 2007 Procedure Qualification Records (PQR) Requirment Code ASME SEC IX 2007 Welding Performance Qualification (WPQ) Requirment Code ASME SEC IX 2007 Welder/Welding Operator Qualification Test Procedure (WQT) Requirment Code ASME SEC IX 2007 Qualified Welder / Welding Operator List ASME SEC IX Incoming Material Plate, Pipe,Consumable Welding Requirment Code ASME SEC II Part A,C 2007 Inspection of Materials Consumable & Non Consumable Incoming Welding Consumables Inspection Report Purchase Specification Requisition For Welding Consumables Radiographic Location Map Standard Code ASME I,VIII,B31.1 Radiographic Work Order ,RT Request Contract Third Party Dimension Check,Material Identification Record Welding Quality Inspection Report ,Inspection Test Plan Review Film RT ,Review MDR ,Production Weld Record Check Result NDT&DT Code ASME,Dailly Welder Record Daily Welding & NDT Report Inspection of Pre heat weld joint and Post Welding Joint Visual Inspection during Fabrication Vessel,Structure Witness & Evaluation Of Destructive Testing Tesile Impact,Bend,Chemical etc. Take Off Material Plate , Pipe ,Check Cutting Plan List of Material,List Of Tank ,Print,Cal Weight Plate and Pipe Drawing Standard Dis head SEC VIII Show less

Kotobuki Techrex (Thailand) LTD. (New Company Japan)
Aug 2010 - May 2012Project coordinator (Contract AYT-E0 Project AJINOMOTO)Take Off Material Plate,Pipe,Flanges,Fitting And Equipment Use Tank Standard ASME ,JIS Check Cutting Plan Tank Check Drawing And Project Specifications Tank Fabrication Follow Standard Customer and Check Contact Client Before Fabrication Purchase Order All Material Production Tank Standard ASME ,JIS and Tool Equipment Factory Plan Layout Machine Check Required Materials Scheduled and Purchased Control Delivery Schedules of Project Materials Fabrication Control Material use and Cost Material Budgets Management and Control of Project Budget Profit Responsible for Contracts Payments are Invoiced Follow Progress Project Additional Works, Out With the Scope of the Original Contract, are Invoiced Prepared Schedule and Progress Weekly Report Project Customer And Report Inspector Meeting Customer Sale Engineer Tank and Contact Customer Before Estimate Tank List of Material,List Of Tank , Schedule Tank Production Control Material Stock , Follow Specifications Tank Fabrication Control Manpower Factory Follow Schedule Time Control Manpower Subcontractor Follow Schedule Time Control Welder & Fabrication follow Schedule Time Control Welding And Fabrication Tank Follow Drawing Control Manpower Subcontractor Buffing Stainless Steel Tank Control Transport Tank Send Customer At Site Incoming Material Plate, Pipe,Consumable Welding Follow Project Spec Visual Inspection Welding ,Dimension Check,Fabrication Tank Prepared Manufacturer Data Report (MDR) Contact Customer Inspector Pressure Vessel ,All Tank Carbon Steel Stainless Steel Show less

Hicrete Products & Technology Co.,Ltd. Affiliates CH. KARNCHANG PUBLIC COMPANY
Jun 2012 - nowQA/QC Engineer steel structureVisual Inspection Welding , Dimension,Fabrication construction Welding Procedure Specifications (WPS) Requirment Code AWS D1.1 2010 Procedure Qualification Records (PQR) Requirment Code AWS D1.1 2010 Welding Performance Qualification (WPQ) Requirment Code AWS D1.1 2010 Welder/Welding Operator Qualification Test Procedure (WQT) Requirment Code AWS D1.1 2010 Qualified Welder / Welding Operator List AWS D1.1 2010 Incoming Material Plate, Pipe,Consumable Welding Requirment Code ASME SEC II Part A,C 2007 Inspection of Materials Consumable & Non Consumable Incoming Welding Consumables Inspection Report NDT Request Contract Third Party Dimension Check,Material Identification Record Welding Quality Inspection Report ,Inspection Test Plan Review Film RT ,Review MDR ,Production Weld Record Check Result NDT&DT Code AWS D1.1 2010 Daily Welding & NDT Report Witness & Evaluation Of Destructive Testing Tesile Check Fit Up Welding Joint Follow Drawing Fabrication Check Final Inspection Coordinated with the construction Consult documentation Inspection Test Plan Report Dimension and NDT Undertook and managed all assigned project Inspection Painting Hicrete Products & Technology Co.,Ltd. Affiliates CH. KARNCHANG PUBLIC COMPANY Steel Fabrication Structural Project MRT Blue Line Extension , Project MRTA Green Line Extension Show less
Licenses & Certifications

กลยุทธ์จัดทำ 5ส
บริษัท เทรดมาสเตอร์อินเตอร์เนชั่นแนลAug 2013
Requirement & Internal Audit Course ISO 9001:2000
Q&A And Calibration Company LimitedAug 2007
Certified Welding Inspector (CWI)
มหาวิทยาลัยเทคโนโลยีราชมงคลกรุงเทพ UTKJun 2021
Languages
- ภาภาษาไทย
- ภาภาษาอังกฤษ
Recommendations

Sasanka sandamini
Lecturer || Bachelor of Engineering Technology (Hons) in Construction Technology - Wayamba universit...Matara, Southern Province, Sri Lanka
Ashish bengeri
Projektkoordinator Zertifizierung VansStuttgart, Baden-Württemberg, Germany
Linda e. nettels, csm, rpa
Asset Manager at Blue Sands ManagementHuntington Beach, California, United States
Ashley layton
Teacher at Everett Public SchoolsEverett, Washington, United States
Rachel fortaleza
Petroleum Engineer | Safety Officer 2Puerto Princesa, Mimaropa, Philippines
Pavan jakati
_Bengaluru, Karnataka, India
Siddarth lebonheur
Student at Arizona State UniversityChandler, Arizona, United States
Aryan saxena
Engineer at L&T Technology Services Limited | 2x AWS Certified | Docker | Kubernetes | Python Automa...Ambala, Haryana, India
Katona andrea
Pharmacist at Gedeon Richter RomaniaMureş, Romania
Fayhaa fathi
Coordinatrice Systèmes d'information (ERP) chez Laboratoires THERATunis, Tunisia
Jean-marc coevoet
Chef de projet PhotovoltaïqueGreater Lille Metropolitan Area
Thomas müller
Director | Finance & Performance bei Deloitte ConsultingBerlin, Berlin, Germany
Rohit pawar
Data Science Enthusiast | Digging Digital Gold to Drive Value and InnovationExeter, England, United Kingdom
Ahamad jeedar
Financial research analyst- Moodys| EX-Morningstar|CFA L1 candidateKozhikode, Kerala, India
Nitin khandelwal
Senior Engineer Vision Computing at Target | Ex Philips | Ex Hewlett PackardBengaluru, Karnataka, India
Conner henson, mha,cphq
Hospital Performance Specialist for UK HealthCareGreater Lexington Area
Janet josie kinkead, do
Chief Resident Physician, Family Medicine at St Joseph's Hospital, PhiladelphiaPhiladelphia, Pennsylvania, United States
Namrata shownkeen
Product @Ria Money TransferLong Beach, California, United States
Anna-marie cimarra, ccufc
Branch Manager at SLFCUSan Francisco Bay Area
Mohammad asjad raza
Mechanical Engineer Facilities management, HVAC, MEP Operation and Maintenance, Project Management,...الدوحة قطر
...