Dimitrios Panagiotopoulos

Dimitrios Panagiotopoulos

Mechanical Engineer

Followers of Dimitrios Panagiotopoulos661 followers
location of Dimitrios PanagiotopoulosGreece

Connect with Dimitrios Panagiotopoulos to Send Message

Connect

Connect with Dimitrios Panagiotopoulos to Send Message

Connect
  • Timeline

  • About me

    Engineering Manager

  • Education

    • Aristotle University of Thessaloniki (AUTH)

      1994 - 2000
      Engineer’s Degree Mechanical Engineering 7

      University Degree in Mechanical Engineering awarded by the Aristotle University of Thessaloniki, Energy sector [Grade 7: ‘Quite Good’]. Thesis entitled ‘Analysis of Basic Traffic Characteristics of EU Vehicles’ [grade 10 ‘Excellent’].

    • Elliniko Anoikto Panepistimio

      2005 - 2009
      POST GRADUATE Environmental Planning and Renewable Energy Sources 7

      Environmental Planning and Renewable Energy Sources, specializing in sustainable development as well as in the implementation of renewable energy sources and the replacement of conventional ones

  • Experience

    • Mevaco SA (MEVACO)

      Jan 2002 - Jun 2002
      Mechanical Engineer

      • Responsible for production planning, preventive maintenance, cost control. • Responsible for the installation and operation of ISO 2001.• Head of planning department.• Human Resources Manager

    • Titan Cement Company SA

      Jun 2002 - Apr 2005
      Maintenance Manager

      • Responsible for the smooth and uninterrupted operation of mechanical equipment. • Introduction of preventive maintenance methods.• Annual budget drafting and cost control. • Drawing up of annual company and department planning reports.• Responsible for monitoring the construction of the new production line and the installation of new equipment. Projects: Cement Vertical Mill, ΟΚ30.4 F.L.S. Pet Coke Vertical Mill, LOESCHE. Raw material Vertical Mill, LOESCHE Cross Bar Cooler, F.L.S. Rotary Kiln, F.L.S. Stacker & reclaimer, F.L.S  Crashers unit, M.F.L. • Study and supervision of new projects. Projects: Installation of heptahydrate iron supply equipment.  Installation of vacuum cleaning, anti-explosion system in coal mill.  Installation of automatic palletizer line in cement packaging. Show less

    • M.J.MAILLIS GROUP

      May 2005 - Jun 2008
      Technical Manager

      • Responsible for the smooth and uninterrupted equipment operation.• Introduction of preventive maintenance methods.• Annual budget drafting and cost control. • Drawing up of annual company and department planning reports.• Study and supervision of new projects-improvements.Projects: Blown Film Production Line  Paper Edgeboard Line Paper cores line

    • EEnergy

      Oct 2007 - Dec 2017
      Co-Owner
    • Thrace Group

      Jun 2008 - Feb 2013
      Technical Manager
    • Sunlight Group Energy Storage Systems

      Nov 2017 - Sept 2023
      • Maintenance Manager

        Nov 2019 - Sept 2023
      • Production Supervisor

        Nov 2017 - Nov 2019
    • JTI (Japan Tobacco International)

      Oct 2023 - now
      Engineering Manager
  • Licenses & Certifications

    • International Welding Engineers (IWE)

      WELDING GREEK INSTITUTE - WGI
      Jul 2018