Kington Lee

Kington Lee

Intern

Followers of Kington Lee561 followers
location of Kington LeeSelangor, Malaysia

Connect with Kington Lee to Send Message

Connect

Connect with Kington Lee to Send Message

Connect
  • Timeline

  • About me

    Engineering Project Manager

  • Education

    • Damansara Jaya Secondary School

      2002 - 2006
      Sijil Penilain Menengah(SPM)
    • University of Leeds

      2008 - 2012
      Master of Engineering (MEng) Mechanical Engineering Upper Second Class

      Activities and Societies: Assistant Entertainment Director for the Malaysian and Singaporean Society

    • Taylor's University

      2007 - 2008
      High School A Levels
  • Experience

    • Arachem

      May 2011 - Sept 2011
      Intern

      Arachem is an engineering company known for providing water treatment systems. They provide chemical additive equipment for all varieties of processes.As an intern I assisted in reviewing drawings and assembling electrical panels. On my final month I helped commission the Sungai Dua water treatment plant in mainland Penang.

    • NHS

      Nov 2011 - Jun 2012
      Ward House Keeper

      The main elements of the role were ensuring the delivery of cleaning, catering and minor maintenance.

    • Cosmos Engineering Sdn Bhd

      Jan 2013 - Oct 2021
      Senior Engineer

      Cosmos Engineering is a specialised engineering process contractor providing project management services to design and construct new systems for our clients.Industries: Palm oil, Latex gloves, Chemical blending, WaterResponsibilities: Tendering, design, purchasing, installation, project management, commissioning, training, and after sales service. Achievements:• Increased Hempel’s Johor paint production plant capacity from 3 million litres of paint to 21 million litres per annum. This was done by a continuous multi stage expansion and automation of their process systems over the course of 1.5 years.• Designed and built Thailand’s first latex evaporator by developing a new autonomous reactor system. • Installed pneumatic bleaching earth dispensing silos for palm oil companies to strict compliance standards. • Commissioned chemical reactors and thin film evaporators for latex and resin ink.• Installed and serviced fuel oil boilers heating systems for Marigold latex glove plants across. Through attention to detail for safe procedures on high risk machinery are necessary for these systems.• Commissioned semi-automated rubber glove dipping lines of both batch and continuous chain systems. • Relocated and automated a latex additive factory for Tiarco Malaysia. This package was a total plant redesign covering chemical blending and packaging filling solutions. It reduced their need for manpower by 1/3. • Commissioned and serviced water treatment packages for various states in Malaysia. The largest of which is the Langat 2 Water Treatment plant which is currently delivering 220 million litres per day. Show less

  • Licenses & Certifications