Alexander Kupis

Alexander Kupis

Followers of Alexander Kupis463 followers
location of Alexander KupisSweden

Connect with Alexander Kupis to Send Message

Connect

Connect with Alexander Kupis to Send Message

Connect
  • Timeline

  • About me

    Geotechnical Engineer

  • Education

    • London South Bank University

      2010 - 2015
      Bachelor’s Degree Civil Engineering 2nd Class Honours
  • Experience

    • AMEC plc

      Apr 2004 - Sept 2007

      Docklands Light Railway – responsible for compaction grouting works behind TBM in newly built tunnel between King George V and Woolwich Arsenal Assigned to various small contracts including shaft sinking, anti – flooding tanks construction (conventional ring building) using open face tunnelling machine (1800mm diameter, connection tunnels), mini piling on railway embankments in highly restrictive conditions

      • Engineering Technician

        Jan 2007 - Sept 2007
      • Engineering Technician

        Apr 2004 - Dec 2006
    • Costain Group plc

      Oct 2007 - Feb 2012
      Engineer

      - managing of compaction grouting works (existing tunnel, Jubilee Line southbound, engineering hours), coordination and supervision of subcontractors in the performance of works- engineering supervision of lift shafts construction and ticket hall extension

    • Keller

      Apr 2012 - Dec 2016

      Follo Line ProjectEngineering supervision of ruukki pilies installation Circular road for Nysa (south-west of Poland) : - engineering supervision and contract delivery- CFA large diameter piles (1200mm), CSC (controlled stiffness column) installation, ground consolidation by the use of sand-gravel columns technique- DSM (deep soil mixing)Newly built S7 motorway (north-east of Poland)- design and built, engineering supervision and contract delivery-DSM (deep soil mixing)- ground consolidation by the use of sand-gravel columns technique - engineering supervision, construction works and contract delivery including compensation and permeation grouting in environmentally sensitive locations- engineering supervision and construction works including CFA piling in very tight working area and adjacent main railway lines

      • Engineer

        Jun 2016 - Dec 2016
      • Geotechnical Engineer

        Aug 2015 - May 2016
      • Geotechnical engineer

        Apr 2012 - Jul 2015
    • Keller UK plc

      Jan 2017 - Apr 2017
      Contracts Engineer
    • BAM Nuttall Ltd

      Apr 2017 - Dec 2019
      Senior Geotechnical Engineer
    • KELLER

      Mar 2020 - Jul 2020
      Senior Geotechnical Engineer
    • Eiffage Génie Civil

      Jul 2020 - Dec 2022
      Sub Agent Earthworks HS2
    • Bachy Soletanche

      Nov 2022 - Jul 2023
      Senior Contracts Engineer

      HS2 Euston upgrade delayed by Government

    • BAM UK & Ireland

      Jul 2023 - Sept 2024
      Agent

      Transpenine Route Upgrade

    • Keller Geoteknikk

      Sept 2024 - now
      Site Manager
  • Licenses & Certifications

    • NEBOSH certificate

      THE NATIONAL EXAMINATION BOARD IN OCCUPATIONAL SAFETY AND HEALTH
      Jun 2006