
Aristotle Calonge
Project Engineer

Connect with Aristotle Calonge to Send Message
Connect
Connect with Aristotle Calonge to Send Message
ConnectTimeline
About me
Head Planning and Cost Control Engineer at EG&G Middle East
Education

Mapua Institute of Technology
2001 - 2006Bachelor's Degree Civil Engineering 83.95/100Activities and Societies: Philippine Institute for Civil Engineering, National Association for Mapua Alumni - Graduated Bachelors Degree in Civil Engineering with major in Project Management.- Passed board exam conducted by Professional Regulatory Commission in the Philippines with a grade of 83.95/100.

Global Pinoy Solution
2013 - 2013Project Management Advanced Primavera Version 6 TrainingThis is a once a week training within 2 to 3 months period teaching how to use advanced PRIMAVERA version 6 in Construction Management.

Crescent Technologies
2008 - 2008Project Management PRIMAVERA Version 3 TrainingThis is a once a week training within 2 to 3 months period teaching how to use PRIMAVERA version 3 in Construction Management.

Department of Public Works and Highways
2009 - 2012Materials Engineering Quality ControlPassed examination for materials engineering accreditation to have an authorization to review/approved test results and other quality related documents from the Philippine Government Projects.
Experience

Roscon Development Corporation
Apr 2006 - Sept 2006Project EngineerProject:- SM Supermall, Lipa Batangas Philippines (Completed)Client: ShoemartDuties & Responsibilities:1. Selecting the appropriate techniques and sequence of events for a particular project;2. Analyzing construction sites and local environments to determine appropriate logistics solutions and resources;3. Drawing up plans and presenting schedules of work, often with visual aids such as bar charts and procedures diagrams;4. Using specialist planning computer software;5. Preparing logistics plans and pricing schedules for individual projects;6. Monitoring progress throughout the construction process and comparing this with the projected schedule of work;7. Liaising with the site agent and surveyor throughout the process, making adjustments to projects as necessary;8. Providing advice and support on the development of specific systems. Show less

FF Cruz & Co.,Inc.
Nov 2006 - Jul 2010Planning and Cost Control EngineerProjects:1. Rehabilitation of Quirino Grandstand (Stadium), Manila Philippines: Mar 2008 – Jun 2010Client: Department of Public Works & Highways, PhilippinesProject Cost: Php 250 Million (USD 5.80 Million)2. Roads & Bridges along National Road, Casiguran Phil.: Feb 2007 – Jan 2009 (Completed)Client: Department of Public Works & Highways, PhilippinesProject Cost: Php 1.10 Billion (USD 25.60 Million)3. Renovation & Widening of Viaduct (Flyover), Phil: Nov 2006 - Dec 2008 (Completed)Client: Malaysia - Thailand DevelopmentProject Cost: Php 1.25 Billion (USD 29.07 Million)Duties & Responsibilities:1. Analysis, assessment, approval and monitoring of works schedule submitted by subcontractor.2. Analysis and evaluation of Impact Schedules, Extension of Time & Cost Claims.3. Participating in all meetings related to project performance, schedule review and coordination.4. Advising on the effects of design changes & coordination issues on project performance period and in preparation of reports for the higher management.5. Preparation of monthly and weekly ‘progress & scheduled works reports’ with quantified works on a weekly and daily basis to facilitate execution and progress measurement.Notable Achievements:1. Developed an efficient progress monitoring system that informed supervising engineers the critical issues & areas of concern regarding the project.2. Justified & approved to the Client a progress billing amounting over P 220 million (USD 5.1M) for the 1st two months and was able to complete a project three months ahead of schedule. Show less

Isam Kabbani & Partners
Sept 2010 - Sept 2011Senior Planning and Cost Control EngineerProjects:1. Residential, Accreditation & Research Bldg, Riyadh KSA: Mar 2011 – Mar 2013Client: King Saud University; Project Cost: SR 350 Million (USD 93.30 Million) 2. ITA Disaster Recovery Bldg, Riyadh KSA: Feb 2011 – Jan 2012Client: King Faisal Specialist Hospital; Project Cost: SR 10.70 Million (USD 2.85 Million)3. Security & Electronic Bldg, Fence & Gates, Al Hassa KSA: Oct2009–Aug2011 (Completed)Client: King Faisal University; Project Cost: SR 88.80 Million (USD 23.68 Million)4. Faculty Housing Project (100 Villas), Dammam KSA: Oct 2009 – Jun 2011 (Completed)Client: King Fahd Univ. Petroleum & Minerals; Project Cost: SR 76.50M (USD 20.40M)Duties & Responsibilities:1. Preparing Schedule of Work, Budget Reports, and Profit & Loss Reports.2. Monitoring progress and preparing progress reports using Earned Value Methods.3. Generation of Resource Loading Earned Value, Cost Loadings, Look-ahead Reports, etc.4. Discharged duties of Site Civil Engineer when required.5. Coordination with Management Consultant, Construction Department, Subcontractors, etc.6. Preparation of Recovery Schedules, Delay & Cost Analysis / Log, Extension of Time & Cost Claims.7. Making Target Comparisons to keep track of the actual progress of the project.8. Apprising the management of the issues pertaining to construction works.9. Managing a junior Planning & Cost Control Engineers.Notable Achievements:1. Successfully evaluated multiple extension of time and cost claims in accordance with contractual parameters, with recommended results being accepted and approved by the client.2. In the program consisting of multiple projects being executed concurrently, recommended to client the phasing, duration and timing of constituent projects to smooth-en cash flow to suit client’s needs. Show less

Krimmley Contracting Company
Mar 2012 - Nov 2014Head Planning and Cost Control EngineerProjects:1. Sewage Distribution System (Micro Tunneling), Madinah/Yanbu KSA: Jan 2012 – Jul 2015Client: Ministry of Water & Electricity; Project Cost: SR 270.60 Million (USD 73.00 M)2. Sludge Treatment Plant & Water Tank System, Madinah KSA: May 2012 – Apr 2015Client: Ministry of Water & Electricity; Project Cost: SR 465.80 Million (USD 125 Million)3. Bridge & Road Intersections Phase 1, Yanbu KSA: Mar 2011 – Feb 2013 (Completed)Client: Royal Commission for Yanbu; Project Cost: SR 70 Million (USD 19.00 Million)4. Abha Bridge & Road Improvement, Asser KSA: Oct 2010 – Nov 2012 (Completed)Client: Amanah of Asser Region; Project Cost: SR 149.80M (USD 40 M)Duties & Responsibilities:1. Preparing, reviewing, and analyzing a Baseline & Budget Plan to be utilized in the Projects.2. Monitoring the Progress, Updating Budget Cost, Cash Flows, and reporting major issues that causing delays of all ongoing projects. 3. Attending a Weekly Meeting with the Client Representative to present the Current Status and Look Ahead Plan for the Project.4. Generating new system as part of our Construction Management Development and proposing a Crashed Plan to help expedite Time Completion of a Construction Project. 5. Managing a Planning & Cost Control Engineers.Notable Achievements:1. Created a Work Procedural Manual that had been utilized effectively for Project Management Monitoring. 2. One of our Projects from Royal Commission (Client) was rated “Excellent Performance” due to completing the Project on Time and with good Quality of Work. Show less

Suido Kiko Middle East
Nov 2014 - Nov 2019Head Planning and Cost Control EngineerProjects:1. Waste Water Treatment Plant (12,500m3/day cap.) , Asser, KSA: Mar 2015 – Aug 2017Client: Ministry of Water & Electricity; Project Cost: SR 70 Million (USD 18.60 Million)2. Waste Water Treatment Plant (15,000m3/day cap.) Dammam KSA: Nov 2014 – Apr 2017Client: MODON; Project Cost: SR 75 Million (USD 20 Million)3. Waste Water Treatment Plant (10,000m3/day cap.) Riyadh KSA: Aug 2014 – Jun 2016Client: MODON; Project Cost: SR 70 Million (USD 18.60 Million)Duties & Responsibilities:1. Preparing, reviewing, and analyzing a Baseline & Budget Plan to be utilized in the Projects.2. Monitoring/Updating the Progress, Updating Budget Cost, Cash Flows, and reporting major issues that causing delays of all ongoing projects. 3. Attending a Weekly/Monthly Meeting with the Client Representative to present the Current Status and Look Ahead Plan for the Project.4. Generating new system as part of our Construction Management Development and proposing a Crashed Plan to help expedite Time Completion of a Construction Project.5. Creating and Reviewing the Progress Reports submitting to the Client & Top Management in weekly/monthly basis. 6. Managing a Planning & Cost Control Engineers.Notable Achievements:- Developed an Internal Progress Reporting that will monitor the status of Engineering Design and analyze its major issues for all on-going Projects in the Company. Show less

EG&G Middle East
Nov 2019 - nowHead Planning and Cost Control EngineerProject: RSLFAC Military Bases Expansion, around Saudi Arabia: May 2016 – May 2020Client: US Army Corps of Engineers ; Project Cost: USD 90.5 MillionScope of Work: Design and Construction of new facilities for expansion of military bases around Saudi Arabia under Ministry of Defense.Duties & Responsibilities:- Preparing, reviewing, and analyzing a Baseline & Budget Plan to be utilized in the Projects.- Monitoring/Updating the Progress, Updating Budget Cost, Cash Flows, and reporting major issues that causing delays of all ongoing projects. - Attending a Weekly/Monthly Meeting with the Client Representative to present the Current Status and Look Ahead Plan for the Project.- Generating new system as part of our Construction Management Development and proposing a Crashed Plan to help expedite Time Completion of a Construction Project.- Creating and Reviewing the Progress Reports submitting to the Client & Top Management in weekly/monthly basis. - Managing a Planning & Cost Control Engineers.Notable Achievements: Claimed a time extension of plus one year with additional 25% revenue cost due to delay caused by the Client. Show less
Licenses & Certifications

Advanced Excel & Dashboard Reporting Seminar
Philippine Institute of Certified Public AccountantsSept 2015
Advanced Excel and Dashboard Reporting
Philippine Institute of Certified Public AccountantsSept 2015
Advanced PRIMAVERA Version 6 Training
Global Pinoy SolutionsJun 2013
Basic Safety Procedures Training
FF Cruz & Co.,Inc.Aug 2008
Concrete Repair Seminar
HILTIFeb 2008
Rebar Anchoring & Controlled Demolition Technology Seminar
HILTIMay 2007
On the Job Training
Megaworld CorporationJun 2005
PRIMAVERA Version 3 Training
Crescent Technologies, Co. Ltd.Oct 2008
Honors & Awards
- Awarded to Aristotle CalongeRegistered Civil Engineer from Saudi Engineering Council Saudi Engineering Council Mar 2016 The Statute of Saudi Council of Engineers, which was approved by the Royal Decree No. 36/M dated on 26/9/1423 H aims to lay down principles and criteria for engineering practice and to develop the engineering profession. The article No. 27 of the executive bylaws stated that all engineers working in engineering profession in the Kingdom of Saudi Arabia have to register with the Council.
- Awarded to Aristotle CalongePassed Licensure Exam for Materials Engineering Department of Public Works and Highways Oct 2009 Licensed Materials Engineer in the Philippines accredited by the Department of Public Works and Highways were the only authorized representative to conduct material inspection, review and approved material test results, and other quality related reports/documents involved with the Government Projects.
- Awarded to Aristotle CalongePassed Licensure Exam for Civil Engineering in the Philippines Professional Regulation Commission May 2006 The practice of civil engineering within the meaning and intent of this Act shall embrace services in the form of consultation, design, preparation of plans, specifications, estimates, erection, installation and supervision of the construction of streets, bridges, highways, railroads, airports and hangars, portworks, canals, river and shore improvements, lighthouses, and dry docks; buildings, fixed structures for irrigation, flood protection, drainage, water supply and sewerage works;… Show more The practice of civil engineering within the meaning and intent of this Act shall embrace services in the form of consultation, design, preparation of plans, specifications, estimates, erection, installation and supervision of the construction of streets, bridges, highways, railroads, airports and hangars, portworks, canals, river and shore improvements, lighthouses, and dry docks; buildings, fixed structures for irrigation, flood protection, drainage, water supply and sewerage works; demolition of permanent structures; and tunnels. The enumeration of any work in this section shall not be construed as excluding any other work requiring civil engineering knowledge and application. Show less
Volunteer Experience
On Job Trainee
Issued by Megaworld Corporation on Jun 2005
Associated with Aristotle Calonge
Languages
- enEnglish
- taTagalog
Recommendations

Gabriel roekens
Team Leader - Customer Success chez OdooBrussels Metropolitan Area
Shruti agarwal
Attended St anselms sr. SecDelhi, India
Dibya ranjan pallai
Sales consultant| Digital Healthcare| Healthcare IT| MHA| B.Pharm.Navi Mumbai, Maharashtra, India
Ebenezer mtui
Self employedDemocratic Republic of the Congo
Aditya pratap singh
F.A.I.R Management Trainee at Aditya Birla Capital | SBM, NMIMS Mumbai’2023Mumbai, Maharashtra, India
Khyati thakral
3rd Year Student at Indian Institute of Management, RohtakChandigarh, India
Henry lam
Relationship Manager | Wealth Management | Private BankingLondon, England, United Kingdom
Marcos paulo
Analista de Back Office| CPA 20| Gestão Financeira| Sinqia| BRITech| FIDC| Custódia| Asset Managemen...Belo Horizonte, Minas Gerais, Brasil
Nourelhoda mohammed
Spanish Quality CoachEgypt
Ashish s.
Manager at Deloitte Middle East | Professional Certified SAP EC Consultant | SAP Activate Project Ma...United Arab Emirates
Sharon ward, ma lpc
PsychotherapistRidgway, Colorado, United States
赵博
克康(上海)排气控制系统有限公司 -质量主管Shanghai, China
Sayed darwish
HSE Manager, IDipNEBOSH, GradIOSH, CSM, LEEA, STI, ISO Lead Auditor.Riyadh, Saudi Arabia
Grahame barker
Managing Director at Essential Fitness Pty. Ltd.Cairns, Queensland, Australia
Joe r. hollen, md, cfp®
President at Open Window Financial SolutionsReno, Nevada, United States
Mohamed shabana
PMO | Program, Project Manager | Planning, Control Manager | Risk Manager | FIDIC | Governance | MS...Riyadh, Saudi Arabia
Annie hor
Client Services | Project Management | Public RelationsSingapore
Mark chapman
Laboratory Manager at MLD PathologyRosenberg, Texas, United States
Eerlapalli naga sai nikhitha
Software Engineer at Verizon || Student Peer Mentor At KL UniversityHindupur, Andhra Pradesh, India
Emilie buttet
Responsable Administratif d'Entreprise chez Actemium Morbihan (Barillec SAS)Caudan, Brittany, France
...