Vinit Said

Vinit Said

Inplant Trainee

Followers of Vinit Said694 followers
location of Vinit SaidThane, Maharashtra, India

Connect with Vinit Said to Send Message

Connect

Connect with Vinit Said to Send Message

Connect
  • Timeline

  • About me

    Assistant Manager - Program Management

  • Education

    • MSBTE

      -
      Diploma Mechanical Engineering 65.31
    • TATA MOTORS PUNE

      -
      NCVT Tool & Die Maker (PT J & F) 61.90
    • University of Mumbai

      -
      Bachelor of Engineering - BE Production Engineering 6.5 CGPA
  • Experience

    • Siemens

      Nov 2015 - Apr 2016
      Inplant Trainee
    • HOERBIGER

      Mar 2017 - Mar 2018
      New Product Development Engineer

      1.Conducting project feasibility study with design, production, Quality and sales team.2.Deployment of quality targets, reliability targets into product design and process with design team3.Preparing Design Validation plan and development of new equipment / Outsourced testing as per testing requirements.4.Preparing preliminary bill of material and identification of new child parts.5.Preparing micro level APQP time plan. 6.Preparing preliminary process flow chart.7.Planning new product operator training requirements. 8.Preparing work standard and inspection standards.9.Scheduling part build for sample submission for each customer identified milestone. 10.New tool development, trials and maintenance.11.Conducting part layout inspection, process capability study with quality team before each sample submission.12.Keeping record of THINGS GONE WRONG and THINGS GONE RIGHT for each project 13.Sub Supplier APQP approval. 14.Conducting design feasibility study, design for manufacturing and assembly with production and quality team and sign off.15.Integrating dimensional requirements into process control and design.16.Preparing Micro level tool development plan for tools jigs and fixture and monitoring progress.17.Project progress tracking and action plan review. 18.Preparing Proto Control plan, production control plan inspection standards.19.Conducting phase reviews and closure meeting with CFT team. 20.PPAP documents submission to customer.21.Conducting fitment trial and full volume production trial with quality and production department, run at rate audit.22.Process parameters validation and finalization.23.Countermeasure actions for issues faced during development and horizontal deployment. 24.Planning ramp up activities and monitoring.25.Phase wise document submission to customer Show less

    • SYNDICATE WIPER SYSTEMS PRIVATE LIMITED

      Aug 2018 - May 2022
      Senior Engineer-Program Management

      1.Conducting project feasibility study with design, production, Quality and sales team.2.Deployment of quality targets, reliability targets into product design and process with design team3.Preparing Design Validation plan and development of new equipment / Outsourced testing as per testing requirements.4.Preparing preliminary bill of material and identification of new child parts.5.Preparing micro level APQP time plan. 6.Preparing preliminary process flow chart.7.Planning new product operator training requirements. 8.Preparing work standard and inspection standards.9.Scheduling part build for sample submission for each customer identified milestone. 10.New tool development, trials and maintenance.11.Conducting part layout inspection, process capability study with quality team before each sample submission.12.Keeping record of THINGS GONE WRONG and THINGS GONE RIGHT for each project 13.Sub Supplier APQP approval. 14.Conducting design feasibility study, design for manufacturing and assembly with production and quality team and sign off.15.Integrating dimensional requirements into process control and design.16.Preparing Micro level tool development plan for tools jigs and fixture and monitoring progress.17.Project progress tracking and action plan review. 18.Preparing Proto Control plan, production control plan inspection standards.19.Conducting phase reviews and closure meeting with CFT team. 20.PPAP documents submission to customer.21.Conducting fitment trial and full volume production trial with quality and production department, run at rate audit.22.Process parameters validation and finalization.23.Countermeasure actions for issues faced during development and horizontal deployment. 24.Planning ramp up activities and monitoring.25.Phase wise document submission to customer Show less

    • Prabha Engineering Pvt Ltd

      Jun 2022 - Sept 2023
      Engineer - Press Shop (NPD)
    • TATA Toyo Radiator Limited

      Sept 2023 - now
      Assistant Manager - Program Management
  • Licenses & Certifications

    • Certified six sigma yellow belt

      Udemy
    • Certified Lean Six Sigma Green Belt

      VarSigma Consulting
      Sept 2017
      View certificate certificate