
Lokeswaran B
SITE ENGINEER

Connect with Lokeswaran B to Send Message
Connect
Connect with Lokeswaran B to Send Message
ConnectTimeline
About me
PG in construction management from NICMAR , (B-tech civil)
Education

SASTRA University
2003 - 2006B_ Tech Civil 7.76Activities and Societies: BASIC STRUCTURAL DESIGNING First Prize Fourth Semester GEO TECHNICAL ENGINEERING-1 Second Prize Fifth Semester

SMVM POLYTECHNIC
2000 - 2003Diploma in Civil Civil Engineering 7.46Activities and Societies: NCC B CERTIFICATE

NICMAR University
2021 - 2022Postgraduate Degree in Construction Management Civil Engineering
Experience

ARUN EXCELLO INFRASTRUCTURE PVT.LTD
Jul 2006 - Sept 2007SITE ENGINEER1 Result oriented Civil Engineer experience as Site Engineer in Project Management, Construction Operations2 I Successfully Completed 256 Rooms of Hostel Building Construction For SASTRA University. 3 Worked in detailing and quantity estimation.4 Worked in leveling using theodolite.5 Ensure that the executing and completing the construction works in accordance with the specified standards and specifications within the contractual period.6 Foundation, earth work and Column markings. Show less

Sheladia Associates, Inc.
Nov 2007 - Mar 2009ASSISTANT TRANSPORT ENGINEER1. Feasibility Reports for various Road Projects for Pretender purpose.2. Worked in Traffic Analysis, OD Surveys and analysis, Turning Movement traffic counts and analysis Also.3. Inventory Surveys Like Road Inventories Bridges Culverts etc.4. Pavement Condition analysis.5. Axel load Survey.6. BBD Survey.

Janapriya Upscale
Mar 2009 - Mar 2010QAQC PROJECT ENGINEER1. Worked in Arcadia project total no of stories are 5 and having 960 no of flats.2. Execution of work as per Drawings is correct are not.3. Having Experience in Latest German Technology Form Work like PERI and NOE.4. Reinforcement Detailing and Concrete Mix design.

Aliens developers PVT. LTD
Mar 2010 - Jul 2010QA/QC Project EngineerWorked in the project of Space Station 1 which is having total no of flats 2600 numbers and the number of stories are 30.• Execution of work as per Drawings is correct are not.• Reinforcement Detailing and Concrete Mix design.• New designed Aluminum Form work checking for shear wall.

Shapoorji Pallonji Group
Aug 2010 - Jun 2012QA/QC EngineerWorked in execution of IT building And Multi level Car parking.• Execution of work as per Drawings is correct are not checking the form work as per form work scheme drawings.• Reinforcement Detailing and Concrete Mix design.• Check the BOQ and Technical specification and preparing quality plan as well as Method of statement for different works.• Execution of Internal road works and water proofing works.• In coming material checking and maintaining the checklists and all other quality related document for the purpose of Internal as well as external auditing.• And also implementing the OSHAS safety to protect the environment as well as optimum utilization of men and machinery as well as better quality product. Show less

Larsen & Toubro
Jun 2012 - Sept 2015QA/QC Assistant manager1. Worked in Viaduct Team for L&T Hyderabad Metro Rail Project in line with Quality and Safety norms as per Company Standards.2. Work Procedures, Mix design As per Required Grades3. Quality Management System Audits and Training's as per Calendar and Company Norms and frequency.4. Check the Project Technical specification and preparing Test plan as well as Method of statement for different works.5. Execution Inspection Foundation Pier Pile Portal beams, Cantilever Pier and Bearing Pedestal Seismic arrester Survey Checking Reinforcement and Shutter As per Drawing. 6. Casting Of Precast segments profile and Reinforcement Checking 7. Erection of Segments with Gantry Guarder stressing gluing (dry matching), Expansion joint, Vertical Bearings8. Material Inspection and Third-party Testing Like anchor Cone, Wedges, HDPE Pipes, HT Strands, Segmental bonding Agent, Curing Compound and Other Regular Concrete ingredients. Show less

Balmer Lawrie & Co. Ltd.
Nov 2015 - nowProject Manager CivilWork/project-2: Executing structural repair work for the company residential apartment at Nerul, The cost of project is 4 cores. Working in the execution of construction of office building. The estimated cost of the project 30 core. Role: Ensuring the quality of repair works as per approved methodology. Checking of measurements for the executed works, certifying the bills . Conducting monthly review meetings with contractor and structural consultant. Worked in the execution of, different structural repairs like FRP, FRCM and other process as per structural strengthen based on the severity. Work/project-1: A multi-modal logistics hub (MMLH) is being set up at the EXIM Park in the western sector of Visakhapatnam Port Trust (VPT) at an estimated cost of Rs 211.02 crore. Role: In MMLH project following Construction works done. o 1). 1.2 Km Railway line construction o 2). Civil and structural erection of 10,000 Sq. Ambient temperature Warehouse, 2,900 Sq. Temperature controlled Warehouse, o 3). Construction of 23 no’s individual amenities total built-up area is 28,000 Sq. o 4). Construction of 33 acres of heavy-duty Pavement along with Geogrid and geotextile and respective mechanical layers like WMM, GSB, M50 grade interlocking paver blocks. Planning and overseeing execution of the complete gamut of civil jobs. Management of PMC in terms of review, finalization and approval of specifications, design & drawings, work schedules, payments, etc. Overseeing all tendering and job certification matters related to civil works to be undertaken. Monitoring work progress, deployment, and utilization of resources. Review, report and initiate necessary actions to ensure timely completion of civil jobs of the project within approved cost. Show less
Licenses & Certifications

AUTO CAD
Languages
- enEnglish
- hiHindi
- teTelugu
- taTamil
Recommendations

Curt garner
Financial Advisor | Helping Clients Achieve Financial Freedom & Retirement Goals | Investment Strate...Arvada, Colorado, United States
Joseane santos
Gerente de suporte técnico em empresa de tecnologia.Recife, Pernambuco, Brazil
Ahmos ali
Construction ManagerKuwait
Maniragaba ronald
IT Officer - Victoria Equipment LTDNakawa, Central Region, Uganda
María alejandra pupo leaño
Senior Marketing @ MGM Innova Group | MBA MarketingMexico City, Mexico
Mohammed rass abbasi pmp®️ prince2®️
Project management professional , People ManagerMaharashtra, India
Mandy nakhle
MD | General Surgery ResidentBerlin, Berlin, Germany
Adriana coelho
Arte Manager, dancer, coreographer, audiovisual producerAdelaide, South Australia, Australia
Jasmina nikolić
Software Engineer at ImprooveSerbia
Antony davis
Information Technology and Services ProfessionalUnited Arab Emirates
Himanshu bajpai
Program and Delivery Management, Client Engagement and Product OwnerNoida, Uttar Pradesh, India
Mahmoud jabal
LUXURY RETAIL | WATCHES & JEWELLERY | GIAKuwait
Timothy paulsen
Printer Technician at Konica Minolta South AfricaPort Elizabeth, Eastern Cape, South Africa
Dineo letsoela
Order Clerk at Combined Marketing Services (CMS)South Africa
Robin arjona
Technology & Project Management Expert | Innovation & Digital Transformation SpecialistPanamá, Panama
Mursal m houssain
Longueuil, Quebec, Canada
Abhilash rath
Software Engineer - PhonePe | Ex- SenSenMumbai, Maharashtra, India
Richard porath
Co-Founder & COO @ OLLMOO | Future Women LeadersBerlin, Berlin, Deutschland
Abinaya devaraj
Enthusiastic Professional in Container terminal with expertise in EDI & Import/Export operations. P...Chennai, Tamil Nadu, India
Adam sittler, p.eng.
Senior Exploitation Engineer | Saturn Oil + GasGreater Calgary Metropolitan Area
...