Khalid Nouh

Khalid Nouh

Maintenance and Planning Department

Followers of Khalid Nouh1000 followers
location of Khalid NouhJubail, Eastern, Saudi Arabia

Connect with Khalid Nouh to Send Message

Connect

Connect with Khalid Nouh to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer | PMP|| RCA || SAP|| Premvera P6|| KPI|

  • Education

    • ELS- Houston, USA

      2015 - 2015
      English Language
    • Oklahoma State University

      2016 - 2020
      Bachelor's degree Mechanical Engineering 3.56 out of 4
  • Experience

    • Aramco

      Aug 2006 - Dec 2014
      Maintenance and Planning Department

      Saudi Aramco – Safaniya Oil Field, Eastern Province, Saudi Arabia Responsibilities:• Convert notification to work order.• Identify spares required and review with supervisor.• Plan, schedule and review daily activities with maintenance supervisor.• Follow up for material and service required in daily basis including PR creation.• Attending OPS/Main daily meeting and provide feedback to OPS.• Organized and distributed employee tasks with deadlines to follow each task.

    • Sadara Chemical Company

      May 2021 - Jul 2022
      Mechanical Engineer

      Method Statement and procedure review of Tanks, Vessels, Column, Drums, Heat Exchangers.• Inspection & Testing Plan (ITP) preparation along with Maintenance, Asset Integrity, Operation andLSTK Contractors.• Quality Plan Preparation, Review, and approval.Execution and Control:• Monitoring of Method Statement implementation during execution:- Tank- Heat Exchanger- Tower / Column• Issuing NCR (non-conformance report) for wrong practices during execution.• Monitor and control ITP ‘Hold Point Inspection’ along with Maintenance, Asset Integrity Dept, Operation and LSTK Contractors.• Conduct training for Operations on Blind Management before execution.• Rework and document ITP Hold Point observation.• Keeping full record of Field Inspection Report from NDT methods like (IRIS, Magmatic Particle Test,DPT, Radiographic Insp., Rotating Camera, Drones, UT, PAUT, etc. for future action and reference.Project Planning:• Maintenance Project Scope finalization.• Job Package review and approval.• General Assembly drawing verification (compare between OEM and As-Built drawing to avoid wrongmaterial or execution during execution).• Flange connection chart verification (Torque value as per Torque Table. Gaskets, Nuts & Bolts as perIsometric Drawing and P&ID.).• Method Statement & ITP verification. Show less

    • KEMYA

      Jul 2022 - Mar 2024
      Major Maintenance & Turnaround Cracker Planning Engineer

      Major Maintenance & Turnaround Mechanical Planning Engineer❖ Responsibilities:• Turnaround Strategy & Initiation Phase:- Defining TA site team with roles and responsibilities, TA Milestone schedule, progress,Monitoring Road map schedule, TA communication plan for all phases.• Turnaround Scope Development phase:- Preparation of TA Job list and development intermediate scope.- Scope review.- Challenge and Validation workshop.- Conduct Uncertainty evaluations and define a mitigation plan.- Create an intermediate plan, schedule, and release of the level #1 schedule.• Turnaround Planning & Scheduling phase:- Risk register meeting and follow-up.- Detailed plan on work order level and schedule.- To quantify schedule uncertainty.- TA Scope and Schedule authorization.- Ordering of Materials, Finalization of resources and plan.- Finalization of resources and plan.- Ordering of services and securing TA Services.- Final schedule release.- TARA Audits.- Review of bar charts.• TA Pre-execution phase:- Arranging for Pre TA work completion, plan for mobilization of all resources.• TA Execution phase:- Daily review meeting and update.- Report daily progress updates.- Follow-up execution activities.• Post Turnaround Work / Turnaround Close out phase:- Collection of Contractors and In-house reports related to TA.- Conduct Lesson learn meetings and capture inputs.- Follow up for the completion of action items assigned as per lesson learn meeting.- Update and archive TA documents for future reference.❖ Major Projects/Turnarounds:• TA Olefin Plant 2024: 283 Package preparations are completed. Show less

    • TASNEE

      Mar 2024 - now
      Engineer, Planning Department
  • Licenses & Certifications

    • PMP

      Aramco
    • Mechanical Engineer

      Saudi Council of Engineers
    • Vice President of Saudi Student Association at Oklahoma State University – United State

      Saudi Arabian Cultural Mission
      Jan 2017
    • SAP

      Aramco