Ridhuan KAMARUDIN

Ridhuan kamarudin

bookmark on deepenrich
location of Ridhuan KAMARUDINSelangor, Malaysia
Followers of Ridhuan KAMARUDIN1000 followers
  • Timeline

  • About me

    Initial Airworthiness | Continuing Airworthiness | Design | Production | Operation

  • Education

    • Unikl-malaysian institute of aviation technology

      2009 - 2011
      Bsc.(hons) aircraft engineering technology (mechanical) aircraft engineering, aerospace, aviation 3.80/4.00

      Aktiviti dan Persatuan:LED airworthiness research Conducted research titled "Testing of LED Navigation Light for Airworthiness IlluminanceCompliance" in collaboration with Malaysian National Metrology Lab (SIRIM-NML) and Caed Sdn Bhd. The research was supported by AveoEngineering ( Malaysia ) Sdn Bhd and Solair Helicopters.

  • Experience

    • Hm aerospace sdn bhd

      Jul 2006 - Jan 2006
      On job training

      Assisting MRO company technical operation. Work involved participating in scheduled maintenance programme of Malaysian registered 9M aircraft : Diamond DA40/DA42 , Socata TB10. Process familiarization on Thillert and Lycoming engines.Process familiarization on FADEC system, Garmin G1000 Glass cokcpit and Composite Field Repair process.Process familiarization on MRO supply chain and logistic of a pilot training facility.

    • Aveo engineering group, s.r.o.

      Jan 2012 - Jan 2015

      Job covers local and International network liaising. Multirole job covers many aspects of Quality Control/Assurance and Production: DCAM Aerospace Equipment Certification, Quality Control and Production planning work scope. Assigned to produce and develop several certification programme of new aerospace equipment. Develop Plan for Certification of new equipment to be certified parallel with the compliance to US-FAA Technical Standard Order (FAA-TSO Products) under the supervision of Department of Civil Aviation Malaysia (DCAM) and current US FAA-DCAM Bilateral Agreement .Analyse and accept DO-160 Environmental Test Report as well produce Verification Plan for TSO approval completion..Certification programme covers the most of the test listed in RTCA DO-160B/E/F and latest revision on DO-160G; “Environmental Conditions and Test Procedures for Airborne Equipment”; Temperature and Altitude, Vibration analysis and compliance, Operational shock, temperature analysis and compliance, Power input and RF susceptibility and Lightning induced susceptibility. Tunjukkan kurang

      • Senior Engineer

        Jul 2011 - Jan 2015
      • certification engineer

        Jan 2012 - Jan 2012
    • Airbus helicopters

      Jan 2017 - Jun 2019

      Maintenance programme preparation for AS350B3e, EC135P2, EC155B/B1. MEL developement and CAMO exposition approval and 2nd Level procedure.Preparation on various modification project involving avionics system and structure i.e. camera mount, HF system KHF 950 /KHF1050, Cabin interior..etc. Approved Airworthiness Review Staff (JPA-AP7, DCAM Form 4 holder) Rated for EC120B, EC130,AS350B3e, EC135 series, AS365N3 and EC155B/B1.

      • Senior Airworthiness Review

        Jul 2018 - Jun 2019
      • Engineering Services/Design Engineer / SCE

        Feb 2015 - Jan 2018
      • Airworthiness Review Staff

        Jan 2017 - Jul 2018
    • Airbus helicopters

      Feb 2020 - Jan 2023

      Continuing Airworthiness Management Organisation for Airbus Helicopters Malaysia .

      • Assistant Manager - Airworthiness Review

        Jul 2019 - Jan 2023
      • CAMO manager (Interim)

        Feb 2020 - Jan 2020
    • Delta aerospace sdn bhd

      Feb 2023 - Feb 2024
      Aircraft certification manager
    • Airbus

      Feb 2024 - now
      Head of camo
  • Licenses & Certifications

    • Permit to fly signatory

      Civil aviation authority malaysia caam
      Apr 2019
    • Airworthiness review staff

      Civil aviation authority of malaysia
      Sept 2017