Ariya Dwinanto

Ariya Dwinanto

Geothermal associate

Followers of Ariya Dwinanto349 followers
location of Ariya DwinantoIndonesia

Connect with Ariya Dwinanto to Send Message

Connect

Connect with Ariya Dwinanto to Send Message

Connect
  • Timeline

  • About me

    Drilling / Workover Site Manager at PT Chevron Pacific Indonesia

  • Education

    • Sma8

      -
    • Sma8

      -
    • Institut Teknologi Bandung (ITB)

      2010 - 2013
      Master of Science (Msc.) Geothermal energy engineering 3.50

      Activities and Societies: Exhibition leader on 1st ITB Geothermal Workshop committee; Toastmasters International (Educational NGO) member; Asosiasi Panas Bumi (API) member These recent years I passed essential courses for geothermal field development purpose in drilling planning, geothermal reservoir engineering, geothermal production engineering, geothermal prospect evaluation and other related courses at ITB geothermal engineering magister program. I learned about geothermal energy as a part of a clean and sustainable energy. I learned about oil/gas and geothermal differences that will efect the planning operations.My thesis is about Aerated… Show more These recent years I passed essential courses for geothermal field development purpose in drilling planning, geothermal reservoir engineering, geothermal production engineering, geothermal prospect evaluation and other related courses at ITB geothermal engineering magister program. I learned about geothermal energy as a part of a clean and sustainable energy. I learned about oil/gas and geothermal differences that will efect the planning operations.My thesis is about Aerated Underbalance Drilling Screening Assessment at a Geothermal Field. It helps the quantitative and qualitative decision whether the underbalance drilling is feasible or not. The decision is based on wellbore stability, loss circulation, reservoir damage, stuck-pipe incident, hard drilling and cost benefit. Then it goes to the decision for constructing a feasible bottom hole pressure window area. Show less

    • Institut Teknologi Bandung (ITB)

      2003 - 2008
      Bachelor of Engineering (BE) Industrial Engineering

      Industrial Engineering in Institute Technology Bandung, majoring in manufacturing system is about how to make a manufacturing system in the most effective and the most efficient way. In my final assignment, I succeeded to improve the logistic business at PT. Toa Galva – Industries. The new warehouse layout associating with a new storage assignment improves the efficiencies of the order picking system within the warehouse

  • Experience

    • Lembaga Afiliasi Penelitian Industri (PT. LAPI-ITB)

      Oct 2012 - Jan 2014
      Geothermal associate

      Project 1:Jawa-Bali Geothermal Prospect Evaluation for PertaminaEvaluate 71 prospects in Java and 5 prospects in Bali based on geology, geochemistry and geophysics data to produce conceptual model and resource/reserve estimation.Project 2:Sibayak, North Sumatra Economic Feasibility StudySimulate reservoir with wellbore analysis and technical resource data (PT survey data) to get the Power output. Cost and Benefit analysis of several scenarios on the development result data. The conclusion is the best development scenario.Project 3:Sibayak, North Sumatra Development EvaluationEvaluate Sibayak field base on Pressure-Temperature logging data. Simulate wellbore to predict the wellbore behavior on standard hole and big holes. And giving a suggestion about what is the best development scenario regarding reservoir pressuresProject 4:Non Productive Time Identification for Pertamina Geothermal DrillingWith a team, we identify nonproductive time identification for a drilling campaign. Using daily drilling reports, composite log reports, mud logging, bit records, drilling time charts and the general data, we generate an evaluation.Project 5:Underbalance Drilling Screening Assessment at “X” geothermal field.I apply a method to determine whether the underbalance drilling is feasible or not. It is based on wellbore stability, loss circulation, reservoir damage, stuck-pipe incident, hard drilling and cost benefit calculation. Project 6:Bottom Hole Press. & Hole Cleaning calculation at a drilling campaign.I calculate the bottom hole pressure as a function of drilling mud properties and the pressure loss that occur along with it. Also calculating the minimum velocity to clean a hole based on aerated underbalance drilling campaign. Show less

    • PT. Mastic Utama Sarana

      Jan 2014 - Oct 2014
      Project Engineer

      The task is to make a lean and effective unit business for a product. The problem starts from the production quality control, logistic material handling and application processes. I have the responsibility to prepare and applicate high quality work at every projects. I do scheduling personnel, equipment and material schedule, site surveys, set up equipment according to plan. Working outdoors all day long has to be the obligation on controlling projects.

    • Brothers Energy Indonesia

      Jan 2015 - Jul 2016
      Air Drilling Engineer

      Ulubelu Geothermal Drilling Campaign.I plan and supervise the air drilling services. It includes fluid selection, fluid modelling, drilling program, creating AFE drilling cost reports, drilling reports to manager and supervisions. I manage the logistic for drilling spareparts to be ready on time by a minimum stock requirement system. At the end I apply the best available technology suitable to a well.

    • Jabar Energy

      Aug 2016 - Feb 2017
      Jr. Drilling Engineer

      Cisolok-Cisukarame Drilling Campaign (Jabar Rekind Geothermal).Planning goods and services for an IPM drilling campaign. Analyzing the drilling prognosis, wellcat and the MT data. Preparing the scope of work within the drilling contract and preparing the technical support for the material usage within the needs of drilling contracts.

    • KS Orka Renewables

      Feb 2017 - Dec 2018
      Drilling Engineer

      Sokoria, Flores - exploration well project.Analyzing geothermal wellcats from geological prognosis, Identifying drilling hazards, basic of well design, casing design and drilling programs. Preparing drilling contracts and planning an exploration well. Achieving a safe and delivering a good operation for geothermal wells.

    • PERTAMINA EP

      Jan 2018 - Jan 2019
      Drilling supervisor (DSV)

      Workover and Drilling Campaign (Java, Kalimantan and Sumatra)Supervising and executing Workover program on 350 HP,450 HP, 550 HP, 650 HP, 1000 HP and 1500 Hp rigs. Executing and coordinating service company at field. Preparing wellpad needs. Constructing end of well reports and cost controls.

    • Geodipa Energi

      Jan 2020 - Jan 2021
      Asisten Drilling Manager

      Government Drilling Campaign (Flores)Preparing drilling program and drilling contracts. Coordinating with drilling services to achieve an efficient and effective operation. Handling operation on a bundled drilling service contract for a 750 HP rig. Preparing the technical support for the material usage and end of well reports and cost controls.

    • PT Chevron Pacific Indonesia

      Jan 2021 - now
      Drilling / Workover Site Manager

      Blok Rokan Workover and Drilling Campaign.Managing drilling/workover/well service operation to execute the approved well program in a safe and efficient manner. Identify potential deviation and ensure all required processes are followed prior to operation. Working to ensure the safety of all personnel on location and compliance with all applicable regulations. Provide daily reports and cost controls.

  • Licenses & Certifications

    • H2S

      OPITO
      Aug 2024
    • BOSIET

      OPITO
      Aug 2024
    • IADC WellCAP ® Drilling Well Control Supervisory Lvl.

      International Association of Drilling Contractors
      Feb 2018
    • Driller for Land Rig (Ahli Pengendali Bor III)

      PPSDM Migas
      Jan 2021
    • Travel safe by boat

      OPITO
      Jan 2024
    • IADC WellSharp ® Drilling Operation Supervisory Lvl.

      IADC Southeast Asia Chapter
      Jan 2023