Ra'ed Da'na

Ra'ed Da'na

Mechanical Engineer Trainee

Followers of Ra'ed Da'na2000 followers
location of Ra'ed Da'naRiyadh, Saudi Arabia

Connect with Ra'ed Da'na to Send Message

Connect

Connect with Ra'ed Da'na to Send Message

Connect
  • Timeline

  • About me

    Assistant Chief Engineer ( pre opening ) at Jumeirah Gulf of Bahrain Resort.

  • Education

    • Al Hassad Al Tarbawi School

      -
      Secondary High School Scientific Stream 83
    • German Jordanian University

      2012 - 2018
      Bachelor of Science - BS Mechanical Engineering & Maintenance Management

      - Dynamics & Vibration.- Power & Refrigeration Cycles.- Instrumentation & Measurement.- Spare Parts & Storage Management.- Internal Combustion Engines.- Human Resource Management.- Cost Management.- Reliability & Quality Control.- Thermodynamics.

    • Hochschule Magdeburg-Stendal (FH)

      2015 - 2017
      International Graduation Project & Trainee Student Mechanical Engineering & Maintenance Management 1

      Graduation Thesis Subject: “Calibration Trolley for Oil Carry Over measurement devices of Compressor Test Rig” indemnified by WABCO Research Department.

    • University of Jordan

      2010 - 2011
      Bachelor of Business Administration - BBA Marketing/Marketing Management, General

      - Accounting. - Consumer Behavior.- Principles of Management. - Micro & Macro Economics.

  • Experience

    • Na'el for Cooling

      Jul 2015 - Sept 2015
      Mechanical Engineer Trainee

      * Calculation and installation of cooling systems for cold stores* Existing projects Maintenance programs* HVAC load calculation

    • WABCO

      Sept 2016 - Aug 2017

      • Organized data archive of engineering specifications, drawings, and specifications and maintained traceability of documents by proper filing and indexing.• Developed technical skills through training and shadowing experienced professionals.• Interfaced with the project management team to prepare engineering submittals and work plans.• Created concept-level design of Air cycle, analyzing Pneumatic or hydraulic models and computations for air consumption master planning and air quality studies.• In charge of mechanical and design drafting, investigation, and resolution of reported defects and malfunctions at the WABCO's Claims Investigation Center. Show less

      • Graduate Student

        Mar 2017 - Aug 2017
      • Mechanical Engineer Trainee

        Sept 2016 - Mar 2017
    • Awar Trading Company

      Apr 2018 - Nov 2021

      • Planned scheduled maintenance outages as part of a preventive maintenance program.• Supervised employee performance, preventive maintenance and safety.• Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.• Monitored safety compliance to maintain strict standards and protect team members from harm.• Reduced company expenditures and loss by implementing proactive maintenance procedures.• Handled operational matters and efficiency by directing workforce members towards objectives.• Optimized performance of facility machinery through calibration and repairs.• Actively lead and developed the maintenance team to ensure effective communication across & between shifts and with the production teams (O&M) to maximize productivity and minimize cost.• Implemented CMMS to reduce MTTR, increase MTBF and equipment reliability.• Established procedures for corrective and preventive maintenance.• Conducted routine and ongoing assessments of system operations by performing tests, rounds and analyzing data. Show less • Analyzed and evaluated performance and optimized efficiency.• Engaged in first-level support for customers requiring routine support and troubleshooting.• Inspected sites regularly to identify problems and necessary maintenance.• Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.• Developed process improvements to increase reliability and equipment performance.• Maintained all inventory and equipment, and ensure proper storage.• Reviewed technical documentation to complete equipment maintenance and repair. Show less

      • Maintenance Team Lead

        Oct 2018 - Nov 2021
      • Service Engineer

        Apr 2018 - Oct 2018
    • Kyoto Interior Design W.L.L

      Jan 2022 - Oct 2022
      Facilities Manager

      • Ensure that the facility is fully operational with all utilities functioning properly together with the relevant KPIs.• Overseeing, agreeing contracts, and ensure maintenance and operation of providers for services, includes; civil, mechanical, electrical, and W&S contractors.• Establishes MEP preventative maintenance schedules and supervise maintenance repair work and assist with checking systems and servicing building equipment like;HVAC systems, chilled water system, air condition units, air handling unit, Exhaust system, generators, firefighting system, BMS, Pumps, water treatment system, boilers, LPG, hydraulic & pneumatic systems, kitchen & laundry equipment.• Continually improve and update the Maintenance databases for the maintenance tasking & frequencies for all MEP equipment.• Train & supervise multi-disciplinary teams of staff including mechanical, electrical, plumbing, maintenance, and security.• Strict within a 6S safe work environment and proper use of Personal Protective Equipment & Lockout/Tagout procedures.• Manage budgets and ensuring cost-effectiveness• Manage spare parts stocks, materials and equipment.• Ensure that facilities meet government regulations, environmental, health, and security standards. Show less

    • Jumeirah Hotels & Resorts

      Jun 2022 - now

      • Maintain hotel standard of quality and service in all departments.• Supervises and directs the daily activities of all engineering supervisors, departments, & subcontractors • Assists in the implementation, co-ordination, and monitoring of Fire, Life and Safety Systems• Assisting the management in budget and replacement on yearly basis • Control utility consumption to maximize energy efficiency.• Apply sustainability and buildup green culture.• achieve Engineering Key Performance Indicators (KPIs), executing action plans relating to department KPIs, Show less

      • Assistant Chief Engineer ( pre-opening )

        Sept 2023 - now
      • Plant Manager

        Jun 2022 - Aug 2023
  • Licenses & Certifications

    • Steam Basics

      Armstrong State University
      Jul 2021
    • Digital Multimeter Basics

      Fluke Corporation
      Aug 2021
    • Testing Steam Traps

      Armstrong State University
      Sept 2021
    • Car Park Ventilation & Firefighting System

      نقابة المهندسين الأردنيين Jordan Engineers Association
      Apr 2021
    • Insulation Resistance test

      Fluke Corporation
      Mar 2021
    • Artificial intelligence (AI) for Maintenance

      نقابة المهندسين الأردنيين Jordan Engineers Association
      Mar 2021
    • Liquefied Petroleum Gas (LPG) - Introduction

      نقابة المهندسين الأردنيين Jordan Engineers Association
      Apr 2021
    • Introduction to SAFETY

      نقابة المهندسين الأردنيين Jordan Engineers Association
      Oct 2018
    • Pumps: Selection, Operation, Maintenance & troubleshooting

      نقابة المهندسين الأردنيين Jordan Engineers Association
      Sept 2018
    • Design & Requirements of Fire Fighting Systems

      نقابة المهندسين الأردنيين Jordan Engineers Association
      Jan 2019
  • Volunteer Experience

    • Trainee

      Issued by INJAZ
      INJAZAssociated with Ra'ed Da'na
    • Membership Committee

      Issued by SMRP on Apr 2021
      SMRPAssociated with Ra'ed Da'na
    • Membership

      Issued by نقابة المهندسين الأردنيين Jordan Engineers Association on Feb 2018
      نقابة المهندسين الأردنيين Jordan Engineers AssociationAssociated with Ra'ed Da'na