Alaa Saied

Alaa Saied

Electrical Power Engineer

Followers of Alaa Saied1000 followers
location of Alaa SaiedSaudi Arabia

Connect with Alaa Saied to Send Message

Connect

Connect with Alaa Saied to Send Message

Connect
  • Timeline

  • About me

    Electrical Technical Office Team Leader at Kortech, Saudi Arabia Medical Wellness Resort, Triple Bay, Amaala (Red Sea Global)

  • Education

    • Cairo University

      2006 - 2011
      Bachelor's degree Electrical Power and Machines.
  • Experience

    • El Tawheed for Wiring

      Sept 2013 - Mar 2015
      Electrical Power Engineer

      Maintenance Electrical Power Engineer

    • Applications

      Mar 2015 - Oct 2016
      Electrical Engineer (Electrical Works, Low Current and Home Automation)

      1- Main Building of PHC at Salah Salem St.(Cairo Housing and Development Main Contractor)2- Private Villa on the 6th of October.3- Private Villa at Kattamya Heights.(Cairo Housing and Development Main Contractor)4- Central Building at Future city (Orascom Main Contractor)5- Cinema Room in Private Villa at Kattamya Heights.6- 90 Point Mall. (Cairo Housing and Development Main Contractor)7- Private Villa at Lake View.8- Palace of the king of Bahrain at Hyatt Regency Sharm El Sheikh Resort. Show less

    • MEP-Egypt

      Oct 2016 - May 2018

      (5th , 6th , 7th , 8th and 12th (Roof) floors) ( Fast Track Project)Owner: Union National Bank.Main Consultant: APG Architecture & Planning Group.Main Contractor: Misr Contraco Construction. Owner: Industrial Development and Workers Egyptian Bank.Main Consultant: Dr. Amr ElGohary Architects.Electromechanical Consultant: Saleh & Hegab Integrated Engineering.Main Contractor: Watanya For Projects. Owner: CIBMain Consultant: Vision Architects.Electromechanical Consultant: EDC (Elec. Mech. Design Center)Main Contractor: PALM Construct.

      • Senior Site& Technical Office Engineer for Electrical works and Low Current systems

        Aug 2017 - May 2018
      • Senior Site& Technical Office Engineer for Electrical works and Low Current systems

        Jul 2017 - Aug 2017
      • Senior Site& Technical Office Engineer for Electrical works and Low Current systems

        Oct 2016 - Jul 2017
    • MEP-Egypt

      Jul 2018 - Dec 2018
      Senior Site& Technical Office Engineer for Electrical works and Low Current systems

      Follow Up Working Shop Drawing for (Lighting, Power, HVAC Power, Data, Telephone, Sound, CCTV, Fire alarm, Access Control, Audio Visual, MATV, Addressing, and BMS) with the Junior Engineers and Draft Mans.Submittals of Material.Transmittal of WSD.(RFI, MIR, IR) Requests.Assigning the workers and the equipment required for the projectduring the project cycle.Assigning the procurement of working materials and consumablesduring project cycleFollow up the site works with Junior Site Engineers.Direct supervision of the Foremen and the technicians to make sure thatthe execution is done according to the contract and the standard technical specifications.Distributing the drawing, making sketches for the Foremen, and followingthem for any updating in the working drawing.Preparing Quantities Survey.Preparing Performa Invoice.AS Built.Doing detailed reports. Show less

    • MADKOUR

      Jan 2019 - Dec 2021

      Follow Up Working Shop Drawing for (Lighting, Power, HVAC Power,Data, Telephone, Sound, CCTV, Fire alarm, Access Control, Audio Visual,MATV, data center and BMS) with the Junior Engineers and Draft Mans.Submittals of Material.Transmittal of WSD.(RFI, MIR, IR) Requests.Assigning the workers and the equipment required for the projectduring project cycle.Assigning the procurement of working materials and consumablesduring project cycleFollow up the site works with construction Site Engineers.Preparing Quantities Survey.Preparing Performa Invoice.AS Built.Doing detailed reportsSubmit VO break Down Show less Follow Up Working Shop Drawing for (Lighting, Power, HVAC Power,Data, Telephone, Sound, CCTV, Fire alarm, Access Control, Audio Visual,MATV, data center and BMS) with the Junior Engineers and Draft Mans.Submittals of Material.Transmittal of WSD.RFI, MIR, IR) Requests.Assigning the workers and the equipment required for the projectduring the project cycle.Assigning the procurement of working materials and consumablesduring project cycleFollow up the site works with construction Site Engineers.Preparing Quantities Survey.Preparing Performa Invoice.AS Built.Doing detailed reportsSubmit VO break Down Show less

      • Team Leader Technical Office Engineer for Electrical works and Low Current systems

        Aug 2021 - Dec 2021
      • Team Leader Technical Office Engineer for Electrical works and Low Current systems

        Jan 2019 - Aug 2021
    • Kortech

      Dec 2021 - now
      • Electrical Technical office Team Leader at Kortech (A Hassan Allam Company) Saudi Arabia.

        Apr 2024 - now
      • Electrical Technical Office Team Leader at Kortech ( A Hassan Allam Company )

        May 2023 - Apr 2024
      • Senior technical office Engineer

        Dec 2021 - Apr 2023
  • Licenses & Certifications