Luca Lollobrigida

Luca Lollobrigida

Technical Staff Member

Followers of Luca Lollobrigida1000 followers
location of Luca LollobrigidaOhrid, Southwestern, North Macedonia

Connect with Luca Lollobrigida to Send Message

Connect

Connect with Luca Lollobrigida to Send Message

Connect
  • Timeline

  • About me

    Team Leader / Resident Engineer

  • Education

    • Engineering University of Rome "La Sapienza"

      -
      Degree in Engineering Engineering
    • State Technical University of Vladimir (Russia)

      -
      Ad Honorem - University Degree in Engineering Engineering
  • Experience

    • Inter Pagano Centre S.r.l. - Ariccia (Italy)

      Jan 1991 - Jan 1993
      Technical Staff Member

      Detailed Design and complete supervision of the construction of a 15,000 sq. m. industrial complex used for the production of forest products ranging from windows and doors to structural grade lumber and laminated beams, – Economic Feasibility Studies, Detailed Co-ordination of the Engineering Design and Construction Contract Documentation and Technical Co-ordination during all the phases of the construction of this "key-hand" completely new industrial complex.

    • Inter Service Centre S.r.l. - Ariccia (Italy)

      Jan 1993 - Jan 1995
      Project/Construction Manager

      Defects liability and instruction period relative to the utilization of the new 15,000 sq. m. industrial complex for the production of forest products ranging from furniture, windows and doors to structural grade lumber and laminated beams. The direct responsibilities included all of the Defects Liability duties and reporting to the financing agencies as well as the instruction of the Russian Technicians who were chosen to manage the industrial complex. An addition responsibility as the “On-Site” consultant was the certification of the laminated structural beams produced in the plant for the Otto Graf Institute of Stuttgart, Germany. Show less

    • Inter-Transports Centre S.p.A. - Prato (Italy)

      Jan 1995 - Jan 1996
      Senior Executive

      European Union TACIS Programme in co-operation with the Forest Ministry of the Russian Government – for the reorganisation of the transportation of forest products for five principle regions of Russia, – Economic Feasibility Studies, Detailed Co-ordination of the Engineering Design and Construction Contract Documentation and Technical Co-ordination during the construction of this completely new network of roadways. The services performed included in addition to the “On Site” project management duties, the instruction of seventy Russian Technicians (Forest Directors and Managers) for a period of two months in Russia and one week in Italy. Show less

    • TALOCA Srl - Rome (Italy)

      Jan 1996 - Jan 1998
      Project/Construction Manager

      Residential, Commercial and Office Constructions – for the TALOCA S.r.l. in Moscow – Russia and Baku – Azerbaijan – Economic Feasibility Studies, Detailed Co-ordination of the Architectural and Engineering Design and Construction Contract Documentation and Technical Co-ordination during the constructions. The services performed included in addition to the “On Site” project management duties, the purchase and customs proceedings and formalities regarding the construction works. The responsibilities included the direct supervision of several ex-patriots and and all the local staff members.Among the others : - Construction of the residence of Farko Group Director in Moscow (500 sq.m. villa) - reconstruction of Farko Group offices in Baku - Adzerbaijan (300 sq.m.)- reconstruction of flats in Moscow Show less

    • Studio Valle Progettazioni – Rome (Italy)

      Sept 1999 - Sept 2002
      Resident Engineer

      PHARE Project AL 9402-03-01/T16 CONSULTING SERVICES FOR THE SUPERVISION OF CONSTRUCTION FOR THE NEW BORDER CROSSING FACILITIES AT TRI URAT AND FOR THE CHARCOVA-TRI URAT ACCESS ROAD. Value 3,7 million euro. Complete Service in the Administration of the Construction Contract and in the Supervision of the Works on site. Construction of 7 Km. of road, including culverts and 2 bridges. Construction of the Border Crossing post of Tri Urat (600 sq.m.) : supervision of all the civil works, electrical and mechanical installation Show less

    • Italian Embassy Tirana - Italian Consulate Valona (Albania)

      Jan 2000 - Jan 2002
      Official Reliable Technician

      Several certification of works performed by Italian companies in Albania (among the others : company Murgo "Works for installation of the technological plants for the Department of Cardiology Surgery and Intensive Therapy of the University Hospital “Mother Teresa” of Tirana; company Meridiana "Works for the completion of 1st Lot of the hospital “Nostra Signora del Buon Consiglio” of Tirana"; company COSMAR "Reconstruction of the Ferry Terminal in the Port of Durres"; company Falcione " Works for structural and architectural rehabilitation of the headquarter of Banca Italo Albanese Sh.A. of Tirana".Project for the risks’ prevention in the Italian embassy’s UTL in Tirana and in the Consulate in Valona Show less

    • Studio Valle Progettazioni - Rome (Italy)

      Aug 2000 - Sept 2000
      Technical Coordinator

      Italian Embassy – Ufficio Cooperazione e Sviluppo - Final Design of the Hospitals of Elbasan and GramshCo-ordination of all the Technical Disciplines and with the Client. Technical Assistance inside the Tender Commission for the contracts concerning the Definitive Design and the Construction Works.

    • BeB Ingg. SpA

      Dec 2002 - Mar 2006
      Project Manager

      MUNICIPAL AND ENVIRONMENTAL ACTION PROGRAMME - MEAP Struga and Ohrid Water Supply ProjectFinancing authority: KfW Bank & European Bank for Reconstruction and Development EBRDContract value (Euro): 6.036.000Improvement of the existing Water Supply System through civil and electro-mechanical works for the construction of:Reinforced Concrete Reservoirs : StrugaZagracani H.L. (New) : no. 2x2.250 = 4.500 m3 capacityZagracani L.L. (New) : no. 1x100 = 100 m3 capacityVelesta (Rehabilitation) : no. 2x300 = 600 m3 capacityReinforced Concrete Reservoirs : OhridOrman H.L. (New) : no. 1x100 = 100 m3 capacityOrman L.L. (New) : no. 1x1000 = 1000 m3 capacityStudencista H.L. (Rehabilitation) : no. 1x3.500 = 3.500 m3 capacityStudencista L.L. (New) : no. 1x1000 = 1.000 m3 capacityBej Bunar (New) : no. 1x100 = 100 m3 capacityRehabilitation of 11 existing pumping stations with capacity from 5 to 75 l/sec., head from 66 to 180 m, power from 15 to 120 KwLaying of approximately 50.000 m’ of pipelines, HDPE materials DN100 to DN600, PN 6, PN 8, PN10 and PN16Construction of Break Tank Chambers no. 11x10 = 110 m3 capacityConstruction of R.C. Air Valve manholes, installation of Valves and fittings Construction of R.C. Isolation Valve manholes, installation of valves and fittings. Construction of R.C. Wash Out Valve manholes, installation of Valves and fittingsReinstatement of asphalt roads and pavements in overall length of approx. 20.000 m’Final Design and AS-built drawings Supply and installation of valves, fittingsWork Contract based on the FIDIC Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer, First edition, 1999 (Red Book) Show less

    • BeB Ingg. S.p.A

      Sept 2005 - Dec 2007

      MUNICIPAL AND ENVIRONMENTAL ACTION PROGRAMME - MEAP I.20Distribution Network Rehabilitation - (Lots 1a, 2a, 3, 4)Financing authority: European Bank for Reconstruction and Development (EBRD)Contract value (Euro): 3.600.000Lot 1a – Stip: execution and completion of the laying of approx 8.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 280 mm and execution of approx 500 service house-connections. Lot 2a – Veles: execution and completion of the laying of approx 4.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 280 mm and execution of approx 300 service house-connections.Lot 3 – Strumica: execution and completion of the laying of approx 24.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 355 mm and execution of approx 600 service house-connectionsLot 4 – Kumanovo: execution and completion of the laying of approx 28.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 355 mm and execution of approx 1.100 service house-connections.Construction of a main and secondary water supply pipelines in overall length of approximately 64.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 355 mm, MDPE 80 water mains diameter from DN 32 to DN 63 mm and execution of approximately 2.500 new service house-connections.Construction of R.C. Air Valve manholes, installation of Valves and fittings Construction of R.C. Isolation Valve manholes, installation of valves and fittings. Construction of R.C. Wash Out Valve manholes, installation of Valves and fittingsReinstatement of asphalt roads and pavements in overall length of aprox. 47.000 m’Final Design and AS-built drawings Supply and installation of valves, fittings Show less Construction of Water Supply System in Srbinovo, Municipality of Gostivar – Program CARDS 2004Financing authority: European Agency for Reconstruction (EAR) - Contract value (Euro): 126.000Construction of a main water supply pipeline in overall length of 1.862 m connected to the existing water supply pipeline in Srbinovo:Construction of a water supply pipeline of HDPE 100 pipes dia 160mm, 6 bars,in length of 1.412m, Construction of water supply pipeline of HDPE 100 pipes dia 160 mm, 10 bars, in length of 450 mConstruction of 4 air valve manholes including valves, fittings, etc Construction of 1 isolation valve manhole including valves, fittings, etc Construction of 2 washout manholes including all valves, fittings, flap valves, Construction of one water reservoir with capacity of 150 m3 including all necessary valves, fittings, etcConstruction of one water Intake structure including all necessary valves, fittings, etcInstallation of Chlorinating SystemConnection to local electrical network and complete internal Electrical Installation for the ReservoirReinstatement of asphalt roads and pavements in overall length of aprox. 1.00 kmFinal Design and AS-built drawings Supply and installation of valves, fittings Show less Construction of Water Supply System in the Municipality of Bitola - CARDS 2003Financing authority: European Agency for Reconstruction (EAR) - Contract value (Euro): 237.000Construction of main water supply pipeline in overall length of 2.880 m tapped to the existing water supply pipeline in the city of Bitola: Construction of a water supply pipeline of HDPE 100 pipes dia 225mm, 12.5 bars,in length of 1720m, Construction of water supply pipeline of HDPE 100 pipes dia 225 mm, 10 bars, in length of 1.160 mConstruction of 8 air valve manholes including valves, fittings Construction of 1 isolation valve manholes including valves, fittings Construction of 8 washout manholes including all valves, fittings, flap valve, soak away pits Construction of 46 m3 concrete horizontal and vertical anchor blocksConstruction. of pipeline protective r.c. sills for stream crossings in overall length of 61.45 mConstruction of one water reservoir with capacity of 135 m3 including all necessary valves, fittings etc.Construction of protective wire-mesh fence with entrance gate in overall length of 80 mReinstatement of asphalt roads and pavements in overall length of approx. 1.800 m’Final Design and AS-built drawings Supply and installation of valves, fittings Show less Construction of Sewerage Scheme in Municipality of Delcevo - CARDS 2002Financing authority: European Agency for Reconstruction (EAR) - Contract value (Euro): 307.000Construction of a sewerage scheme in overall length of 4.358 m Construction of a sewerage scheme of HDPE pipes dia 200 mm in length of 2.082 m, dia 250 mm in length of 2.035 m and dia 315 mm in length of 241 m. Construction of a 105 precast reinforces concrete manholes with 1.0 m dia and different highConstruction of a Waste Water Treatment Plant for 800 equivalent inhabitants with a total daily inlet of 160 m3 /day, including all related structureConstruction of a wire mesh fence around the WWTP with overall length of 140 mConstruction of new 10/0,4 kV tower substation equipped with 50 kVA transformer and 10 kV connection. Reinstatement of asphalt roads and pavements in overall length of approx. 900 m’Final Design and AS-built drawings Supply and installation of valves, fittings Show less

      • Project Manager

        Feb 2006 - Dec 2007
      • Project Manager

        Jun 2006 - Mar 2007
      • Project Manager

        Mar 2006 - Aug 2006
      • Project Manager

        Sept 2005 - Aug 2006
    • BeB Ingg S.p.A

      Dec 2005 - Dec 2007
      Project Manager

      MUNICIPAL AND ENVIRONMENTAL ACTION PROGRAMME - MEAP I.20 Distribution Network Rehabilitation - LOT 5 StrumicaFinancing authority: European Bank for Reconstruction and Development (EBRD)Contract value (Euro): 852.000Construction of a main and secondary water supply pipelines in overall length of approximately 25.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 140 mm, MDPE 80 water mains diameter from DN 32 to DN 63 mm and execution of approximately 500 new service house-connections. Pipe laying of 4.600 m’ HDPE 100 pipes DN 90, PN 10 bar Pipe laying of 3.300 m’ HDPE 100 pipes DN 110, PN 10 barPipe laying of 500 m’ HDPE 100 pipes DN 140, PN 10 barPipe laying of 6.900 m’ MDPE 80 pipes DN 32, PN 10 barPipe laying of 10.100 m’ MDPE 80 pipes DN 63, PN 10 barConstruction of R.C. Air Valve manholes, installation of Valves and fittings Construction of R.C. Isolation Valve manholes, installation of valves and fittings. Construction of R.C. Wash Out Valve manholes, installation of Valves and fittingsReinstatement of asphalt roads and pavements in overall length of approx. 10.000 m’Final Design and AS-built drawings Supply and installation of valves, fittingsWork Contract based on the FIDIC 1999 (Red Book) Show less

    • BeB Ingg. S.p.A.

      Jun 2006 - Dec 2007
      Project Manager

      Sewerage Project in the City of Korça (Albania) - Sewage Construction / Construction of Stormwater Tanks - Financed by KfW - value 3,2 million euro. Construction of : 90 concrete shafts - 2 stormwater tanks - 1 syphon - 1 culvert (tot. 2.400 c.m. of concrete). Total of sewage pipeline (concrete and HDPE) : 5,7 km. Mechanical installations.

    • Hidrotek Istanbul (VEOLIA Group)

      Jun 2008 - Sept 2010
      Project Manager

      Balchik Water Supply and Sewerage and Sewerage Network Extension and RehabilitationFinancing authority: ISPA Measure EU Funds & Ministry of Environment and WaterContract value (Euro): 8.658.000Water Supply Component Construction of a main and secondary water supply pipelines in overall length of approx. 38.000 m’ of HDPE 100 water mains diameter from DN 90 to DN 400 mm, MDPE 80 water mains diameter from DN 32 to DN 75 mm and execution of approximately 3.000 new service house-connections. Rehabilitation of existing Reservoir - Construction of Chlorination Station - Construction of Booster StationConstruction of Air Valve & Isolation Valve manholes, installation of Valves and fittings - Reinstatement of asphalt roads and pavements in overall length of aprox. 10.000 m’ - Supply and installation of valves, fittingsSewerage Network ComponentConstruction of approximately 4.500m’ of Main Collectors, 21.000m’ of secondary system plus branches for house connections diameter DN 250, DN 400 and DN 630. Rehabilitation of the existing Sewerage Pumping StationThe Work Contract is based on the FIDIC 1999 (Red Book) Show less

    • EGIS INTERNATIONAL

      May 2010 - Nov 2012
      Senior Resident Engineer

      Technical Assistance for Municipal Infrastructure Projects.The Supervision activities were covering 14 projects of which 11 financed by European Union and 3 financed by the Ministry of Local Self Government for a total contracts' amount of 6.462.000 euro.

    • Egis

      Jul 2016 - Nov 2018

      Rehabilitation of the Centralized Irrigation System along Lower Prut River - Chircani & Zirnesti.: additional Irrigation Modules S7 and S8Chircani & Zirnesti central Irrigation System: construction of 2 irrigation module including 2 irrigation pump station with 4 pumps - Length of rehabilitated irrigation network: 18.2 km of pipes in polyethylene and steel. Activities performed :Construction supervision of the Works Contractsbased on FIDIC – Red Book Contract Conditions with Defect Notification Period included.Total amount of the Works: 2,010 million USD. Show less Consulting Services for Supervision of Civil Works under Irrigation and Land Market Development Project (ILMDP)Lot 1 :Zeda Ru irrigation scheme Main Canal in Kareli Municipality Lot 2 : Rehabilitation of the Electrical and Mechanical Parts of Kvemo Samgori Irrigation Scheme Right Main Canal and Headworks in Sagarejo Municipality Lot 3 : Restoration of the Instrumental Monitoring System of Algeti Water Reservoir Dam and Hydraulic Structures at Tbisi-Kumisi Irrigation Scheme, Rehabilitation of the Main Canal, Water Pipelines in Khaishi and Marabda AreasTotal value of Works' Contracts : 13,8 million USD Show less Millennium Challenge Corporation - MCA Moldova. Rehabilitation of Centralized Irrigation Systems (CIS) in Criuleni and Lopatna , Jora de Jos, Cosnita, Puhaceni & Roscani, Blindesti, Grozesti, Leova, Chircani & Zirnesti - Construction Supervision Consultant for the 6 Works Contract. Total value of the Works' Contracts : 80 million USD.Management of the Consultant’s team as Team Leader.Works Contracts based on FIDIC – Red Book Contract Conditions.Total pipelines reconstructed : 530 Km.Total pumping stations rehabilitated : 33 pumping stations with 104 pumps. Show less Rehabilitation of the Centralized Irrigation System along Lower Prut River - Chircani & Zirnesti.: additional Irrigation Module S6Rehabilitated systems: 1 irrigation module including 1 irrigation pump station with 2 pumps Length of rehabilitated irrigation network: 9.48 km of pipes in polyethylene and steel. Construction supervision of the Works Contracts within Millennium Challenge Corporation USA – Millennium Challenge Account Moldova. The Works Contracts are based on FIDIC – Red Book Contract Conditions.Total amount of the Works: 1,032 million USD. Show less

      • Team Leader

        May 2017 - Nov 2018
      • Construction Management Engineer

        Mar 2016 - Dec 2017
      • Team Leader

        Nov 2013 - Nov 2017
      • Team Leader

        Jul 2016 - Dec 2016
    • Eptisa

      May 2018 - Mar 2019
      Team Leader

      Small-scale, low cost, environment friendly irrigation schemes : sites selection and preparation of full tender dossier - EuropeAid/137393/DH/SER/MKEPTISA South East Europe for EU Delegation in Republic of MacedoniaSelection of potential sites for investment in small scale, low cost, enviroment friendly irrigation scheme. Preparation of projects documents including feasibility studies and technical design. Design and tendering documentation for the construction/rehabilitation of the irrigation systems at the 8 selected sites. Policy guidance on streamlining, strengthening and clarifying the roles and build capacities of different stakeholders involved in irrigation water management in community-based, small scale irrigation systems. Development of a procedure and methodology for calculation of water tariff.Full responsibility for co-ordination and overview of the project tasks and activities.Works Contracts based on PRAG Contract Conditions. Show less

    • CDM Smith

      Jun 2018 - Jan 2019
      Irrigation System Expert

      Consulting Services for Implementation of Wastewater Management Nablus East – EU and KfW financedCDM Smith Europe for Nablus Municipality Supervision of the implementation of the “reuse” project outside the Nablus West Wastewater Treatment Plant. Purpose of the outside reuse scheme is to handle treated wastewater for irrigation in agriculture in the Nablus region. Pretreatment facilities with inlet pumps, disk filter, UV unit, buffer tanks and irrigation pumps with irrigation network. Total of the project 1.200.000 euro.Overview on the Contractor’s submittals and Technical Documentation. Control on the installation activities. Testing and commissioning.The Works Contracts are based on FIDIC – Red Book Contract Conditions. Show less

    • SWS Consulting Engineering S.r.l

      Jul 2018 - Nov 2018
      Team Leader

      Construction of the Main Sewerage Collector in Mogilev Town – World Bank financedSWS Consulting Engineering for Mogilev Municipality Technical Assistance to the Mogilevoblvodokanal of Municipality of Mogilev in the Supervision of the Works’ Contract for improving performance reliability and carrying capacity of the main public sewer through laying a new line of sewerage collector (3,3 Km) of increased carrying capacity in parallel with the already existing main sewerage collector. Total of the project 8,068,000 euro.Management and Supervision of FIDIC Works Contract. Training of the Client’s Personnel to work under FIDIC procedures Show less

    • GOPA Infra

      Jan 2019 - Dec 2021
      Sub-Project Team Leader

      Western Balkans Investment Facility Infrastructure Project Facility Technical Assistance 7 (IPF7) EIB/EBRD for Public Utility Company “Vodovod i Kanalizacija” Skopje Support and assistance to the Project Implementation Unit, which has been established within the Public Utility Company “Vodovod i Kanalizacija” Skopje, to manage the design, construction and operation of a Central WWTP for Skopje with a total capacity of 650,000 p.eFull Technical Assistance to PIU.

    • Stantec

      Feb 2022 - Feb 2023
      Team Leader

      Technical Assistance to the Skopje Wastewater Treatment Plant Project Implementation Unit.Client: ERI for Public Utility Company “Vodovod i Kanalizacija” Skopje Main project features: Support and assistance to the Project Implementation Unit, which has been established within the Public Utility Company “Vodovod i Kanalizacija” Skopje, to manage the design, construction and operation of a Central WWTP for Skopje with a total capacity of 650,000 p.e.

    • UTA

      Nov 2023 - now
      Project Manager

      Rehabilitation of the Water Supply and Wastewater Systems in the Cities of Kadamzhai, Tash- Komur, Kok-Jangak and Aidarken – Consultant for Project Management, Design, and Technical Supervision for 4 Cities

  • Licenses & Certifications

    • Professional licence

      Macedonian Chamber of Engineers and Architects
    • Professional licence

      Italian chamber of Engineers