    Hydraulic Engineer at AIM Consultants Ltd.

  • Education

    • Ladoke Akintola University of Technology in Ogbomosho (B. Tech) 2004-2009

      2004 - 2009
      B.Tech Civil Engineering
  • Experience

    • Noblesovrano Ltd

      Jul 2011 - Jan 2020
      Senior Infrastructure design engineer

      Having cumulative experience of over 7 years in design, implementation and maintenance of road,hydraulic and building structures coupled with vast knowledge and experience with the use of engineering softwares likeOrion - design of building structures and foundation. Hec-Ras - design of hydraulic structures subjected to either steady or unsteady flow. Arc Map – Hydrological analysis and Mapping. Storm net - modeling and design of storm water and sanitary sewers. AutoCAD Civil 3D- design and detailing of road and hydraulic structures. Show less

    • AIM Consultants Ltd.

      Jan 2020 - now

      Name of Project: Construction of Rafin Duma earth dam with gully bed and bank stabilization projectClient: Sokoto NEWMAP/World bankMain Project features: Design and construction supervision of proposed dam-Earth Dam and its appurtenances(outlet structures, stepped chute spillway , etc.) detailed design including hydrologic, hydraulic analyses using digitized topographical maps and other GIS data using SWMM, HECRAS and Arcmap for the aforementioned analyses.- Conducting Stress and slope stability analysis and seepage analysis of 14m dam height. Show less Recommend hydrology study at outlet control points, topographic survey and geotechnical investigations planning for Sokoto NEWMAP gully sites(World bank -assisted projects);Appropriate bio engineering measures designed with the help of CIVIL3D,HEC-RAS hydraulic modelling, SSA and SWMM hydrologic analysis.-The system comprises of box and pipe culverts, chutes, drops, stilling basins, and gully bank slope stability analysis using GEOSTUDIO.-Bank stability checking and modification of gully bed using geotextile and and vegetation.- Review of Technical options and cost comparison report (TOCCR)- Detail design reports for 2 gully sites have been submitted(Approved by the World bank). Show less Recommend hydrology study at outlet control points, topographic survey and geotechnical investigations planning for Plateau NEWMAP gullies and Langtang Dam Site(World bank -assisted projects);Appropriate bio engineering measures designed with the help of CIVIL3D,HEC-RAS hydraulic modelling and Dam Break Analysis, SSA and SWMM hydrologic analysis.-The system comprises of box and pipe culverts, chutes, drops, stilling basins, and gully bank slope stability analysis using GEOSTUDIO.-Bank stability checking and modification of gully bed using geotextile and and vegetation.- Detail design reports for 2 gully sites(Yakubu Gown and Bingham ) have been submitted (Technical approval granted by the World bank). Dam Siltation and Erosion control report of Langtang Dam site has been submitted(Approved by the World bank) Show less

      • Hydraulic Engineer

        Mar 2021 - now
      • Hydraulic Engineer

        Jan 2021 - now
      • Hydraulic Engineer

        Jan 2020 - Feb 2021
  • Licenses & Certifications

    • Corporate member(MNSE)

      The Nigerian Society of Engineers
    • Registered Engineer