Piseth Som

Piseth Som

English Language Instructor

Followers of Piseth Som847 followers
location of Piseth SomPhnom Penh, Cambodia

Connect with Piseth Som to Send Message

Connect

Connect with Piseth Som to Send Message

Connect
  • Timeline

  • About me

    Chief Executive Officer (CEO) at Sustinat Green Co., Ltd - EIA Consulting Firm in Cambodia

  • Education

    • Burapha University (BUU)

      2012 - 2014
      Master's degree Environmental and Chemical Engineering Excellent

      Piseth received a scholarship from Royal Thai Scholarship by Princess Maha Chakri Sirindhorn in a master degree of Chemical and Environmental Engineering from Burapha University, Thailand. As part of Master Program fulfillment, He have conducted a research on industrial wastewater treatment which was the laboratory experimental research. Piseth also received best paper award during the international conference as the requirement for graduation. He had worked for Wastewater Treatment Laboratory… Show more Piseth received a scholarship from Royal Thai Scholarship by Princess Maha Chakri Sirindhorn in a master degree of Chemical and Environmental Engineering from Burapha University, Thailand. As part of Master Program fulfillment, He have conducted a research on industrial wastewater treatment which was the laboratory experimental research. Piseth also received best paper award during the international conference as the requirement for graduation. He had worked for Wastewater Treatment Laboratory Center, Burapha University, for a year. During his work, he was the leader of the undergraduate research group in wastewater treatment. He implemented in specific task of scientific reviewing, team guiding and instructing, technical monitoring and reporting for Lab based operation.Thesis: The application of Fenton-like and Fenton reactions with subsequent hydroxide precipitation for industrial derusting wastewater treatment. Show less

    • Royal University of Phnom Penh (RUPP)

      2008 - 2011
      Bachelor's degree Environmental Science Good

      Bachelor Thesis in fulfillment of Environmental Science on the topic “The Evaluation of Climate Change Adaptation Option on Rice Production in Local Community”An internship on Disaster Risk Assessment in Local Community at National Committee for Disaster Management (NCDM)

    • Build Bright University (BBU)

      2008 - 2012
      Bachelor's degree ENGLISH LANGUAGE AND LITERATURE/LETTERS Good

      Teaching Practicum at Kong Ren International Centre for a Partial Fulfillment of the Requirements for Bachelor Degree of Arts (B.A) in Teaching English as Foreign Language (FEFL) at Build Bright University

  • Experience

    • Education Development Organization (EDO)

      Jun 2011 - Jan 2012
      English Language Instructor

      the main tasks include the development of the instructional plan and conducting the teaching process and pre teaching, during teaching and post teaching evaluation.

    • Documentation Center of Cambodia (DC-Cam),

      Dec 2011 - Apr 2012
      Field Team Leader and Coordinator

       Preparing work plan for team  Conducting and coordinating the key informant interview  Following up with team for the quality of the result Reporting the working result to the up-line manager Transcription of the interviewed result  Analysis and Reporting

    • มหาวิทยาลัยบูรพา, Burapha University

      Jan 2013 - Mar 2014
      Ex-situ Laboratory Assistant

      Research Center for Waste Water Experiment and Laboratory, Faculty of Engineering, Burapha University Managing and guiding the 4th year student for term project  Assisting in technical training, practical Lab processing  Coordinate the result with Supervisor Reporting and Data Interpretation  Research

    • Betagro Group

      Jun 2014 - Aug 2015
      Quality Control Engineer

       Translating document for working procedure and raw material specification  Supervising the team to endure the quality controlling of raw material  Conducting Laboratory Testing of Raw Material Specification  Preparing document for daily work  Reporting the working result to the up-line manager

    • Sustinat Green Co., Ltd - EIA Consulting Firm in Cambodia

      Jan 2015 - now

      Job Responsibilities • Oversee and manage operating departmental budgets and costs according to annual allocations to ensure efficient usage of resources• Develop proposals for internal or client if needed• Lead the development and execution of technical strategies and activities to get success client business• Manage and monitor operation budgeting process, and ensure all operation activities are within budget• Conduct performance review meetings with clients on the implementation/progress of technical strategies and plans• Manage and monitor return on investment for technical initiatives in company goal, evaluating effectiveness and creating next steps and action plans• Cooperate with clients and other external third parties for marketing activities• Strengthen and/or maintain close relationships with key clients and ministry officer Show less Assist Superior and Manage work to achieve technical work which follow the timeline for assigned business and overall business objectives. Specifically, the work performances include: • Assist superior drafting term of reference (TOR) that include introduction, project description, method, reference and appendix• Site Visit and collect the information on Project description in TOR• Prepare slide public consultation meeting, TOR & EIA and sent to superior for review and feedback before presentation • Revise TOR report and EIA report follow comment point from MOE• Assist to do environmental management plan (EMP) and environmental monitoring report (EMR)• Conduct sample need and labeling the sample and process sample to MOE Lab • Assist Superior to drafting public consultation supporting doc (Executive summary, Agenda, list of participants) • Update and make consistency of content all chapter of the actual study that already conducted• Keep update and informing the local authority for meeting arrangement and schedule during the MOE inspection Show less In the role of Assistant to CTO, Piseth fulfilled the following task: • Set up the schedule with supported team for preliminary screening of the project and scoping TOR• Supervise supporting team to do TOR drafting • Presentation at MOE as project leader• check and control the quality of Survey report from outsource team and supp • Supervise supporting team for water, Soil and other sampling• Lead filed survey, train questioners, orientation before the actual filed to supporting team• set up and mobilize the team for Field summary and reflection after the field survey• Review public consultation supporting document such as Executive summary, Agenda, list of participants • briefing important project impact, important EMP and guidance to supporting team for drafting the chapter report• Compile conclusion about project impact interaction and important mitigation and EMP as well as technical recommendation for environmental management and improvement• assure the accuracy consistency and formatting of the report are correct and zero error before summiting to the client and MOE Show less

      • Chief Executive Officer (CEO)

        Jan 2021 - now
      • Chief Technical Officer (CTO)

        Jan 2019 - Dec 2020
      • Vice-Chief Technical Officer (VCTO)

        Jan 2017 - Jan 2019
      • Assistant to CTO

        Jan 2015 - Jan 2017
    • Phnom Penh Water Supply Authority

      Nov 2016 - Nov 2020
      Environmental Consultant Water Treatment plant of Bakheang, Chamkarmon, and Chumkiri-kompot
    • Angkor Harvest Co., Ltd.

      Jan 2018 - Jan 2019
      Team leader and Environmental Consultant E&S Due Diligence and EIA Compliance

      Main project features: The project aimed to access financial support from IFC. Sustinat Green provided services in conducting E&S study, social due diligence of land encroachment in according to requirements of the IFC Performance Standard. Results of the E&S study was used to support site selection and land acquisitions, EIA MoE and IFC compliance.Activities performed: ► Developed and designed research protocol and survey tools and detailed work plan, tested survey instruments and trained enumerators for data collection. ► Supervised field survey, conducted data clean-up, analyzed data and wrote report as well as presented to responsible intermenstrual departments. Show less

    • Fauna & Flora

      Jan 2018 - Jan 2018
      Technical Assistant and Field Coordinator for Rapid Bird Survey in Kamprok Yum, Prey Veng provinnce

      Som Piseth submitted a proposal to the CBCFund (Cambodia Bird Conservation Fund (CBC), Fauna & Flora International (FFI) in May 2018 to protect a 23ha relict floodedforest in Peam Reang district, Prey Veng province. However, the CBCFund Committee foundthat the proposal lacked evidence supporting the importance of the site for bird conservationto approve the grant request. The Committee recommended that a CBCFund member or designated ornithologist conducta rapid bird survey to assess the site’s habitat and bird conservation significance/potential.The Rapid Bird Survey in Kamprok Yum survey conducted on 11 February 2018 by Fred Goes, with Som Piseth and local security officer Inn Vuthy. The habitat consists of various species of shrubs (‘Daem tros’), vines, invasive plants (Mimosa pigra) and sparse trees (Barringtonia ‘Daem Reang’ reported). Access was opened at different points and people were encountered cutting woody shrub for firewood. The survey team recorded 50 bird species within and around the site.The main recommendations stemming from the survey are: To assign/find/invite knowledgeable ornithologist/birdwatcher to conduct a similar survey monthly, to further document the use of the site by birds Include the grounds of nearby Vat Chong Krouch to the site survey, as tall trees there may serve as roosting sites for birds feeding at Prey Kompork Yum To use a drone to obtain photographic/video recordings of the heronry during its breeding season, allowing to assess it size and significance To raise awareness about the site concomitantly with gathering funds from pagodas, companies, private donors, etc. to build a walkway and viewing platform to allow birdwatching and colony observation through a spotting scope (without disturbance) To develop local birding / nature tourism as funding source of a protection team To conduct environmental awareness classes and birdwatching initiations amongst school children of Peam Reang district. Show less

    • Juru

      Jan 2018 - Jan 2018
      IEE for Solar Park Project Coordinator

      Project: Supporting Regional Project Development for Association of Southeast Asian Nations Connectivity - Technical and Commercial Advisory Services for the Development of A Utility Scale Solar PV Park in Cambodia.project features: The Asian Development Bank (ADB) is working with Cambodia’s national electric utility, Electricite du Cambodge (EDC), to develop a National Solar Park Project (“the Project”). The Project aims to demonstrate the ability of large-scale solar to improve the electricity supply and stability of the Cambodian national grid, and substitute for planned fossil-fuel and hydropower generation in the future. The expansion of solar will help diversify the power generation mix and complement the existing base of hydropower plants to meet daytime peak demand and dry season shortages, as well as increase the percentage of clean energy supply, in line with the Royal Government of Cambodia’s (RGC’s) stated greenhouse gas emissions reduction targets. Show less

    • Japan International Cooperation Agency (JICA)

      Aug 2018 - Mar 2019
      EIA Guideline Specialist

      EIA Sectoral Guidelines and Review Manualproject features: The Project is designed to assist the General Department of Environmental Protection under the MoE in developing capacity for better management of the environment. This engagement focuses more specifically on the capacity development of the Department of EIA in its EIA report review process.Activities performed: ► Review ESIA reports,► Review of EIA sector guidelines, ► Collect comments► Assist in preparation and implementation of the public consultation meeting and workshop, ► Facilitate public meetings with the taskforces. Show less

    • Royal HaskoningDHV

      Jan 2019 - Oct 2020
      Local ESIA Project Leader

      Project: Dairy Farm Processing and Supporting Facility Project,CambodiaKhmer Fresh Milk Co., Ltd. (“KFM”, the Client) engaged Royal HaskoningDHV (“RHDHV”), inassociation with Sustinat Green (SG), to conduct an Environmental and Social Impact Assessment(ESIA) for a Dairy Farm Processing and Supporting Facilities (“the Project”) located in TakeoProvince, Cambodia (“the Site”).The present ESIA will use IFC Environmental and Social Performance Standards 2012 (IFC PS) as areference to identify and mitigate impacts in line with international best practice. RHDHV supportedSustinat Green, a Cambodian-based environmental consulting firm, to commission a separateCambodian Environmental Impact Assessment (EIA) process to comply with local permittingrequirements.The proposed Project site was formerly an experimental cow breeding centre managed by the Ministryof Agriculture, Farms and Fisheries (MAFF). KFM intends to establish a ‘zero-grazing’ dairy farm,applying advanced livestock management techniques for 500 heifers. Show less

    • Ramboll Management Consulting

      Jan 2019 - Jan 2019

      Project: Harmonizing the Greater Mekong Sub-region Power Systems to Facilitate Regional Power TradeThe national environment specialists and national resettlement specialist are required to collect baseline information and carry out environmental and social impacts to identify and evaluate the potential impacts and the positive/ negative environmental and social outcomes from the proposed project. This assessment will be based on ADB Safeguard Policy Statement (SPS) requirements and applicable safeguards i.e., environmental safeguards, involuntary resettlement safeguards and indigenous people safeguards. The national specialists will opine and analyse the applicable National laws and regulations related to environmental, land acquisition and resettlement that are applicable to transmission line projects Show less Support for conduct E&S due diligence for supporting land acquisition.Activities performed: ► Collected data ► Reviewed historical land uses and operations at the sites and on neighboring land to assess the potential for historic and current soil, groundwater or surface water contamination. Reviewed review of available site environmental sensitivity, including groundwater, surface water, biodiversity/protected habitats and indigenous populations; and reviewed natural hazards in Kandal and Phnom Penh provinces (including site specific variations where applicable within the proposed locations in Cambodia), including climatic and environmental issues that may impact on the sites (i.e., temperature extremes, flood risk, and earthquake risk). Show less

      • A Subconsultant to Ramboll (Funded by ADB)

        Nov 2018 - Jan 2019
      • Technical Team Leader for E&S Survey on Beverage Can Factory

        Jan 2019 - Jan 2019
    • Japan International Cooperation Agency (JICA)

      Nov 2019 - Aug 2020
      Environment Specialist for Ta Khmau WTP expansion project
    • Infunde Development Pte Ltd

      Jan 2020 - Jan 2020
      IEE Technical Project Leader for Cold Storage Facilities

      Project: Environmental and Social Study for a modern third-party logistics (3PL) cold storage warehouse and Temperature-Controlled Logistics (TCL). Main Contracted Service: a) Perform an environmental and social study for the Project that complies with theInternational Financial Corporation (IFC) Performance Standard;b) Assist the Client to apply and obtain the Environmental Contract from the Ministry ofEnvironment;

    • Ramboll Management Consulting

      Dec 2020 - Dec 2020
      Environmental Consultant

      At the request of Ramboll Malaysia Sdn. Bhd. (The client), Sustinat Green were contracted to conduct an Environmental Site Assessment (ESA) using national environmental specialists to evaluate potential site of the proposed project of the construction of a Petroleum Station in Sangkat Toul Sangke Khan Toul Kok, Capital of Phnom Penh, Cambodia. Piseth Som was the Environmental Consultant for execution the project.

    • Phnom Penh Water Supply Authority (PPWSA)

      Jan 2021 - Apr 2022
      Environmental Consultant

      Key Project Information: Phnom Penh Water Supply Authority (PPWSA) is executing the construction of Bakheng Water Production Facilities. The Project received the loan from Agence Française de Dévelopement (AFD) and European Investment Bank (EIB) to prepare the water production facility project. Safege Consulting Engineers and Vinci Construction Grands Projects (VCGP) are the technical consulting company and construction contractors of the project, respectively.PPWSA engaged Sustinat Green Co., Ltd as a consultant to implement all Environmental material obligations regarding annual environmental and social monitoring report preparation during the construction work of this project covering the period of January- December 2021Activities performed: - Work Plan arrangement and team mobilization for collecting data on site environmental sensitivity, Site review, Vicinity Survey including groundwater, surface water, biodiversity/protected habitats and reviewed natural hazards, and environmental issues monitoring and improvement plan.- HSE Data inspection and reviewing with client - Drafting report and presentation to client for the outstanding issue Show less

    • Nihon Suido Consultants Co., Ltd.

      Mar 2021 - Nov 2021
      Environmental Consultant

      PROJECT: INITIAL ENVIRONMENTAL IMPACT ASSESSMENT (IEIA) REPORT FOR THE PROJECT FOR REHABILITATION AND EXPANSION OF PHUM PREK WATER TREATMENT SYSTEM OF PPWSA.

    • TotalEnergies

      Aug 2021 - Oct 2021
      Environmental and Social Monitoring Consultant

      Main project features: Environmental and Social Monitoring Report for the Development and Operation of 60MW Solar PV Plant Project located Anlong Run Commune, Thmor Kol District, Battambang Province under the Total Eren Group. Activities performed: - Work Plan arrangement and team mobilization for collected data on site environmental sensitivity, Site review, Vicinity Survey including groundwater, surface water, biodiversity/protected habitats and reviewed natural hazards, and environmental issues monitoring and improvement plan.- Drafting report and presentation to client for the outstanding issue and briefing Show less

    • A.P. Moller - Maersk

      Aug 2021 - Sept 2021
      ESA Consultant

      Main project features: The purpose of project is to conduct the Environmental Site Assessment (ESA) Phase I for Warehouse Expansion Project in complying with ASTM E1527-13 for Environmental Site Assessments: Phase I Environmental Process.Positions held: Project Leader Activities performed: Collected data on site environmental sensitivity, Site review, Vicinity Survey including groundwater, surface water, biodiversity/protected habitats and reviewed natural hazards and Phnom Penh provinces, including climatic and environmental issues that may impact the sites. Show less

    • Prime Road Power

      Sept 2021 - May 2022

      Main project features: E&S Safeguard Monitoring Report submission to multiple funding agency (ADB, IFC) and Local Ministry of Environment of Cambodia for the Development and Construction of 60MW Solar PV Plant Project located Kbal Tek Commune, Tek Phos District, kompong Chhnang Province under the Prime Road Alternative (Cambodia) Co., Ltd. Activities performed: - Work Plan arrangement and team mobilization for collecting data on site environmental sensitivity, Site review, Vicinity Survey including groundwater, surface water, biodiversity/protected habitats and reviewed natural hazards, and environmental issues monitoring and improvement plan.- HSE Data inspection and reviewing with client - Drafting report and presentation to client for the outstanding issue and briefing Show less

      • Groundwater Assessment and Monitoring Coordinator

        Feb 2022 - May 2022
      • E&S Safeguard Consultant

        Sept 2021 - Apr 2022
    • China CACS Engineering Corporation

      Oct 2021 - May 2022
      Environment Manager

      Project: CACS is the EPC constructor for the 60 MW PV Solar Project of Prime Road Alternative (Cambodia) Co., Ltd. As part of Construction Environmental and Social Management Plan, CACS are required the every 3 months Air, Noise and Vibration Testing and report.Main Tasks: - Preparing the technical proposal and advised the method of testing- Equipment and apparatus for field sampling support and control - Actual site sampling - Drafting the report Processing - Result interpretation and presenting. Show less

    • Association Internationale des Maires Francophones

      Dec 2021 - May 2022
      Environmental Specialist

      Project: the construction of Fecal Sludge Treatment Plant (FSTP) of Phnom Penh Capital Hall under the financial support from Association Internationale des Maires Francophones (AIMF) with capacity of 70 m3/day for each module located in Sangkat Plerng Ches Rotes, Khan Kombol, Phnom Penh City. Key Work: Project Screening and Collect Secondary Information Conduct Regulatory Review  Conduct Primary site visit  Ground Truth Study/ Primary/secondary data collection (Environmental/social/biological) as baseline data collection Local Authority Interview and Project Affected People-PAP Group Discussion Public Consultation both local and Provincial meeting  Drafting Local IESIA-MoE and ESIA-ADB report  Environmental and Social Management System (ESMS) and EMP Submit the draft E&S report and presentation  Revising of E&S Report Show less

    • DOHWA Engineering Co., Ltd. (주)도화엔지니어링

      Mar 2022 - May 2022
      Environmental Consultant

      Project: Ministry of Public Works and Transport (MPWT) has received a loan from The Export–Import Bank of Korea (The “KEXIM”) from the resources of the Economic Development Cooperation Fund (EDCF) for the “Sewer System Development in Ta Khmau Town. In line with its consulting program, DOHWA Engineering Co., Ltd and Seoyoung Engineering Co., Ltd is required to fulfill and comply both national and international environmental and social materials obligations after its approval of MoE and EDCF guideline. Main Tasks: Project Screening and Collect Secondary Information Conduct Regulatory Review  Conduct Primary site visit  Ground Truth Study/ Primary/secondary data collection (Environmental/social/biological) as baseline data collection Local Authority Interview and Project Affected People-PAP Group Discussion Public Consultation both local and Provincial meeting  Drafting Local IESIA-MoE and ESIA for EDCF Guideline  Environmental and Social Management System (ESMS) and EMP Submit the draft E&S report and presentation  Revising of E&S Report Administration support and Processing the approval from MoE Show less

    • Katahira Engineers International

      Mar 2022 - Mar 2023
      Environmental Consultant

      The study requires preparation of Environmental Assessment and Review Framework (EARF) for sub-projects. Therefore, this contract includes data collection of environmental and social information for Environmental Assessment and Review Framework (EARF) for sub-projects.Katahira & Engineers International (KEI) (hereinafter referred to as ‘the Primary Consultant’) engages Sustinat Green (hereinafter referred to as ‘the Local Consultant’) to carry out data collection for the EARF for the Rural Road Improvement Project in Kingdom of Cambodia (hereinafter referred to as ‘the Study’). The project of the improvements of rural roads is to be undertaken with Ministry of Rural Department (hereinafter referred to as ‘MRD’). Therefore, throughout the Study, the Local Consultant shall work in coordination with MRD and Japan International Cooperation Agency (hereinafter referred to as ‘JICA’) and be supervised by the Primary Consultant. Show less

    • Bureau Veritas Group

      Apr 2022 - May 2022
      Environmental Consultant

      Bureau Veritas (Cambodia) Limited engaged for the support of the Periodic Environmental Monitoring Submitted to Ministry of Environment (MoE).

    • Nidec Motor Corporation

      Apr 2022 - May 2022
      Environmental Consultant

      Support for the Periodic Environmental Monitoring Submitted to Ministry of Environment (MoE).

    • Eastern Steel Industry Corporation

      May 2022 - May 2022
      Soil Sampling Manager

      Project: Eastern Steel Industry Corporation requested for soil quality testing of the project as part of the requirement and due diligence in exiting study. The soil testing were perform according the MoE guideline. The parameters and testing methods be primarily based on the MoE Laboratory testing procedure. The composite sampling of each borehole will be applied from top soil to the 1-meter depth to beselected and applied for a sample target. The sample from each borehole will be mix properly to make a composite sample with 500 g in mass stored in the poly bag for lab analysisMain Tasks: - Preparing the technical proposal and advised the method of testing- Equipment and apparatus for field sampling support and control - Actual site sampling - Sample preparation and processing to Lab.- Result interpretation and presenting. Show less

    • PTT Group

      Sept 2022 - Sept 2022
      Environmental Specialist

      Support for the Periodic Environmental Monitoring Submitted to Ministry of Environment (MoE).

    • International Development Center of Japan

      Mar 2023 - Dec 2023
      Environmental and Social Safeguard Consultant

      The engagement for IESIA study for the project for Upgrading the Quality of Health Services of Siem Reap and Kampong Cham Provincial Hospital.

    • Desolenator

      Mar 2023 - Jun 2023
      Lead Consultant

      the project is to conduct the desktop EIA study for the solar powered desolination plant in SHV.

    • DOHWA Engineering Co., Ltd.

      Aug 2023 - Mar 2024
      Environmental Consultant

      the engagement and assignment is to conduct the environmental impact assessment following the EDCF guideline and MoE guidelines. the work are under the support of Executing Agency of PPWSA.

    • Insuco

      Aug 2023 - Oct 2023
      Environmental Specialist

      it was partially engaged by Insuco to execute the environmental study for Bakheng 3 : ESMF and RPF under the AFD project.

    • Phnom Penh Water Supply Authority

      Aug 2023 - Dec 2023
      Environmental Consultant

      The project is to execute the local EMP for MoE and the RESA and ESMP for the Bakheng 3 project under the contract of PPWSA and AFD.

    • Yooshin Engineering Co.

      Jan 2024 - Mar 2024
      Environmental Specialist

      As the local consultant, the assignment and intervention for execution of ESIA study to comply with EDCF and MoE guidelines for the Cambodia-Korea Friendship Bridge Construction Project witb the EA of MPWT.

  • Licenses & Certifications

    • Awarded scholarship program from Samdach Hun Sen for poor student

      Council of Minister of Cambodia
      Jan 2008
    • Awarded government scholarship to pursue bachelor degree of environmental science at RUPP

      Ministry of Education, Youth and Sports
      Jan 2008
    • Best Paper Award for International Conference on Global Change organized by Burapha University

      Burapha University
      Jan 2014
    • Awarded certificate of recognition as best of the best contestant with high commitment, performance, ability and skills development

      Royal University of Phnom Penh
      Jan 2009
    • Awarded Royal Thai Scholarship by Princess Maha Chakri Sirindhorn Program

      Ministry of Education, Youth and Sports
      Jan 2012
  • Volunteer Experience

    • Internship Program

      Issued by National Committees for Disaster Management of Cambodi on Jul 2013
      National Committees for Disaster Management of CambodiAssociated with Piseth Som
    • Representative Delegator of National Committees for Disaster Management (NCDM)

      Issued by Asean Humanitarian Assistance (AHA) Center-Jakarta Indonesia on Jan 2011
      Asean Humanitarian Assistance (AHA) Center-Jakarta IndonesiaAssociated with Piseth Som
    • English Language Teacher

      Issued by CAMA Student Center on Jun 2010
      CAMA Student CenterAssociated with Piseth Som