Thanusanth .P

Thanusanth .P

Executive-Operation

Followers of Thanusanth .P2000 followers
location of Thanusanth .PSingapore

Connect with Thanusanth .P to Send Message

Connect

Connect with Thanusanth .P to Send Message

Connect
  • Timeline

  • About me

    BSc(Hon) in Engineering

  • Education

    • St. john's college, Jaffna.

      1997 - 2006
      Advance level

      Activities and Societies: President of the Chess club

    • University of Peradeniya

      2007 - 2012
      BscEng (Hon) Chemical & Process Engineering

      Activities and Societies: Explorers Club

    • University of Peradeniya

      2016 - 2017
      Master of Engineering (MEng) Sustainable in built environment

      Fundamentals of Architecture and Economics for Sustainable PlanningInfrastructure Planning for Sustainable CitiesGlobal Environmental Issues and Built EnvironmentBuilding Services EngineeringGreenSL Rating System for Built EnvironmentWater and wastewater Engineering

  • Experience

    • MASholdings

      Aug 2012 - Aug 2013
      Executive-Operation

      Maintain the supply chain management.• Represent the Nike Production plant as the main contact person from Nike.• Ensuring Raw Material flow are planned in order to achieve customer requirements in terms of order-fulfillment and delivery • Implement the lean activities ensuring individual KPIs meet the required standards• Prepare Kaizen, and implement 5S, lean manufacture.

    • Tentronic Engineering serice pte ltd, Guthrie Engineering (S) pte ltd

      Aug 2013 - Apr 2015
      Engineer

      • Data Center project, EPS car parking system, Changi airport A&A works• Coordinate with specialist (PE, Surveyor, LEW, Authorities (HDB, TC, CAG, PUB, LTA etc..), Service providers, cable detector and subcontractors• Prepare & Submit the project schedule, progress claim, VO, Shop drawing and as-built drawing• Support IPVT testing and commissioning• To Prepare the organization for OHSAS 18001:2007 to meet the requirement and audit• Perform other duties as assigned

    • Faculty of Engineering, University of Peradeniya

      Jun 2015 - Oct 2016
      Instructor
    • Tentronic Engineering service pte ltd

      Dec 2016 - Apr 2018
      Project Engineer

      • Projects: Data Centre, Chilled water piping system.• Site installation work- SMARDT, TRANE & Daikin chillers, TRANE AHU& FCU, Grundfos pumps, KUEN cooling tower• Material submission, MOS, RA, OMM, SAT reports and other project submissions etc...• Submit daily and weekly progress report, Prepare some CAD drawings

    • Sierra Constructions

      May 2018 - Mar 2020
      HSE Engineer

      • Project: New Kelani Bridge and road project-PKG01Scope of works were in the project:• Temporary hoarding, Temporary Street lights, Trial pit works, Road barricading• 150 Nos Tree removal various girth• Road diversions• Sheet piling works 6278 Nos, Different diameter bored piling to total 584 Nos, Pile caps- 64 Nos in various locations• Pier and pier head works• Box culvert (80m *30m)• ON / OFF ramp work• Erosion of soil control works, Pest controlling.• Public engagements and security• Road maintenance Show less

    • Sing Yiet civil engineering contractor pte ltd

      Mar 2020 - Aug 2022
      Engineer

      • PUB-WRN project;• Proposed Sewers in Changi East Area (Schedule I) Contract 1; • ERSS shaft work; DCM; Bore pile; Manhole constructions and sewer pipe jacking works.• Shaft 18 to 20m, Ø7.1m• JGP• Bore pile Ø0.6m from 50m to 75m X 24Nos; ULT pile• DCM: 5287MT cement; Diesel 437m3• RC pipes Ø1.2m ID,Length2,4km

    • Hyland Holdings Pte Ltd

      Aug 2022 - Oct 2023
      Project Coordinator

      Propose reconstruction of two Storey Semi-Detached houses. • Liaise with Neighbor houses/Sub-contractors/Suppliers/Architects/Engineers/clients and other specialists • Assist to QP to get Demolition, Reconstruction PTW, HS and TOP • Prepare some shop drawings for Gates, Glasses, Tiles and Marbles, Shower screen, Handrails, Boundary walls etc. • Worked for sewer and SP cable diversion PUB water, SP 3ph connection. • Prepare progress reports, verify Progress claim and VO. Get some quotations and do comparisons • Drafting some 3D perspectives for clients to visualize and understand. • Materials order and manage own workers • Ad hoc related assignments as required by the company Show less

  • Licenses & Certifications

    • Earth Control Measures (ECM) for Construction Site Personnel

      Institute of Engineers, Singapore
      Jun 2021
    • Associate Member, NIOSH

      National Institute for Occupational Safety and Health
      Jan 2020
    • Design of Fire protection and detection system

      Institute of Engineers, Sri Lanka
      Nov 2015
    • Associate Member-IESL

      Institute of Engineers, Srilanka
      Jan 2012
    • Occupational First Aid/CPR+AED

      St.Johns Ambulance Association, Singapore.
      Oct 2013
    • Develop a Risk Management Implementation Plan course

      Ministry of Manpower
      Oct 2013
    • OHSAS 18001:2007 Internal auditor course

      Ministry of Manpower
      Nov 2013
    • SMO

      Building and Construction Authority
      Jul 2020
    • Work-At-Height Course

      Ministry of Manpower
      Oct 2013
    • Building Construction Supervisor Safety Course

      Ministry of Manpower
      Oct 2013