Marwan Sarumaha

Marwan Sarumaha

Mechanical Supervisor Contractor PERTAMINA oil and gas Pangkalan Brandan Indonesia

Followers of Marwan Sarumaha161 followers
location of Marwan SarumahaIndonesia

Connect with Marwan Sarumaha to Send Message

Connect

Connect with Marwan Sarumaha to Send Message

Connect
  • Timeline

  • About me

    MECHANICAL CONSTRUCTION MANAGER at OKI PULP AND PAPER

  • Education

    • Usu medan

      1979 - 1987
      Facultas teknik technik industri
    • Universitas Sumatera Utara (USU)

      -
  • Experience

    • PT Native Prima (Medan - Indonesia

      Apr 1986 - Nov 1987
      Mechanical Supervisor Contractor PERTAMINA oil and gas Pangkalan Brandan Indonesia
    • PT Tafira (Jakarta – Indonesia)

      Jun 1987 - Oct 1989
      PROJECT ENGINEER contractor Pertamina oil gas Belawan Medan Indonesia
    • , PT Abdi Rakyat Bhakti

      Jan 1990 - Mar 1992
      Contractor PERTAMINA OIL GAS MEDAN-PANGKALAN BRANDAN REFENERY
    • Bechtel kuwait oil company (KOC)

      Feb 1992 - Feb 1993
      Millwright supv rebuild oil field and refenery kuwait oil company(KOC)

      to rebuild oil field kuwait oil (KOC) company after operation desert storm

    • PT RIAU PULP AND PAPER

      Jul 1994 - Nov 1996
      Mechanical Supervisor

      To design maintenance strategy to achieve the six goal of maintanancenamely 1.Failure avoidance, 2.Equipment reliability, 3.Risk reduction,4. Maximum production, 5.Defect elimination,6. Low cost

    • PT RIAU ANDALAN KERTAS APRIL GROUP

      Apr 1998 - Mar 2007
      Project engineer /Planner/Reliability Engineer

    • PT ANUGRAH KERTAS UTAMA (APRIL group) – 1 april 2007 to Current

      Apr 2007 - now
      Project engineer/Maintanance Planner / Reliability Engineer

      PROFICIENCYTo design maintenance strategy and to design company strategy to achieve company goal namely 1.Failure avoidance, 2.Equipment reliability, 3.Risk reduction,4. Maximum production, 5.Defect elimination,6. Low cost by IIS method (identification isolate and solve) with POF(philosophy of failure) it stand for no failure without indication except electric power and POR(philosophy of reliability) it stand for no system without back up system method and change paradigm and using SAP To develop , and install mechanical rotating Equipment mechanical protection it will send equipment message to maintenance one month before failure by sms,email base on iso2372 the condition equipment is critics to take corrective maintenance action planned and it will appears in SAP notification Show less

    • OKI PULP AND PAPER

      Jun 2015 - now
      MECHANICAL CONSTRUCTION MANAGER

      The preparation project planning, including the preparation of a detailedrequirements specification, installation specification, management plan, and project proposal for programming, implementation and training.Creates and executes project work plans and revises as appropriate to meet changing needs and requirementsMonitor delivery time and purchase order to match with iidentifies critical activitiesTo Support the Project Manager to ensure that the objectives are met and project goals are set supporting those goalsManages day-by-day operational aspects of a project and To Ensure project scope, schedule and cost are clearly defined, closely coordinated, consistently monitored and controlled throughout the project cycle. Report any deviation and proposes corrective action, to ensure the project goals for safety, schedule, cost, and quality and manages project budgetImplement project Standard and Procedures, ensuring Contractor and EPC compliance. Recommends improvements, ideas to improve work processes, policies, procedures, and design at every opportunity that will result in either program schedule improvement or cost savingMonitor and respond to QA issues and Implantation Precision Maintenance and prepare work packPrepare material/equipment specification for install , requirement ,installation communicates effectively with clients to identify needs and evaluate alternative business solutions Continually seeks opportunities to increase customer satisfaction and deepen client relationships Identification existing risk possible and potential risk equipment rotating and static and corrosion included pipe stress Identification equipment rotating and static category run to failure Show less

  • Licenses & Certifications

    • • Certified Performance Orientation Customer Orientation

      April learning institute
    • • Certified Trainer of TPM

      April Learning Institute
    • • Certified Pipe stress cesar II engineer

      Oil Institute Jakarta
      Sept 2013
    • Certified PRIMAVERA (P6.7)

      Oil Institute Jakarta
      Dec 2012
    • • Certified training Planning and scheduling

      Oil Institute Jakarta
      Nov 2010
    • • Certified TPM facilitator cource Sept.17-19.2007

      IMPACT management service PTE LTD Singapore
      Sept 2007
    • • Certified Work shop April Leader Superintendent Development program by OTI - Sept.11.2007 in ALI

      By OTI in April Learning Institute
      Sept 2007
    • • Certified Facilitator Continuous Improvement

      April Learning Institute
      Aug 2007
    • • Certified April Leader Superintendent

      April Learning Institute DDI
      Jul 2007
    • • Certified Sensodec Online Condition Monitoring

      Metso
      Feb 2002