Xiao Hui Lim

Xiao Hui Lim

Translator cum administrator

Followers of Xiao Hui Lim570 followers
location of Xiao Hui LimSingapore

Connect with Xiao Hui Lim to Send Message

Connect

Connect with Xiao Hui Lim to Send Message

Connect
  • Timeline

  • About me

    Project Engineer at J Roger Preston

  • Education

    • Northumbria University

      2012 - 2015
      Bachelor's Degree Electrical and Electronics Engineering First Class

      Activities and Societies: From University: – President of KDU University’s Engineering Society 2013/2014. – Participated in National Innovation and Invention Competition Through Exhibition 2014. Others: – Completed GreenRE Manager course on 2014. – Attended a seminar on PF Capacitor, Automation Transfer Switch and Protecting System From Lighting and Surge Activity on 2014. – Presented at D.A.R.E Biz Start Showcase 2013 entrepreneur program.

    • Multimedia University

      2008 - 2009
      Foundation degree Engineering
  • Experience

    • CHI Incorporated Sdn.Bhd

      Dec 2010 - Jun 2011
      Translator cum administrator

      • Proper updating of customer profiles, ongoing calls, emails, appointments and reports.• Manage patient's prescription• Translate Mandarin to English/Bahasa Melayu and vice versa.• Manage company basic accounts of daily sales.

    • Chimera Event Pte. Ltd.

      Jul 2011 - Sept 2012
      Supervisor Assistant

      • Recruit and provide product training to promoters.• Update the new POSM of the products.• Monitor and solve incidents occurred during the events.• Audit the weekly reports from promoters.• Prepare area logistic list and promoter’s weekly deployment.• Guide sales team to achieve product’s sales KPI.• Deal with outlets’ managers.

    • KDU University College

      Jan 2014 - Jun 2015
      Research Assistant

      • Implement mathematical optimization models for unit commitment based on the constraints associated with Electric Vehicle using C/C++ programming. • Conduct literature surveys for related topics to improve the quality of work.• Align and compare results obtained from research team to attain final results.• Rectify the optimization methods and implementations through constant team meeting.

    • Pathgreen Energy

      Dec 2015 - Mar 2016
      Project Engineer

      • Conduct site survey on eligibility of solar PV installation.• Design CGPV and SAPV system.• Produce BOM and BQ for suppliers or contractors.• Lead T&C and CCC events with local authorities: TNB and SEDA, and complete the documents for FiAH submission.• Assist business development and sales teams on technical consultation.• Generate engineering costing of the projects (Equipment, structural & electrical works)• Design green buildings complying to Green Building Index (GBI) rating tool. Show less

    • Meinhardt Group

      Apr 2016 - May 2019
      Electrical Engineer

      I have experiences in residential, commercial & mixed Developments, Industrial, Railways & Infrastructure Relocation. The scopes are included as below: 1) Provide design solutions on Electrical (up to 33kV) and ELV system.2) Attend tender pre-requisition and provide project cost estimation.3) Monitor site progress and installation to be in accordance with the design and standards.4) Building projects: Design (electrical & ELV), load estimation, plantroom scheduling, cost estimation, authority submissions, tender preparation, BIM & CAD coordination, value engineering, MEP design coordination, infrastructure relocation and site inspections.*Stage involved: Preliminary, Concept, Tender, Construction and Testing &Commissioning5) Railway projects: Stakeholder, Design (Stations, Depot, Tunnels, Traction & Auto-transformers substations), Infrastructure relocation, Electrification, location study & analysis for land acquisition, BIM & CAD coordination, cost estimation and value engineering Show less

    • Akribis Systems Pte Ltd

      May 2019 - Jun 2020
      Electrical Engineer

      • Provide electrical distribution, cable harness and safety design at machine level, in compliance to machinery directives, ISO, EN/IEC and SEMI.• Ensure machine compliance and integrity in achieving CE or UL certification. • BOM preparation and purchase• Cable routing planning, cable fabrication and assembly on machine.• Basic motion application tuning and verification, inclusive drivers’ setup and IO check.

    • BEUMER Group

      Jun 2020 - Jul 2024
      Electrical Engineer
    • J Roger Preston (S) Pte Ltd

      Aug 2024 - now
      Project enginner
  • Licenses & Certifications

    • Bachelor (Hons) Electrical and Electronic Engineering

      Northumbria University