Elena Aparicio Díez

Elena aparicio díez

bookmark on deepenrich
location of Elena Aparicio DíezLondon Area, United Kingdom
Followers of Elena Aparicio Díez932 followers
  • Timeline

  • About me

    Engineering Manager MEng CEng MICE, MAPM

  • Education

    • Spanish institution of civil engineers (ciccp)

      2015 - 2015
      International construction management course

      Have an insight into all aspects of a project and how to manage it since it is drafted until it ends, taking into account all it entails.

    • Universidad politécnica de madrid

      2005 - 2014
      Msc civil and structural engineer foundations and structures

      Final Dissertation: Offshore Wind Farm- Advanced knowledge of prestressed concrete including durability, maintenance and repair, and the influence of creep, shrinkage and relaxation in concrete structures.- Dynamic structural analysis and finite elements methods. Behavior of materials used in the structures and possibilities to modify this. How to plan a geotechnical reconnaissance campaign and results interpretation.- Morphology, resistant response and bridges construction… Show more Final Dissertation: Offshore Wind Farm- Advanced knowledge of prestressed concrete including durability, maintenance and repair, and the influence of creep, shrinkage and relaxation in concrete structures.- Dynamic structural analysis and finite elements methods. Behavior of materials used in the structures and possibilities to modify this. How to plan a geotechnical reconnaissance campaign and results interpretation.- Morphology, resistant response and bridges construction. Special foundations procedures used to solve the various types of geotechnical problems (building foundations, preload force, Jet grouting, retaining walls, micropiles...).- Advanced knowledge of an evolutionary mixed structure, monitoring the ultimate and the serviceability limit state. Show less

  • Experience

    • Certius, quality and management.

      Sept 2014 - Dec 2014
      Qa technician intern

      I gave support in the verification and certification to SMEs compliance with ISO 9000:1 & 14000:1 standards.

    • Santander bank

      Apr 2015 - Jul 2015
      Analyst of common agricultural policy

      Analyst of Common Agricultural Policy Campaign – verification of grants and subsidies from the Spanish Central Government.

    • Ferrovial

      Jan 2016 - May 2020

      Framework: Q6+1 Development at Heathrow AirportBC243 Kilo Apron Development - £180m. NEC 3 Option C (design and build)• Responsibilities- Responsible for the design development for: the steelwork (200mx150m substructure´s roof designed as a composite slab with supporting steel columns typically set out on a 9mx9m grid, £15m), three openings (8mx20m approx.) where we have to break in the operational T2 basement, and a precast partition wall (200mx12m)- Client and Stakeholders engagement- Review/accept the design- Co-ordinate the structural, architectural and M&E design- Prepare the invitation to tender (ITT) and manage supplier selection- Use all recording tools and data to keep an accurate position of project status and assess monthly application for payment- Worked with the Quality Manager to implement better procedures within the organisation, improving the documentation management system, ITP, MAFs, quality and design management plans and quality control- Responsible for creating/keeping updated the “Design Hazard Elimination and Risk Reduction Register” (risk identification meetings and lessons learnt)• Key achievements:- Manage and co-ordinate the design contracts and resources in the most efficient and cost-effective manner- Engage with Heathrow Principal Engineers to create more buildable designs from early stage. Implementation of design and construction efficiencies.- Adopt a Design for Manufacture and Assembly strategy (DfMA) to minimize working at height and workforce on site.- Be awarded with the quality Oscar when no Corrective Action Request was raised for the first time at Heathrow during HAL Audit of Design Self-Certification.- Collaborate in the implementation of the PAS 2080 certification (save more than 9000 tCO2e through design changes/opportunities) Show less Framework: Q6+1 Development at Heathrow AirportBC243 Kilo Apron Development - £180m. NEC 3 Option C (design and build)- Responsible for the design development and works preparation for: the steelwork (£15m), three openings we had to break in the operational T2 basement, and a precast partition wall.- Implementation of design and construction efficiencies.- Plan and prepare for effective works implementation.- Assist to develop, review and co-ordinate the activities schedule from subcontractors and Ferrovial, finding the most efficient programme, sequence and lifting plan to undertake the works with minimum impact and interface with our tower cranes and rest of activities.- Work with the Project Controls Engineers to ensure a robust and risked programme is produced for the delivery of the package.- Manage the project team to get the most from them and deliver an outstanding work by meeting all contractual requirements, achieving the highest standards in HSEQ, beating the company objectives and generating high levels of satisfaction among client and stakeholders.- Keep an accurate position of project status and assess monthly application for payment, claims and vesting arrangements. Show less Main Projects: Santiago Bernabèu Stadium Remodeling (Spain), University of Santiago (Chile), Iter Nuclear Fusion Station (France), London Heathrow Airport Substructure (UK), Wind Farm in Zamora (Spain), University of Málaga (Spain), Delfos Hospital in Barcelona (Spain), New residential buildings in Valencia and Bilbao (Spain).Main Projects: Santiago Bernabèu Stadium Remodeling (Spain), University of Santiago (Chile), Iter Nuclear Fusion Station (France), London Heathrow Airport Substructure (UK), Wind Farm in Zamora (Spain), University of Málaga (Spain), Delfos Hospital in Barcelona (Spain), New residential buildings in Valencia and Bilbao (Spain).- Work as structural designer within the Building Department collaborating in the design and coordination of all types of national and international projects.- Evaluate design solutions, techniques, procedures, method available, risk and cost to decide which one best suit the company needs, considering the constraints and programme drivers of each site.- Optimise design proposals leading to significant cost and time savings. Show less Managing design contracts for the Taxiways Realignment and Airfield Development Projects at Heathrow Airport (London). Leading the management of the Design with different Consultants in order to develop and release the design on time for the Construction Team under a NEC3 contractual frame, as well as supporting them on site to deliver the Projects on time to the Client. During the above process I coordinate the different interfaces between Projects and with other Contractors, as well as the engagement with the Client and Airport Stakeholders in order to foresee possible risks, avoid clashes and look for efficiencies and innovations. Main skills adopted are based on the Commercial and Contractual development, Technical expertise, British and Heathrow Standards, codes of Good Practice and Quality, mitigation of Health and Safety Hazards and Risks.PROJECTS:Framework Contract: Q6+1 Development at Heathrow Airport:- BC243 Kilo Apron Development - £180m. Target cost design and build.Framework Contract: Q6 Development at Heathrow Airport:- BC311 T1 Opportunity Stands - £35m. Target cost design and build.- BC243 Kilo Apron Development - “GSE and Roads Strategy” - £4m. Target cost design and build- BC101 CP1881 Airfield Pavement & PCA - £8m. Target cost design and build for PCA / construct only for Pavement Replacement.- BC111 Northern Bravo Taxiway Realignment and Pier 4 Demolition - £86m. Target cost design and build. Show less Framework: Q6 Development at Heathrow AirportBC243 Kilo Apron Development - £180m, NEC 3 Option C (design and build)- Manage and co-ordinate the structure concept design at its early stage, identifying potential optimisations, ensuring compliance with British and Heathrow Standards and coordinating with other disciplines in a BIM environment to ensure clash free delivery.- Manage the detailed design development of the new Kilo taxiway and stands.- Co-ordinate the subcontractors and designers’ proposals and manage change.- Review all issued documentation. Implement design efficiencies to save cost and time, ease the installation and reduce the tCO2e. Show less Framework Contract: Q6 Development at Heathrow Airport BC311 T1 Opportunity Stands - £35m. NEC 3 Option C (design and build). Creation of five new remote stands (Code E & F) on the northern area of the airfield, where the future Terminal 2A Phase 2 extension will be.- Identify and assess stakeholder’s requirements and assist to define the project scope by justifying those (highlighting design and maintenance cost implications of the non-essential requirements).- Prepare scope of works, design schedule and engineering company contract.- Request and review geotechnical surveys and liaise with the unexploded ordnance specialist to develop a plan to identify bombs.- Manage the design consultant to make sure all requirements were considered during the design definition and get design approval from the client and stakeholders at each “Gateway”.- Provide design construction support and assists with quality assurance and control processes during the project duration.- Lead the design after Carillion’s bankruptcy while a new engineering company was awarded with the contract. I defined and planned all the remaining design activities and studied which input was still needed (considering basic design and potential risks). Show less BC243 Kilo Apron Development - “GSE and Roads Strategy” - £4m. Target cost design and build.As part of the works required on BC243 and adjacent projects, a significant amount of Operational Equipment and roads required to be relocated.• Responsibilities:- Undertake a due diligence on the existing information and agree the extent of remaining design required with the client.- Assess the impact to Operational Equipment on behalf of all the projects around Terminal 2 (existing and pipeline).- Develop a new Logistics Strategy (including airside and landside roads) to stablish the GSE parking, Tug Charging, Stillage and Compactor arrangements in a phased approach during the construction works whilst protecting the interests of the airport operation at all times.- Agree changes with the relevant stakeholders (Airlines and Heathrow Operations).- Ensure notification of changes are clearly communicated to all impacted parties, including adjacent projects of other contractors at the airport and their Client representatives.- Lead, coordinate and review the design development process with all parties and later construction support.• Key achievements:- Develop a successful strategy where changes to Operational Equipment are carried out without any adversely impact to the airport operation.- Heathrow’s recognition at the end of the project during the lesson learnt session for working collaboratively with other projects, stakeholders and contractors to plan the works.- Find efficiencies and synergies with other Ferrovial projects at the time. Show less Framework Contract: Q6 Development at Heathrow Airport BC101 CPS1881 Airfield Pavement & PCA - £8m. Target cost design and build for PCA (NEC 3 Option C) / construct only for Pavement Replacement (NEC 3 Option A).Golf Taxiway asphalt resurfacing and stands pavement replacement, including the provision of new preconditioner air system infrastructure below the existing pavement while the taxiway and stands were still operational.• Responsibilities:- Manage the interface with other principal contractor working in the same area to co-ordinate the design.- Engage with two different clients (Heathrow and H.H.Op.Co) and stakeholders.- Manage the design contract and co-ordinate the two designers involved in the project.• Key achievements:- Propose all possible opportunities and efficiencies to the client.- Adjust the design to enable all works happen simultaneously.- Assist to introduce new PMB asphalt mixture minimizing impact to the airport. Show less Framework Contract: Q6 Development at Heathrow Airport Project: BC111 Northern Bravo Taxiway Realignment and Pier 4 Demolition - £86m. Target cost design and build.Reconstruction and realignment of the Northern Bravo Taxiway and some of its adjacent stands to allow Code F traffic. Partial demolition of the Pier 4 building.• Responsibilities:- Manage the design contracts.- Management of the interface with the Client and Stakeholders as well as Designers and Subcontractors. I also worked closely with key asset owners to implement specialist mitigation measures to protect sensitive assets.- Work with the commercial team, under an NEC3 contractual frame, managing the contract with Heathrow raising all kind of contract notifications (EW, TQ, CE, GC).- Prepare some of the subcontractor’s contracts.- Review and approve all design related documentation.• Key achievements:- Leading the design contracts and managing the design development and construction support under a challenge environment due to the nature of the live operational area. Ensuring the design was prepared, approved and reviewed to meet the programme key milestones.- Develop innovative construction methodologies. Leading the methodology definition and design as well as checking the sequencing and buildability with the construction team.- Assist to introduce new and advancing materials minimizing impact to the airport. Show less

      • Design Manager

        Mar 2019 - May 2020
      • Preconstruction Package Manager

        Aug 2019 - Dec 2019
      • Design Engineer - SECONDMENT to Ferrovial Head Office Design Office

        Sept 2018 - Mar 2019
      • Graduate Civil Engineer - Design Coordinator

        Jan 2016 - Dec 2018
      • Design Coordinator

        Feb 2018 - Sept 2018
      • Design Coordinator

        Jan 2016 - Sept 2018
      • Design Coordinator

        Dec 2016 - Dec 2017
      • Design Coordinator

        Sept 2016 - Dec 2017
      • Design Coordinator

        Jan 2016 - Oct 2017
    • Ferrovial construction

      Dec 2018 - now

      Framework: Q6+1 Development at Heathrow AirportBC243 Kilo Apron Development - £190m, NEC 3 Option C (design and build):Creation of a Kilo taxilane and two new stands on the west face of T2B with a 200mx150m underground substructure to house the future Early Baggage Storage and Tracked Transit System to connect T2A with its satellite T2B and future 2C. The construction consists of a perimeter diaphragm walls, 18m deep open cut excavation, in-situ concrete raft slab and steel structure with composite roof slab.Project also includes he fit out of the VCC (vertical circulation core building).• Responsibilities- Responsible for managing the design contracts and resources of all packages (structures, architecture and M&E)- Keep monthly control of the design cost against the baseline. Review applications for payment (designers and subcontractors). Organise frequent meetings with the commercial team to provide back-up on the different EWN and CE and subsequent mitigation meetings with designers/subcontractors for discussion- Provide technical support to the construction team, keeping an updated design schedule and prioritising tasks- Ensure handover documentation is submitted correctly on time- Assist with the quality control and assurance focusing on achieving the highest quality standards- Client and Stakeholders engagement and Change Control- Keep updated the “Design Hazard Elimination and Risk Reduction Register” (risk identification meetings and lessons learnt)- Held progress meetings with the team and separate meetings to organize and discuss tasks- Monitor works on site to ensure compliance with agreed systems of work• Key achievements so far:- Assist to plan for a safe and effective “back to work” after the COVID-19 lockdown. Assessing the impact a long-term suspension of works and potential scope change will have on the project (technical/cost/time/resources implications) and implement mitigation actions. Show less

      • Engineering Manager

        Aug 2022 - now
      • Design Manager

        May 2020 - Aug 2022
      • Design Manager

        Dec 2018 - Aug 2022
  • Licenses & Certifications

    • Ceng mice

      Institution of civil engineers (ice)
      Sept 2020
    • Apm member

      Association for project management
      Aug 2020
      View certificate certificate
    • Nec3: ecc project manager accreditation

      Nec contracts®
      Mar 2021
    • Member of the spanish institution of civil engineers

      Colegio de ingenieros de caminos, canales y puertos
      Oct 2014
  • Volunteer Experience

    • Support for the integration of disabled people

      Issued by Adecco España
      Adecco EspañaAssociated with Elena Aparicio Díez
    • Support for the integration of disabled people