Chandrakant B M

Chandrakant B M

Planning & Design Engineer

Followers of Chandrakant B M626 followers
location of Chandrakant B MKarnataka, India

Connect with Chandrakant B M to Send Message

Connect

Connect with Chandrakant B M to Send Message

Connect
  • Timeline

  • About me

    General Manager-DI Pipe Plant Construction-0.3MTPA

  • Education

    • College of Engineering & Technology.

      1990 - 1991
      Master's Degree Structural Engineering First Class

      Project: Studies on shear wall structures.

    • STJ Institute of Technology

      1983 - 1987
      Bachelor's Degree Civil Engineering First Class

      Project:Road Project.Water supply and waste water treatment.

  • Experience

    • M/S PatIL Construction.

      Aug 1990 - Aug 1996
      Planning & Design Engineer

      Assignments completed:• Construction of framed RCC structures like commercial building, industrial buildings.• APMC godowns, roads.• Structural design, Drawing review, Preparation of bar chart. • Rate analysis, estimation.• Sub contractor bill preparation, QA/QC.

    • Rural Engineering College.

      Sept 1996 - Feb 2000
      Sr Lecturer

      Assignments completed:• Presented six technical papers related t concrete and building blocks.• Attended five short-term courses.• Material testing & consultancy for site visits/Inspections.

    • Akash Construction Association

      Mar 2000 - Apr 2008
      Project Manager, Project Coordinator.

      Project:- A. Construction of G M Institution Of Tech, Phase I & II-(over 50,000 Sq. m).• College & Administration building for Engineering, MBA, PUC & Nursing Colleges, separate colleges.• Hostel buildings- Boys 300 strength & Girls 200 strength.• Roads, drains, compound wall, play ground, UG/OH Tank & ETP.• RCC domes at 45.00m height, Construction of Guest House, Canteen buildings. • Finishing Work: Granite, Marble & Vitrified tiles flooring, Dadoing, False ceiling, Painting works. Structural glazing.• Industrial flooring, Vacuum de-watering flooring.• Water supply/sanitary work & Electrical works.• Mass concreting, raft foundation, isolated footing work.• Quality Control: Preparation of QAP, Maintain quality control at site and at laboratory.• Perpetration and documentation of QC documents. • Maintains of Batching plant, production of concrete. • Production of concrete building blocks and burnt bricks. B. Project :- KEB 33KV Sub Station, Chalageri.Construction, erection & commissioning of substation.C. Project :- Upper Krishna Project- Irrigation Project.Construction of Canal work, Chief Engineer, Division, Subdivision office buildings, quarters, GH, Water supply & sanitation, OH Tank.D. Project :- State Highway- Motebennur to Augadi Road- 14KM.Embankment formation, BBM & asphalting work, pot hole filling, asphalt plant.E. Project :- Renovation of Gadag Railway Station & Water supply.Platform work, Repair of railway station & quarters, concreting, water supply, staircase to E & W Cabins. Show less

    • Coastal Consolidated Structures Pvt Ltd

      May 2008 - Apr 2009
      Project Manager-Mangalore Refinery & Petrochemicals Limited: Phase-III Part 'B'.

      Nature of Duties completed :-Civil & Mechanical works.• Preparation of Working Methodology.• Planning & scheduling of above works & Subsequent Monitoring.• Site grading for 20 lakh cum quantity of soil including tree cutting using heavy machineries. Construction of rigid roads, drains & construction of buildings.• Manpower & Resource Planning & monitoring of the works to do the job within the budget & to meet the Target set by the Company.• Executing the various type of Civil, Structural & architectural works & Mechanical Works.• Quality Control & Maintaining their records.• Implementing the Safety methods for Construction.• Processing of Contractor’s Bill & their Extra claims.• Preparation of Client Bill & various claims and convincing client for Processing.• Controlled & uncontrolled rock blasting.• Managing man & machine power. Show less

    • Bureau Veritas

      Apr 2009 - Jan 2011
      Sr Manager

      A) Location :-New Delhi- IGI Airport Express Line Dwarks Depot & Metro Stations. Designation :-Sr Manager Duration :-Apr 2009 to Sept 2010 Project :- DAMPLE-Delhi Airport Express Line Ltd. Nature of Duties :-Civil, Structural, Track & Piping works.Job Roles: Played key role in handling functions like:• Project management, staff administration, QA/QC etc as follows• Scrutinizing the drawings, method statements, Formats, QAP & QC documents.• Conducting laboratory, field tests, external tests & NDT.• Confirm the work as per relevant IS-Codes, method statements & drawings. • Recommend for rectification work. • Track work, Checking the structural steel work, pipe line work, precast work, painting and finishing works.• Attending regular meeting with contractor, consultant & client.• Auditing (internal and external) of projects.B) Location :- Mahan GTC1 & 2 Aluminium Smelter Project, Singrauli, MP Designation :-Sr Manager Duration :-Oct 2010 to Jan 2011. Nature of Duties:-Civil, Structural & Piping works.Assignments Completed: Playing key role in handling functions like,• Construction of RCC Chimney of 100.00m height.• Construction of Industrial buildings/sheds- both civil & mechanical works, batching plant, raft, pedestal etc.• Review of drawings, QAP, ITP, Formats, QA/QC & project related documents.• Acceptance of various materials, daily site inspection and rectification work.• Co-ordination with client & subcontractors.• Attending regular meetings. Show less

    • Lanco Infratech Ltd

      Jan 2011 - Jan 2013
      AGM Project Civil:-DCU & CHS, Water treatment & reservoiser project.

      Assignments:• Construction of pipe rack, technological structures, maz pit, vessel pit, RCC blint floor using deck sheet, exchangers, vessels, compressor house, manhole, catch basin, hard stand, pavement, substation, stacker, coke run off pound, search bin, ctc.• Total civil work construction for open raw water reservoir of capacity 2,65,000 cum with pump house, water treatment plant, consisting of two nos clarifloculator with 49m dia each 3950 cum per hour capacity, cascade aerator, flash mixer, filter house-10 beds each 11 MLD capacity, Annes building, sludge sump-20m dia with sludge thickner-18m dia, chemical house, chlorination tank & its absorption system and clear water reservoir-cooling water tank 4500 cum, DM tank 1600 cum & drinking water & service tank 800 cum. Filter house, flash mixer building, chlorination bldg, pump house, admin bldg, chemical storage bldg, substation, Interconnection/ coffer dam. drainage system, water supply system, rain water harvesting tanks• sub-station & switch yard. Roads, Fireproofing work.• Meeting with client/consultant on daily bases, attend regular meeting, resolve site related issues, etc.• Material requirement, indent for the material, consumption of material etc. Scrutinizing the drawings & updating. Subcontractor billing & arranging payment in time• QUALITY CONTROL: • Mix design, trail mix, cube strength tests, material acceptance, field tests, testing of all incoming materials, documentation, etc. Implement the QA/QC management system at site, Participate in the site internal and external site audits . Show less

    • BMM Ispat ltd

      Jan 2013 - Sept 2015
      DGM-ISP Project-1MTPA ISP

      ISP-one million capacity is under progress and responsible for overall Civil work in charge for following works. Steel melting shop & Rolling mill project- one million tone capacity.• Oxygen Plant: 425 TPD & Cooling tower: 650 cu m x 3 per hour.• MRSS: Having 160MVA, 2X80 MVA transformer with 7 bays, 220KV/33KV.• SVC: 65MVAR with 33KVA & Substation: 25MVA transformer, 33KV/6.6KV.• Power Plant: 2 x 7 MW: 90MVA X 2 No with 220 kv/11kv.• Wagon Tippler: 20 wagon per hour with 1200-1500 TPA apron feeder & tunnel.• FO Tank: 450KL & HSD: 50KL.• Air compressor facility: 9200 cu m per hour.• LPG: 2 X 50 MT bullets.• RWTP: 750 cu m per hour.• PGP: 22500 cu m capacity & additional 36000 cu m under progress.• Stockade, steam pipe line, PGP pipe line & make up water line etc.• DRI System.• Reservoirs: 03 No with capacity of 20 lakh cu m.• Tailing pond and Ash pond.• RCC Road, Drains and compound wall & etc• Bachelor & family quarters-G+4 floors. Administrative buildings, control rooms etc.• Heavy equipment foundation, precast elements.• Mix design, concrete cube testing & acceptance of cube strength of concrete, Concrete repair works. Batching plant maintains etc Show less

    • SLR METALIKS LTD- 0.3MTPA ISP

      Sept 2015 - Jul 2017
      General Manager-Project Civil

      Assignments: Civil work in-charge for construction of for Integrated Steel Plant construction-0.3 million tone capacity.• Coordination with Govt dept., local bodies, land losers for processing necessary permissions & documents.• Meeting with Govt agencies, contractors, contractor billing and payments.• Engaging small/medium contractors for speedy work in all fronts for achieving the targets without sacrificing quality and safety. All civil works are completed in record time.• Integrated Steel Plant- 0.3Million tone capacity: Steel Melting Shop-EOF, LF & VD, CCM, TOCB, ECR. Rolling Mill: Reheating furnace, Roughing mill, Intermediate mill, Finishing mill, Sizing mill 1,2 3, Cooling bed-1,2, ECR etc. Total RCC quantity is 60000 cu m.• Oxygen Plant- 120 TPD-SVD & ASU. MRSS: Having 5 bays, 220KV/6.6KV. AFBC Boiler-1x5 MW.• Shut down jobs: DRI System, Blast furnace, Sinter plant & Power plant.• Construction of Jack well, pump house, pipe line, reservoirs. RWTP, Water complex, cooling towers, Overhead tank. Reservoirs: 02 No with capacity of 6 lakh cu m. Stockyard for service lines & power cables.• Internal roads in industries and town ships. Cement concrete, bituminous, WBM road network.• Hard stand, industrial flooring. Embedded railway track-1KM. Road alignment, design, construction including side drains, road crossings, and culverts for 6KM for old plant road. Show less

    • HYT Eng Company Pvt Ltd

      Apr 2017 - Apr 2019
      GM Project

      Assignments: Inception to completion of project.o Engaging Architect, Structural Design Consultant, Elt consultant, Service line consultants.o Preparation of GAD layout, individual shop/service bldg GAD preparation and getting approval from WP Patna. Design of workshop and other structures and getting approvals.o Engaging manpower, subcontractors, machineries, materials for the work.o Engaging Pilling contractor and execution of work. Local issues and smooth conduct of works.

    • S K Samanta & Co (P) Ltd-10MTPA CHP

      Apr 2019 - Mar 2023
      Sr Project Manager

      Construction of 10 MTPA Coal Handling Project-Coal receiving Complex, bunker, silos, THs, DHs, Service Buildings, Switch yard, substations, Road & drain.

    • THE SANDUR MANGANESE & IRON ORE LTD

      May 2022 - now
      General Manager
  • Licenses & Certifications

    • Life Member

      Indian Society for Technical Education
      Jan 1997
    • Member Institute of Engineers

      Institution of Engineers of India (IEI), Kolkata
      Jan 1999