Marco Renzi

Marco Renzi

Followers of Marco Renzi829 followers
location of Marco RenziRimini, Emilia-Romagna, Italy

Connect with Marco Renzi to Send Message

Connect

Connect with Marco Renzi to Send Message

Connect
  • Timeline

  • About me

    Senior Project Manager at Cefla

  • Education

    • Liceo Scientifico A. Serpieri, Rimini

      1995 - 2000
    • Alma Mater Studiorum – Università di Bologna

      2000 - 2006
      97/100 Mechanical Engineering, Energetic Course

      Thesis: "Research and development of excavation plants strictly related to sea-water port areas".Thesis carried out in collaboration with University of Bologna and GEAT S.p.A. (Riccione, RN), through laboratory experimentation, tests on pilot plant and research for materials suitable to sea water.

  • Experience

    • Foster Wheeler

      Jan 2007 - Jun 2012

      Front-End Engineering Design project carried out in Consortium with Toyo Engineering Co. and Y&V Ingegneria y Construccion, for the expansion of El Palito Refinery, located in Venezuela.Main tasks and responsibilities:- Coordination of engineering activities and preparation of technical documentation (i.e. Piping and Instrumentation Diagrams, Fire Fighting Layout, etc.) for the Process Units under FWI Scope of Work (i.e. Continuous Catalytic Reforming, Naphtha Hydrotreating, Hydrogen Production Unit)- Coordination of the activities performed by Foster Wheeler Bimas, Engineering Center located in Turkey in charge of the 3D Model development by means of Intergraph PDS.- Management of Project Correspondence and Technical Queries, among Consortium Members and with Client. Show less Revamping of several Process Units included in the Modernization Program of Mazeikiu Nafta Refinery, located in Mazeikiai, Lithuania.Main tasks and responsibilities during the assignment at Site (Jan. 2007 to Feb. 2008):- Coordination of engineering activities for two subprojects: "Design and Procurement of New Boilers" and "Compressor Control and Preservation Scheme Development".- Interface with Client, Vendors and Subcontractors.- Interface with LSPI, Lithuanian Company in charge of the legalization of Foster Wheeler drawings in accordance with Lithuanian Rules and Standards. - Development and updating of technical documentation such as Piping and Instrumentation Diagrams, Tie-ins List, Material Requisitions, etc.- Site surveys.Activities carried out from the Home Office (Feb. 2008 to Oct. 2008):- Assistance to the Project Director in the supervision of Procurement, Expediting/Inspection and Administration activities.- Assistance to the Site Team for the resolution of field technical discrepancies.- Preparation of Project Progress Reports. Show less

      • Field Project Engineer for "DAV2 Revamping Project"

        Apr 2011 - Jun 2012
      • Project Engineer for "El Palito Refinery Expansion Project"

        Jun 2008 - Jan 2012
      • Project Engineer for "Mazeikiu Nafta Complex Modernization Program"

        Jan 2007 - Oct 2008
    • Enereco S.p.A.

      Aug 2012 - Oct 2015
      Project Engineering Manager
    • STC POWER S.r.l.

      Oct 2015 - Feb 2021
      Project Manager
    • Cefla

      Feb 2021 - now
      Senior Project Manager
  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Jul 2020
      View certificate certificate