Mohammad Al-Damerji

Mohammad Al-Damerji

Site Civil Engineer

Followers of Mohammad Al-Damerji761 followers
location of Mohammad Al-DamerjiTabuk, Saudi Arabia

Connect with Mohammad Al-Damerji to Send Message

Connect

Connect with Mohammad Al-Damerji to Send Message

Connect
  • Timeline

  • About me

    Senior Cost Control Engineer

  • Education

    • Lebanese American University

      2023 - 2025
      Masters In International Construction Management Construction Management
    • Beirut Arab University

      -
      Bachelor of Civil Engineering Civil Engineering
  • Experience

    • Al Saad General Contracting Co.

      Oct 2012 - Mar 2013
      Site Civil Engineer

      - Reviewed drawings to implement and coordinate design / shop drawings, and transmit data to subordinates- Executed all finishing site works as planned/scheduled- Supervised the performance of Finishing Foremen and Laborers.- Performed daily site inspection/inspection of works.- Monitored all finishing works e.g. Painting, Gypsum Boards, and ceilings Tiling, etc.PROJECTCity Center Beirut (Majid Al‐ Futtaim) is the biggest mall in Lebanon, This exciting destination is over 650,000 square feet consisting of three underground parking levels for more than 1752 cars, three retail floors with more than 200 stores and food and entertainment facilities at the roof top including 13 multi screen vox cinemas. Show less

    • Arabian Construction Co.

      Apr 2013 - Jul 2020

      - Mapped project BOQ items to CSI codes vs. BOQ bills to streamline reports in all requested forms.- Issued weekly reports for labor productivity and cost per trade.- Audited vendor invoices & subcontractors payments (including variations, deductions, etc.. ).- Monitored inventory & manpower flow vs. cost against schedule and budget.- Monitor QS payments (certified, applied as well as subcontractors).- Monitored floats, shop‐drawing submittals, NCRs, NPVs..- Performed Earned Value Analysis and tracking progress for all company projects on monthly basis.- Issued percentage of completion & cost to complete reports to management. Show less - Controlled and monitored project total expenditure including verifying and checking of invoices and claims from vendors to ensure that all project expenditures are captured and properly recorded.- Ensured effective project implementation and utilizing productive reports with the use of project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the project.- Developed & created new projects' Work Breakdown Structure in ERP system based on project BOQ and cost codes. Show less

      • Cost Control Engineer

        Jan 2017 - Jul 2020
      • Cost Control Engineer

        Apr 2013 - Dec 2016
    • Arabian Construction Co.

      Nov 2020 - now

      • Set up baseline budget (resource/revenue/cost) with appropriate WBS/CBS interfacing with various disciplines.• Perform, Analyze, forecast, and report schedule, resource, revenue and cost status against the established baseline.• Follow‐up with project managers on regular project forecast updates including periodic assistance in estimating the remaining project costs (ETC), as well as any necessary provisions and risks (analyze WIP, EV, EAC, BAC, etc.). Keep track of hours, expenses, costs, and budget updates• Analyze material purchase orders compared to budget as part of the review process for the monthly reports.• Prepare and update the cost control management database, and weekly, monthly cost and forecasting reports.• Review project timesheets and allocate man hours against pre‐approved work orders and estimated hours at completion on a timely manner• Review distributable indirect cost estimates, developed basis for temporary facilities, miscellaneous construction services, construction tools and equipment, non-manual manpower, startup services, payroll taxes and insurance, camp facilities and operation, and other field office costs.• Review and approve purchase orders, invoices, and expense reports to ensure compliance with company policies and budget limits.• Develop and implement cost control strategies and procedures to ensure effective financial management.• Review payment applications, invoices and make recommendations.• Review contractual documents and contract modifications to determine scope of work and scope changes, and define cost and schedule impacts to the base contract.• Participate in the project review meetings and provide any cost related data as and when required by the project stakeholders• Monitor and analyze financial data to identify cost-saving opportunities and improve profitability Show less • Established project control budgets based on approved project cost estimate• Reviewed cost commitment and expenditure information for input to computerized cost control and reporting system.• Followed‐up with project managers on regular project forecast updates including periodic assistance in estimating the remaining project costs (ETC), as well as any necessary provisions and risks (analyze WIP, EV, EAC, BAC, etc.). Keeps track of hours, expenses, costs, and budget updates.• Participated in regular meetings with project managers and other stakeholders (internal and external) to ensure the progress of the project and the achievement of project objectives and results.• Ensure follow‐up of scope changes and coordination with the project control team.• Performed cost to complete report and advised management of any forecast cost overruns.• Prepared and analyzed comparisons of scope, quantities, and cost data between the projects through ERP (SAP SYSTEM). Performed productivity and cost analysis of Construction operations and verified results.• Prepare and transmit to management reports on project performance (monthly, quarterly, and annual), as well as other documents related to project portfolios.• Coordinated pricing structure or criteria to be used by each discipline or specialty to meet the objectives of the cost estimate• Developed unit job hour and pricing data for a specific discipline or other specialty, including estimating parameters, factors indices, productivity, and craft distribution reference data, based on analysis of project and industry experience. Performed data analysis, identified problems, and made recommendations.• Mentored and managed entry and mid career level engineers. Show less

      • Senior Cost Control Engineer

        Mar 2024 - now
      • Project Controls Engineer

        Nov 2020 - Feb 2024
  • Licenses & Certifications

    • Engineering Project Management: Scope, Time and Cost Management

      Rice University - Susanne M. Glasscock School of Continuing Studies
      Feb 2021
    • Engineering Project Management: Risk, Quality, Teams, and Procurement

      Rice University - Susanne M. Glasscock School of Continuing Studies
      Apr 2021
    • Engineering Project Management: Initiating and Planning

      Rice University - Susanne M. Glasscock School of Continuing Studies
      Mar 2021