Guilherme Oliveira

Guilherme Oliveira

Co-Op

Followers of Guilherme Oliveira2000 followers
location of Guilherme OliveiraUnited Kingdom

Connect with Guilherme Oliveira to Send Message

Connect

Connect with Guilherme Oliveira to Send Message

Connect
  • Timeline

  • About me

    New Product Development | Manufacturing Engineering | Manufacturing | Engineering

  • Education

    • Universidade Federal do Rio de Janeiro / UFRJ

      2007 - 2008
      MSO - Offshore Systems
    • Ibmec Business School

      2012 - 2014
      Master of Business Administration (MBA) Business Administration, Management and Operations
    • Universidade Federal Fluminense

      2001 - 2006
      BS Mechanical Engineering

      Activities and Societies: Diretório Acadêmico Otávio Cantanhede (DAOC/UFF)

  • Experience

    • Brascan Shopping Centers

      Nov 2003 - Apr 2005
      Co-Op

      - Corrective maintenance services support;- Sprinkler head and HVAC diagrams review;- Purchase of spare parts;

    • PLANAVE S/A

      Jun 2005 - Sept 2005
      Co-Op

      - Design of piping support;- P&ID analyses and review;

    • Estaleiro Mauá

      Oct 2005 - Jul 2006
      Co-Op

      - Elaboration of Factory Acceptance Test procedures;- P&ID analyses (sub-systems);- Coordination and witness of Hydro tests (valves and piping);- Commissioning of FPSO P54;

    • FMC Technologies

      Aug 2006 - Oct 2016

      - Lead the development of Fabricators for large structures manufacturing.- Manage the delivery of multiple projects and different customers.- Responsible to develop the infrastructure and resources to meet the short term and long term business strategy.- Responsible to evaluate alternatives for insourcing/outsourcing (make/buy) decisions and prepare AFEs for management approval for manufacturing facility expansions that are needed to achieve productiongoals.- Coordinates communication with the Fabricator to identify variables that affect producibility and product performance and incorporates them into product design and modification through established processes.- Review cost estimates of structural fabrication and pipe welding.- Develop and implement new production, fabrication and assembly methods. Recommends andimplements improvements in machining, fabrication, assembly and testing processes.- Manage an engineering staff of 20 members and production staff of 40+ members- Develop manufacturing strategy to meet business demand.- Plan and control Natural Expenses and Capex.- Responsible for the lean philosophy implementation;- Lead the quality improvement projects like RCAs and SMIQs; Show less - Responsible for the implementation of the standard qualification test procedures;- Elaboration of FAT and Qualification Test procedures;- Scheduling and quotation of product qualification;- Design of qualification facilities (i.e. Test Cells, Hyperbaric Chamber, etc..) and test fixtures;- Specification and design of test HPU; - Elaboration of operational and maintenance procedures for test equipment (i.e. HPUs);- Leading the qualification process, according to API 6A and 17D, of 15K Actuated Gate Valves, 15K Tubing Hangers, Hydraulic Connectors and metallic gaskets. Show less Leading the Industrial Engineering Team (Engineer, Assy and test Process Technician and Drafter, ), with the main objective to foresee, design and manufacture all tests necessities as devices and fixtures (flanges, special tooling, test stands), HPUs (Hydraulic Pressure Unit), Boosters, Hydrostatic and Gas special panels, fittings…Elaborate the production strategy as test sequence, studies of area and bottle necks for the Assembly and Test process.Support the Product Engineering in the elaboration of projects and tests procedures as FAT in accordance with API Standard.Responsible for schedule development and the Test Plan for the following projects:- FRADE EHXT;- Mexilhao VXT;- GLL-9 VXT;- Roncador III VXT;- Tambau VXT; Show less •Ensure that project assembly and tests run smoothly.• Reviewing drawings, planning upcoming daily work, interpreting specifications.• Being the liaison with the clients.• Providing tooling and shop equipment designs, and works with various vendors.• Assists bases with equipment and tooling needs that improve safety and ergonomic conditions.• Resposible for the Assembly and Test Plan for the following projects: - PDET: First Subsea System supplied by FMC Brazil; - FRADE: Chevron’s first subsea development in Brazil and FMC's most complete scope for an overall subsea system ever in Brazil. - Albacora RWI: Raw Water Injection System; Show less

      • Manufacturing Manager

        Sept 2011 - Oct 2016
      • R&D Qualification Engineer

        Jul 2010 - Sept 2011
      • Well Completion System Assy & Test Engineer

        Apr 2009 - Jul 2010
      • Assy and Test Engineer

        Jan 2007 - Apr 2009
      • Co-Op

        Aug 2006 - Dec 2006
    • TechnipFMC

      Oct 2016 - now

      - Leading new product development and industrialisation projects.- Lead the development of new products for the renewables industry.- Act as the single point of contact to new partners on the development.- Lead the manufacturing strategy for large structures as part of the company's Offshore Floating Renewables offering.- Engage stakeholders from different business units, departments and regions- Represent company on joint industry programs;- Lead the Scope 3 carbon reduction project; Show less - Lead the Manufacturing Readiness Level and new products introduction in the production environment.- Manage improvement projects in different areas (machining, fabrication, assembly and testing processes) in order to reduce cost and lead time and achieve company's target.- Manage an engineering staff of 20 members in two countries.- Manage the creation and deployment of manufacturing execution documentation.- Lead the development of the appropriate manufacturing processes to meet both technical and commercial requirements; Show less - Lead projects from the tender to execution.- Present design reviews and technical meetings to customers.- Review engineering documentation for development of complete product cost profile.- Customer specifications review as inputs for RFQ.- Ensures tendered scope meets project specifications, standards, and performance requirements.- Development of cost comparison reports and recommendations for cost improvement projects.- Work closely with product development team and assists in capturing key customer requirements intoproduct standards.- Managing the technical aspects of the proposals with a very good track of awards (Exxon Liza, Equinor Peregrino, BC-10 Compact Manifold, Petrobras Merlin Manifolds, LiuHua Manifold, Pyxis Manifold, etc).Leading the Exxon Liza phase 1 Manifold (WI and GI) from the tender and mobilization phase up to the detailing phase.- Creating the execution strategy for the Compact Manifold tenders. Show less

      • Chief Product Developer, Dynamic Inter-Array Cable, Floating Wind

        Apr 2024 - now
      • New Product Introduction Manager

        Mar 2022 - Apr 2024
      • Manufacturing Engineering Manager

        Nov 2018 - Feb 2022
      • Project and Tender Engineering Manager

        Oct 2016 - Oct 2018
  • Licenses & Certifications

    • Mechanical Engineer

      Crea-RJ
      Jan 2007