George Abader

George Abader

Architect

Followers of George Abader24 followers
location of George AbaderSaudi Arabia

Connect with George Abader to Send Message

Connect

Connect with George Abader to Send Message

Connect
  • Timeline

  • About me

    Technical Office Manager at ACC

  • Education

    • Helwan University Cairo

      1991 - 1996
      Bachelor of Architecture (B.Arch.) Architecture GOOD

      Activities and Societies: CHESS, YOGA, FOOTBALL TEAM,SCULPTURE, OIL PAINTING,.... STUDIED ARCHITECTURE & INTERIOR DESIGN

  • Experience

    • CONCORD

      Sept 1996 - Jul 1998
      Architect

      • Preparing preliminary sketches for concept drawing &possible alternatives for architectural and decoration projects, Uses computer-aided design software to facilities process• Preparing Working drawing & Shop Drawing Details including Wall Finishing Details, Ceramic Working Details, Raised Floor Working Details, Ceiling Working Details,…….. • Co-ordination with other departments (Civil, HVAC, Plumbing, Fire Fighting….. )• Developing more detailed plans integrating engineering considerations and presents these for client review and approval.• Site Supervising on the execution of work activities and ensure matching with design and shop drawingsPROJECTS :- Residential Buildings, EGYPT ( RESIDENTIAL PROJECTS )DESIGN & TECHNICAL OFFICE TEAM.- Touristic Village, Ain Sokhna, EGYPT. ( HOSPITALITY PROJECTS )DESIGN & TECHNICAL OFFICE TEAM.- SALEM HELAL PALACE, EGYPT. ( FIT-OUT PROJECTS )DESIGN & SUPERVISION TEAM.- ELHELAL & ELNEGMA EL-ZAHBIA SHOWROOM, EGYPT. ( FIT-OUT PROJECTS )DESIGN & SUPERVISION TEAM. Show less

    • INTERCONSULT

      Jul 1998 - May 2000
      Architect

      • Preparing preliminary sketches for concept drawing &possible alternatives for architectural and decoration projects, Uses computer-aided design software to facilities process• Preparing Working drawing & Shop Drawing Details including Wall Finishing Details, Ceramic Working Details, Raised Floor Working Details, Ceiling Working Details,…….. • Co-ordination with other departments (Civil, HVAC, Plumbing, Fire Fighting….. )• Developing more detailed plans integrating engineering considerations and presents these for client review and approval.• Site Supervising on the execution of work activities and ensure matching with design and shop drawings.PROJECTS :- CENTRAL LIBRARY of CAIRO UNIVERSITY, EGYPTDESIGN & TECHNICAL OFFICE TEAM.- DOMIATE HOSPITAL OF HEART & DIGESTIVE SYSTEM, EGYPTDESIGN & TECHNICAL OFFICE TEAM.- SOHAG HOSPITAL OF HEART & DIGESTIVE SYSTEM, EGYPTDESIGN & TECHNICAL OFFICE TEAM. Show less

    • Orascom Construction (OC)

      May 2000 - Jan 2007
      Senior Architect

      • Preparing working drawings and shop drawings according to the American standards and ISO system 9001& 9002.• Developing more detailed plans which integrate with engineering considerations (Policies, Standards, Specifications, Procedures, ……) and meet the Global Standards requirement• Co-ordination between site requirement, procurement department, logistics department, vendors and technical office to ensure the availability of materials at site according to prepared time schedule.• Site supervising on the execution at the site.PROJECTS :- J.W.MARRIOT HOTEL - KATAMIYA HEIGHTS, EGYPT ( HOSPITALITY PROJECTS )Role: Technical Office & Supervision Team.- P&G Factory, EGYPT ( INDUSTRIAL PROJECTS )Role: Technical Office.- LNG Factory, EGYPT ( INDUSTRIAL PROJECTS )Role: Technical Office.- FAYED AIR BASE RENOVATION, EGYPT ( MILITARY PROJECTS )Role: Technical Office & Supervision Team.- BAGRAM BASE, Afghanistan ( MILITARY PROJECTS )Role: Technical Office & Project Control.- HERAT BASE, Afghanistan ( MILITARY PROJECTS )Role: Technical Office & Project Control.- CABUL BASE, Afghanistan ( MILITARY PROJECTS )Role: Technical Office & Project Control.- KANDAHAR HOSPITAL, AfghanistanRole: Technical Office & Project Control. Show less

    • Dubai Real Estate Corporation

      Apr 2007 - Jan 2014
      Design Manager

      • Oversee, manage and evaluate the performance of all Design departments and Third Party Design Consultants. direct their work and coordination with International consultants.• Supervising the development of design policies, standards and processes,• Building and maintaining strong relationships with internal and external stakeholders and Resolving client concerns and issues, managing their Meeting, coordination and presenting the design to them• Negotiating skills with contractors and other professionals,• Responsible to manage the whole process from design concept, to tendering all types of projects• Managing the day-to-day operational aspects of the project.• Preparing initial design and setting the feasibility standard. • Managing the project preliminary concept design as per development planning manager directive• Developing realistic concepts that are able to meet and exceed market expectations in identifiedopportunities.• Preparin project management documents including program, project deliverable, agreements,LOI’s and request for proposal (RFP). Show less

    • Al Shabanat Engineering Consultant Office

      Apr 2012 - Mar 2014
      Senior Project Manager

      A Senior Projects Manager for the construction of Housing Projects consists of 2944 Residential Units (Villas) + 14 Mosques with a capacity between (400-1600) Prayers, total built up area of 750.720 SQM and budget/cost of 1300 Million SAR.

    • QDesign-KSA

      Mar 2014 - Mar 2015
      Senior Project Manager

      * A Senior Projects Manager for a fast track Strip Malls Projects consist of 4 Buildings and each building has one Hyper Store ( 3 for TAMMIMI and 1 for CENTERPOINT ), retail and administration offices with a total built up area of 48.500 SQM and budget/cost of 74 Million SAR.* A Project Manager for the Mentioned project which consists of one floor at Gate Tower Building, comprises of many Architectural, Electrical, and Mechanical works with a total built up area of 950 SQM.* A Project Manager for the Mentioned project which consists of one floor at Al Osman Holding Tower, Khobar, Saudi Arabia and comprises of many Architectural, Electrical, and Mechanical works.with a total built up area of 1100 SQM and budget/cost of 3.2 Million SAR. Show less

    • ACC(Advanced Construction Center)

      Mar 2015 - now
      Technical Office Manager

      A Technical Office Manager for the Project of KING ABDULLAH PROJECT FOR DEVELOPMENT OF JUDICIARY FACILITY, The construction of 6 COURTS and 7 NOTARIES in different 13 locations in Eastern Province ( Khobar, Dammam, Oyoun, Katef, Hafr Elbatn, Hofof, Abkek, Saaera, Rafeaa, Olaya and Harad ) with a total built up area of 65.480 SQM and budget/cost of 396 Million SAR.

  • Licenses & Certifications

    • FEASIBILITY STUDY

      May 2007