Yudi Heriyadi

Yudi Heriyadi

Engineer. Supervisor OQC/CSQA

Followers of Yudi Heriyadi1000 followers
location of Yudi HeriyadiWest Java, Indonesia

Connect with Yudi Heriyadi to Send Message

Connect

Connect with Yudi Heriyadi to Send Message

Connect
  • Timeline

  • About me

    Asst.Manager QMR/QA/QC/PRODUCTION at PT.BYUNG HWA INDONESIA

  • Education

    • STMIK AMIKOM

      2000 - 2003
      Diploma III. Information Management Manajemen informatika
  • Experience

    • PT.Epson

      Jan 1996 - Nov 2018
      Engineer. Supervisor OQC/CSQA
    • PT Indonesia Epson Industry

      Jan 1996 - Nov 2018

      1. Cost down project & Efficiency inspection process2. Quality monthly report3. Follow up Quality issue4. New model / customer preparation until Mass Production5. Shipping review new model & new customer6. Quality Improvement activity7. 4M change quality confirmation8. Analyze Defective Finished Goods9. Customer claim quality handling10. Conduct audit in production line & Vendor parts problem11. Maintain Quality action in production line12. Review inspection method13. Document Control (Final Inspection Standard, Inspection Instruction Notice, Check sheet)14. Evaluation Customer Risk15. Evaluation Transportation testo Evaluation Drop test & Vibration Show less 1. Man power requirement for inspection2. Cost down project & Efficiency inspection process3. Follow all process inspection (normal & optional inspection)4. Follow mini durability test5. Follow capability inspector6. Control Fixed / Pre fixed asset7. Quality monthly report 8. Follow up Quality issue9. New model / customer preparation until Mass Production10. Shipping review new model & new customer11. Quality Improvement activity12. 4M change quality confirmation13. Analyze Defective Finished Goods14. Customer claim quality handling15. Conduct audit in production line & Vendor parts problem16. Maintain Quality action in production line17. Review inspection method18. Document Control (Final Inspection Standard, Inspection Instruction Notice, Check sheet)19. Control Jigs / Tools / Consumables & Follow up maintenance Show less 1. Follow up Quality issue2. New model / customer preparation until Mass Production3. Quality Improvement activity4. 4M change quality confirmation5. Analyze Defective Finished Goods6. Customer claim quality handling7. Conduct audit in production line & Vendor parts problem8. Maintain Quality action in production line9. Review inspection method10. Document Control (Final Inspection Standard, Inspection Instruction Notice, Check sheet)11. Control Jigs / Tools / Consumables & Follow up maintenance Show less

      • Engineer Product Quality Assurance

        Apr 2015 - Nov 2018
      • Supervisor OQC

        Apr 2013 - Mar 2015
      • Engineer OQC

        Apr 2004 - Mar 2013
      • Senior Leader OQC

        Apr 1999 - Mar 2004
      • Leader OQC

        Apr 1998 - Mar 1999
      • Assisten Leader OQC

        Apr 1997 - Mar 1998
      • Inspector OQC

        Jan 1996 - Mar 1997
    • PT.BYUNG HWA INDONESIA

      Mar 2019 - now

      Define Division and Department Action Plan to achieve Company Policy.1. Control & Review Progress of Division/Department Action Plan and decide next Action.2. Management Representative for IATF16949 Certification.3. Lead New project Activity for New Model Customer.4. Define budget plan / forecast establishment, repair / Maintenance of machine, jig, tool, equipment, consumable and man power requirement. 5. Define manufacturing Policy with control Production (finishing assembly & inspection), Quality management representative, Quality assurance & Quality control, Research & Development.• Production Production achievement controlling. Productivity up for & Assembly process. Reduce cost operation.• QMR : Ensure that the processes required for the quality management system are established, implemented and maintained. Report to top management on the performance of the QMS (quality management system) and any need for correction. Ensure the promotion of awareness of customer requirements throughout the organization.• QA & QC : Create and build Quality system. Establish IATF16949;2016, ISO14001:2015. Build sense of Kaizen/Improvement. Handling complaint customer & Quality satisfaction.• Research & Development Develop & Prepare new business overseas of automotive Precision cutting product. Develop & Prepare new business Local of automotive Precision cutting product. Show less 1. Define Division and Department Action Plan to achieve Company Policy.2. Control & Review Progress of Division/Department Action Plan and decide next Action.3. Management Representative for ISO 9001, IATF16949 Certification.4. Lead New project Activity for New Model Customer.5. Define budget plan / forecast establishment, make forecast all of department, repair /Maintenance of machine, mold, jig, tool, equipment, consumable and man powerrequirement. 6. Define manufacturing Policy Plant with total control Production, Quality assurance &Quality control, Research & Development, Mold shop, PPIC, Warehouse,Delivery control.• Production Production achievement controlling. Productivity up for Injection & Assembly process. Reduce cost operation.• QA & QC : Create and build Quality system. Establish ISO9001;2015, IATF16949;2016, ISO14001:2015. Build sense of Kaizen/Improvement. Handling complaint customer & Quality satisfaction.• Research & Development Develop & Prepare new business overseas of Korean Car Valve body. Develop & Prepare new business Local of UID HSMR Pre-mold.• Mold shop Cleaning mold as periodic. Mold repair and Machining process controlling.• PPIC Production plan controlling base on PO.• Warehouse Inventory and control of material and finish good. Establish production system (Kanban, FIFO) for logistic operation.• Delivery control Control operation part delivery to customer and from vendor. Show less

      • Asst.Manager QMR/QA/QC/Production (plant 1st_Precision Cutting Machining)

        Sept 2020 - now
      • Asst.Manager Factory (plant 2nd_Plastic Injection)

        Mar 2019 - Sept 2020
  • Licenses & Certifications

    • QC-Introduction Training

      Quality Assurance
      Dec 1996
    • Outbound Management Training System (Outing Team Awareness Program)

      Management /Training consultant
      Mar 2001
    • Fire Prevention & First Aid training

      HRD
      Oct 1998
    • IATF 116949:2016 Internal Audit Training

      GSC Global Standard Consulting
      Jul 2024
    • IATF 16949:2016 Awareness Training

      GSC Global Standard Consulting
      Jul 2024
    • Kiken Yotchi & Risk Assesment training

      HRD
      Jul 2010
    • 20 Hours Course of Japanese Work Ethics & Corporate Culture

      Japan International Cooperation Agency (JICA)
      Apr 1999
    • Basic Safety, Health & Fire training

      HRD
      Jun 1998
    • Outbound Management Training System

      Management /Training consultant
      Jun 1998