Muhammad Khizer Butt

Muhammad Khizer Butt

Internship

Followers of Muhammad Khizer Butt4000 followers
location of Muhammad Khizer ButtPakistan

Connect with Muhammad Khizer Butt to Send Message

Connect

Connect with Muhammad Khizer Butt to Send Message

Connect
  • Timeline

  • About me

    Manager Engineering, Projects & ELS @Avery Dennison - xReckitt - xUnilever

  • Education

    • NED University of Engineering and Technology

      2008 - 2011
      Bachelor's of Engineering Industrial & Manufacturing
  • Experience

    • Shell Oil Company

      Jun 2010 - Jul 2010
      Internship

      Worked with Shell Pakistan on the projects of:- Study all the processes flow.- Suggestions for improvement.- Need Analysis Surveys.

    • Pak Suzuki Motor Company Limited

      Jan 2011 - Dec 2011
      Final Year Project

      Improvement in hemming press utilization through process improvement.- Process flow study- Time study- Identified bottlenecks- Improvement in process and layout- Increasing productivity- Reducing costs

    • Agriauto Industries Limited

      Apr 2012 - Sept 2013
      Maintenance Engineer

      - Responsible to ensure timely execution of maintenance activity during shift and assure maximum capacity utilization with energy efficient way and with optimize workforce.- Responsible for continual improvement to ensure, control and optimize system activities.- Manage day to day issues of factory staff and manage any grievances effectively.- Responsible for standardizing Food Grade and Non-Food Grade Lubrication system on all machines.- Led 5S Pillar, co-ordinate and support all TPM activities and ensure progress as per Master plan. Show less

    • Unilever

      Sept 2013 - Jun 2018

      Responsibilities:- Led a high-performing team of 20 members, fostering a results-oriented environment.- Utilized technical expertise to drive operational efficiency gains through plant improvement projects.- Expanded plant capacity by successfully leading the setup and start-up of new production lines.- Managed the Planned Maintenance Pillar, supporting World Class Manufacturing initiatives to optimize reliability and minimize downtime.- Implemented automation solutions, streamlining operations and reducing costs.- Oversaw critical utilities equipment operations, ensuring seamless functionality, reliability, and safety through proactive inspections and HAZOP studies.Major Projects:- Automated Production: Transitioned manual operations to fully automated systems by installing Automatic Cartoning and Bundling Lines.- Boosted Productivity: Significantly enhanced system productivity through the installation of a Core Design Sifting Line.- Streamlined Packaging Processes: Automated manual filling and packing systems, optimizing efficiency through the design, commissioning, and installation of automated jar lines. Show less Responsibilities:- Ensured smooth operation of Utility Equipment through proactive maintenance.- Coordinated and achieved tangible targets through site savings initiatives.- Established annual service contracts with 3P contractors, optimizing maintenance operations.- Oversaw successful installation and start-up of new facility improvement projects.- Ensured on-time inspections of plant equipment, maximizing functionality and minimizing downtime.- Served as the site savings coordinator, driving the achievement of stretch goals.Major Projects:- Spearheaded Sustainability: Led a 250KW solar panel project, reducing carbon footprint by 175 metric tons annually.- Optimized Warehousing: Increased storage capacity by implementing a G+3 Racking system.- Improved Site Infrastructure: Designed and renovated the site's admin block, enhancing functionality and aesthetics. Show less

      • Area Engineer & SUIT

        Feb 2016 - Jun 2018
      • AM Central Engineer

        Sept 2013 - Feb 2016
    • Reckitt

      Jul 2018 - Jul 2024

      Responsibilities:- Led complex projects, aligning them with organizational goals and driving successful outcomes.- Identify, assess, and mitigate risks to ensure project success and minimize disruptions.- Closely coordinate with stakeholders regarding CAPEX and OPEX expenditures to optimize budget.- Foster strong relationships with key stakeholders, providing transparent and timely communication.- Utilize data and analytics to monitor progress, make informed decisions, and optimize performance.- Cultivate a high-performing team, providing guidance and support for their professional growth.- Devise a culture of learning and improvement, seeking innovative solutions and best practices.Major Projects:- Dettol Liquid Hand Wash Line: Increased production volume, ensured safety/quality, enhanced efficiency, significant annual savings.- Veet-Line Automation: Eliminated system bottlenecks and automated the bottle blowing process.- Dettol Antiseptic Liquid Production Transformation: Annualized savings, significant waste reduction, safety compliance, enhanced efficiency.- Warehouse Construction: Increased storage capacity by 15%, designed and executed Ground + 4 warehouse.- Gaviscon & Antiseptic Lines Buffer Tanks: Increased system capacity and efficiency by 1%, led installation. Show less Responsibilities:- Spearheaded a high-performing team, cultivating a culture of operational excellence.- Strategically minimized equipment downtime, ensuring optimal Overall Equipment Effectiveness (OEE) through proactive maintenance.- Orchestrated both planned and unplanned maintenance activities, guaranteeing uninterrupted equipment reliability and production continuity.- Exercised prudent fiscal management, achieving substantial cost reductions in R&M expenditures.- Executed energy audits and efficiency initiatives to optimize utility consumption and minimize environmental impact.- Implemented robust infrastructure maintenance plans, ensuring the uninterrupted availability of critical utilities.Major Projects:- Boosted Purified Water Generation: Installed Purified Water Heat Exchanger, increasing capacity and reducing failures.- Optimized Disprin Line Efficiency: Upgraded chiller, improving system reliability and maximizing production output.- Transformed Energy Efficiency: Installed Compressor Optimizer, optimizing load utilization and achieving cost savings.- Operational Excellence: Implemented Lean Manufacturing Model & Operator Asset Care, enhancing efficiency & productivity. Show less

      • Project Manager

        Aug 2023 - Jul 2024
      • Maintenance & Utilities Manager

        Jul 2018 - Aug 2023
    • Avery Dennison

      Jul 2024 - now
      Manager Engineering, Projects & ELS

      - Lead and manage the full lifecycle of engineering projects, from initiation and planning to execution, monitoring, control, and closure.- Develop and maintain comprehensive project plans, timelines, budgets, and resource allocation plans.- Monitor project progress closely, track key performance indicators (KPIs), and report on project status to stakeholders effectively.- Identify, analyze, and prioritize areas for process improvement within engineering functions, including product development, design, testing, manufacturing, and other relevant areas.- Provide technical leadership, guidance, and support to engineering team members, including engineers, technicians, and other relevant personnel.- Maintain a deep understanding of engineering principles, best practices, and industry standards relevant to the team's area of focus. - Stay abreast of the latest advancements in engineering technologies, materials, and methodologies.- Ensure adherence to engineering standards, safety regulations, and quality control procedures.- Coach and mentor team members on engineering best practices, problem-solving techniques, and professional development.- Promote teamwork and effective communication within the engineering team and across departments.- Utilize data analytics tools and techniques to identify trends, patterns, and areas for improvement.- Gather and analyze data, identify root causes, and develop and implement effective and sustainable solutions. - Build and maintain strong relationships with stakeholders across different departments, including manufacturing, operations, quality assurance, sales, marketing, and procurement. - Effectively communicate project status, risks, and issues to stakeholders at all levels.- Actively participate in cross-functional teams and collaborative initiatives to ensure alignment and achieve common goals. Show less

  • Licenses & Certifications

    • TPM Facilitator Course

      Japan Technical System Institute
      Sept 2012
    • HACCP

      Bureau Veritas Consumer Products Services
      Aug 2016
    • HAZOP

      Unilever
      Jun 2017
  • Honors & Awards

    • Awarded to Muhammad Khizer Butt
      Supply Excellence Award Reckitt Benckiser Pakistan Dec 2020 • Supply Excellence Reward 2020 on installation of Dettol Antiseptic Line by Reckitt Benckiser.
    • Awarded to Muhammad Khizer Butt
      Manufacturing Game Changer Award Reckitt Benckiser Pakistan Dec 2019 • Manufacturing Game Changer 2019 for delivering out-stretch targets on Gaviscon and Dettol Lines.
    • Awarded to Muhammad Khizer Butt
      Supply Chain VIP Award Unilever Pakistan Dec 2017 • Unilever Supply Chain award winner for Q3-2017 and Q1-2017
    • Awarded to Muhammad Khizer Butt
      Supply Chain Super Star Award Unilever Pakistan Dec 2016 • Unilever South Asia Supply Chain Superstar award for 2016 on installation of first grid tied solar system.
    • Awarded to Muhammad Khizer Butt
      Supply Chain VIP Award Unilever Pakistan Nov 2016 • Unilever Supply Chain award winner for Q3-2016
    • Awarded to Muhammad Khizer Butt
      Supply Chain VIP Award Unilever Pakistan Dec 2015 • Unilever Supply Chain award winner for Q4-2015.
    • Awarded to Muhammad Khizer Butt
      Employee of the Month Agriauto Industries (HOH Group) May 2012 Installation of Polishing Machine