
Timeline
About me
QA/QC|HSE|Lead Auditor|Master Trainer|Ex Manager for QA/QC,Construction,Sr.Turnover-commissioning-Sr.RFC/RFSU/Sr.Consultant Engineer E&I,|(Oil&Gas, Marine, Energy projects) Founder Vellavoor Associates, Estd 1989
Education

Institute of electrical and electronics engineers
-Ieee electrical and electronics engineering
Institution of engineers/mazagon dock yard bombay
1985 - 1990Bachelor's degree electrical engineering technologies/technicians# Bachelor of Engineering, Electrical Engineering # Membership Institute of Electrical and Electronics Engineers _IEEE No:94443942# Associate Membership Institution of Engineers India (AMIE-S) (AMIE-SI 21234)
%2C%20Kolkata.webp)
Institution of engineers of india (iei), kolkata
-
Experience

Mazagon dock ltd
Jan 1990 - Jan 1991Trainee/part time studyProject_ ship building, ship repairs and fabrication of offshore structures with facilities situated at Mumbai . build warships, submarines, merchant ships and fabrication of well head platforms, process and production platforms and jack up rigs. Marine warship Building for Indian Navy and construction of offshore platforms for Oil &Natural Gas Corporation

G.p.zachariades group
Jan 1992 - Jan 1994Electrical inchargeElectrical Installation work during the construction project of Le-Meridian 5* Hotel

Renco s.p.a.
Jan 1995 - Dec 2000Electrical & instrumentation site engineer/supervisor _ after joined with customer1. ABUDHABI_MIRFA POWER PLANT (A) ANSALDO/H&B (Contronics -3) 2. ABUDHABI_THAWEELAH POWER PLANT (B) ITALIMPIANTI/ABB / H&B(Contronics -B) 3. MONGOLIA_ ULAANBAATAR THERMAL POWER PLANT _ ABB (MOD-30) 4. ABUDHABI_HAFSAN CDS PROJECT_RENCO spa 5. ABUDHABI_HAFSAN ,ASAB, BUHASSA,SHAH ,SAHIL SCADA system project_ ABB/ELSAG BAILEYExperience achieved in Construction, QA/QC, HSE, Commissioning,Mechanical Completion, System turn over Maintenance, Direct and Indirect control of manpower, stores, Transportation.Hand and power tools associated with the trade, Commissioning in Power& Desalination Plants, Oil & Gas Field projects, Petrochemical Projects, Commercial and Industrial Buildings, Naval Dockyard etc….Hand on Experience in MECHANICAL, ELECTRICAL, and INSTRUMENTATION discipline. Monitoring, Planning, Scheduling, Direct and Indirect supervision of man power, QA/QC Inspection, Commissioning of contractors job activities , Installation and Commissioning of 400/220KV/132/11 KV/6.6KV Transformers, SIMELTRO/ABB/POWER GEAR INDIA IPBDS, GE Generators, Generator Circuit Breakers, SPVT Cubicles, GE packages of GAS turbines, DOOSAN/Nooter Ericson/NEM / HRSG/WHRB, FRANCO TOSSI /GE -STGS, REPCO/TORMENE /GSS SCADA packages of Fuel Gas (Gas Pressures Regulation) systems,, Installation and Testing of 11KV/6.6 KV/3.3 KV Motors, HV/ LV Transformers and Panels Installation and HI-POT of HV cables according to ITP, Building electrical, HVAC, Chilled water plant, MCC, Fire Alarm control system, lighting, Lightning, Primary and Secondary Earthing systems, Cathodic Protection, Electrical Heat tracing, Public Address, Telecommunication systems, Main Gate control/Access control systems, Traffic light systems Show less

Renco s.p.a./bakerhughes
Mar 1995 - nowQa-qc_hse coordinator(freelance sr. consultant engineer e&i/lead auditor) master trainer_1995-2000 and 2021onwards Renco Spa

Maire tecnimont
Jan 2001 - Jan 2002Electrical & instrumentation site supervisorUAE _ABUDHABI_BOROUGE POLYETHYLENE PROJECT_Monitoring and Supervision of subcontractors activities.QA/QC Inspectionpre-commissioningPreparation of mechanical Completion/Turn over packages/System turn over

Enel green power
Jan 2002 - Jan 2005Superintendent (e&i)cum qa/qcQatar_ Ras Laffan _A Power & Desalination Plant.Supervision and Inspection of Subcontractors and Vendors Installation and Precommissioning activities.Installation of GE Gas Turbines and Generators.(9E ), Steam Turbine Generators,Doosan WHRBS(Boilers),BOPs, Fuel Gas stations,Chilled Water cooling Towers, Alstom 200 KV Substation, HV Transformers and Cables

Jgc construction international
Jan 2005 - Jan 2007Qa/qc-sr.rfc/rfsu senior commissioning coordinatorJapan Gas CorporationQATAR - JGC FZE Through VELOSI (Dolphin Project) as SENIOR RFC/RFSU CO-ORDINATOR (READY FOR COMMISSIONING/START UP COORDINATOR- Co-ordination of Construction, QA/QC, Commissioning Departments to enable timely Completion of Project ,Preparation and Hand over Dossiers.(ICAPS system)Preparation of PQP, QCP's, ITP's, Method Statements, Mechanical Completion Packages, As built drawings ,Co-ordination of RFI's, WQT etc...Ensure that all Quality manuals/documents needed for the project is available at site ,Implement the approved project quality plan including inspection and test plan,Ensure that all necessary resources needed for carrying out quality control activities are available at site ,Ensure that all equipments used at site is calibrated; review and maintain files of calibration certificates ,Coordinate with Construction Manager/Superintendent, QA/QC Manager and QC inspectors regarding all quality matters,Coordinate with Construction Manager/Superintendent and QC Inspector for action to Request for Inspections (RFI). Maintain files of the RFIs ,Ensure that proper coordination with the Customer for the inspection witnessing is being observed,Preparation of test reports and preservation of all approvals,Ensure that QC Inspectors are working to defined Quality Procedures,Report to the Management on regular basis Show less

Fisia italimpianti - gruppo salini impregilo
Jan 2007 - Jan 2008Qa/qc supervisorQATAR _RAS ABU FONTAS POWER&DESALINATION (B) PROJECT_Construction Supervision and QA/QC activities related to E&I work of Power and Desalination Project Monitoring, Planning, Scheduling, Direct and Indirect supervision of man power, QA/QC Inspection, Pre-commissioning of Sub contractors job activities ,Hi-POT Test of MV Cables and Panels etc

Iberdrola
Jan 2008 - Dec 2010Qa/qc engineerQATAR MESAEED POWER PLANT (A)_Construction/ Commissioning/ Start up and Operation of Power Plant.Installation and Commissioning of 9FA GE Gas Turbines and Auxiliary systems, 6B GE Black Start Turbines, Auxiliary systems and Generators, NEM - HRSG chemical cleaning , Steam Blowing, D11 GE - Steam Turbine generators, ABB- MV/LV Transformers, MV/LV Motors, MV/LV Panels, AREVA -SIEMENS 400/220/132 KV GIS substations.Supervision of the Contractors, in order to ensure that their work fulfils the project requirements.Revision of Commissioning and Start-up performance procedures and surveillance their compliance. Show less

Saipem
Jan 2010 - Jan 2011Qa/qc-commissioning/ turnover coordinatorQATAR QAFCO 5&6 Project_Co-ordination with QA/QC, Commissioning Departments to enable timely Completion of Project ,Preparation and Hand over of Mechanical completion Dossiers (using PCOS system for project completion),Monitoring and maintaining of System completion packages.Participate with daily Co-ordination meeting with internal departments and client.Maintain Punch list data entry. Prepare and Monitor the status and schedule of Punch list clearance and system handover and report to Manager on daily basis. Show less

Ge
Jan 2011 - Nov 2013Quality manager/leader(sqm&hse coordination)#SAUDI ARABIA_Site Quality Manager Specialist for General Electric /TGE _SAUDI ARABIA Marafiq Power and Desalination Project(+Warranty Works)# INDIA_Site Quality Leader General Electric (GE) /Granite Service International GSII_Reliance Samalkot Construction and Commissioning of combined cycle power plant INDIA.Rectification of P91 Welding defects on steam Turbine piping(Small bore and Large bore)General warranty items on HRSG , Gas Turbines and BOPs(Electrical and Mechanical Installation defects, Welding defects, Coating defects etc)Modification of Gas chromatograph, Commissioning and start up of duel fuel system in Turbine Show less

Techint engineering & construction
Dec 2013 - Nov 2014Qa/qc-commissioning turnover coordinatorSAUDI ARABIA_ARAMCO SINOPEC REFINERY_SOLIDS HANDLING PACKAGE SP3 WBS 161 Coke Transport & Storage (CTS), mainly consists of belt conveyors, transfer towers and circular stacker/reclaimer for emergency storage pad ,Sulfur Pelletizer & Loading (SPL), mainly consists of molten sulfur pipeline and sulfur pelletizer unit , WBS 178 King Fahd Industrial Port Storage & Loadout Facilities (KSL), mainly consists of linear stacker and reclaimer for coke storage building and sulphur storage building and common ship loader facilities.* Coordination with QA/QC Inspections and Participate in client Final Walk down inspection for system completion* Maintain System completion/Punch list data and status* Arrange /Participate customer meetings for consolidation of Final walk down punch list items* Monitoring and Liquidation of Final walk down punch list items and coordination between internal departments ,Subcontractors and Customer for various disciplines/ Departments.* Reports to Project commissioning Manager on regular basis. Show less

Engineering consultants group s.a.
Jan 2015 - Mar 2021Freelance qa-qc_hse coordinator (sr.consultant engineer e&i)_lead auditor iso 9001&45001)Freelance Sr.QA/QC-HSE coordinator, Sr. Electrical Consultant Engineer,,Oil&Gas, Power,Petrochemical Quality/Coordinator, ISO 9001 &45001 IRCA certified Lead Auditor QMS,NEBOSH, IOSH,First Aid, Fire Warden.Permit to Work/Job Performer,General Electric/Granite International , Japan Gas Corporation(JGC)/Saipem,Safety Training Courses.Offshore/Onshore Oil&Gas/Marine/Powerplant/Desalination /400KV Substations/Petrochemical/Dockyard/Shiploading &MEP projects with Consultants&EPIC.SGS,Qatar Cool, NPCC, Qatar Petroleum (QP) Third Party Inspections,Plants Safety Audit&Inspections, Third party Vendor Inspections, Freelance at ECG_Engineering Consultant Group #Monitors,reviews,comments and reports on progress payments , # Logs and monitors all contractors submittals (Correspondence and shop drawings) to assure timely response, and process change and field orders for review by the project Manager Prepares necessary draft correspondence for final approval by the Project Manager/#Assists as applicable , with pre-tender and pre-construction activities for contracts relative to site and provides input for all change orders and claims analysis. #Holds daily meeting with the contractor's representatives # Prepare weekly progress reports # Assist the Project Manager/ Resident Engineer in preparing the monthly progress reports# Reviews and approves the As-built drawings for final approval by the Project Manager/ Resident Engineer Maintain daily diaries of events associated with the work on site # Reviews and presents the contractors valuations payments for final approval by the Project Manager/ Resident Engineer# Supervise subordinate staff members #Witness and supervise commissioning and startup activities.#Assist in preparing the Final Acceptance and completion report .Familiar with Mechanical, Civil, Electrical, Instrumentation QA/QC activities - Welders Qualification test, Painting Inspections, Welding Inspections , Preparation of WPS, PQR, WQP etc Show less
Licenses & Certifications

Iso 9001-2015 qms lead auditor
International register of certificated auditors
Iosh
Iosh.webp)
Ndt level ii
Asnt (the american society for nondestructive testing)
Job performer course
Gtsc uae - gulf technical & safety training center
Oil&energy safety trainining courses
Ge
Nebosh
Nebosh
Oil&gas safety training courses
Jgc
Oil&gas safety training courses
Saipem
Ptw
Gtsc uae - gulf technical & safety training center
Ieee
The institute of electrical and electronics engineers, incorporatedDec 2017
Volunteer Experience
First class
Issued by The Bharat Scouts and Guides
Associated with Saji George Vellavoor
Languages
- enEnglish
- hiHindi
- taTamil
- maMalayalam
Recommendations

Maninder singh clare, be, mba
Technical Sales Specialist - Exports - EU, SAS & NCAVadodara, Gujarat, India
György soós
Software Engineer at Bluestellas KftHungary
Marianne bjerregaard
Digital Project Manager at LOGSTORDanmark
Roman andrejčák
Everything is possible.Slovakia
Alexandre barbosa
Comprador | Buyer | Purchaser | Supply ChainNiterói, Rio de Janeiro, Brasil
Fanny n.
.Vigo y alrededores
Matt redford
Senior Product Manager at AgeroSpanish Fork, Utah, United States
Hee sung chang
CT I&C ManagerUiwang, Gyeonggi, South Korea
Héctor javier rodríguez
Ingeniero TécnicoGreater Las Palmas Metropolitan Area
Victor grange
Fourth year student at Institut Paul BocuseGreater Lyon Area
...