Sadeq Ajam

Sadeq Ajam

Engineer in Power Transmission Projects Department. Of Electricity)

Followers of Sadeq Ajam810 followers
location of Sadeq AjamIraq

Connect with Sadeq Ajam to Send Message

Connect

Connect with Sadeq Ajam to Send Message

Connect
  • Timeline

  • About me

    Site Manager

  • Education

    • Babylon

      2002 - 2006
      BSc Electrical Eng.

      B.Sc. in Electrical Engineering / University of Babylon, Iraq (2002 – 2006).

    • Sam Higginbottom University of Agriculture, Technology And Sciences (SHUATS)

      2012 - 2014
      Master Degree Power System 8.9
  • Experience

    • Ministry of Electricity

      Jan 2004 - Jun 2005
      Engineer in Power Transmission Projects Department. Of Electricity)

      1- Construction and installation substation power transformer. (132KV – 33KV – 11KV).2- Construction and installation high voltage transmission line (400KV – 132KV) with all Final inspection.

    • Babylon engineering company

      Jun 2005 - Aug 2006
      Work in Babylon engineering company as manger.

      1- Designing, installing & running electrical controlling boards.2- Designing, installing & running kiosic transformers.3- Designing, installing & running power factor correction system.4- Maintenances of electrical motor, high-low power.5- Maintenances of circuit breakers6- Maintenances the manual & automatic change over.

    • Mussaib thermal power Plant

      Aug 2006 - Aug 2008

      1. I got my training as an operation engineer according to the Engineer’s training program in the following fields:• Intake water• Water treatment• Boiler operation system• Turbine• •Electrical• Safety regulation2. Participate as a witness during the training in the followings:The new 400/132/11 kV 250 MVA auto transformer relays, Generators, Power and auxiliarytransformers, 6.6 kV switchgear & 0.4 kV MCC, excitation system, invertors “UPS”, batteries and chargers). Show less

      • Mussaib Thermal Power Plant (4*300MW) Operation Engineer - operation Department.

        Aug 2007 - Aug 2008
      • Engineer under training - operation Department - Mussaib thermal power Plant.

        Aug 2006 - Aug 2007
    • Mussaib gas Power Plant

      Aug 2008 - Feb 2009
      Shift Engineer - operation Department - Mussaib gas Power Plant (10*50MW).

      1. Monitor the status of generating units and record all the generation parameters in the log sheet in addition2. of defects, might take place and take the suitable action with coordination with the dispatch center.3. Observe the 400kV network status and register all the events of the switchyard Transformers, CB’s, isolators,4. lines…etc.).5. Monitor the fuel and water treatment systems.

    • Mussaib gas Power Plant

      Feb 2009 - Feb 2011

      1. Observe and collect all the necessary data about temperature, speed, clearances and vibration.2. Assess and compare those collected data with the manufacturer recommendation and take the suitable3. action for maintenance to assure the safe and reliable operation of the units.4. Following the manufacturer recommendations and figures to inspect the hot path and identify clearances,5. pitting and corrosion using the special tools and equipment’s like borescope type XLG3.6. Measurement the thickness of materials in the fuel system and water treatment dep. Show less

      • Test Engineer – Inspection Department - Mussaib gas Power Plant (10*50MW)

        Feb 2010 - Feb 2011
      • Operation Engineer - water treatment Department -Mussaib gas Power Plant (10*50MW).

        Feb 2009 - Feb 2010
    • Iraq government

      Feb 2011 - Sept 2012
      Follow-up to the installation of alkhairat 10* 125 MW gas turbines (fram-9) power Plant Project.

      1. Quality control department.2. Safety department.3. Control engineering follow and check4. The installation of the gas units.5. The installation of the electric GIS (400KV- 132KV).6. The installation of fuel tanks and water.7. Install systems that provide ideal conditions for the work of the power plant.Test

    • GE

      May 2014 - Sept 2015
      Electrical Department Of Alkhairat 10* 125 MW Gas Turbines (Fram-9 ) Power Plant Project

      Description of duties:1. Maintenance high voltage switchgear 6.6 KV ( ABB circuit Breaker ).2. Maintenance low voltage switchgear 400 V ( ABB & Schneider circuit Breaker ).3. Maintenance And Operation switchgear GIS 400KV& 132KV ( Alstom company type ).

    • GE Power

      May 2014 - Sept 2015
      Maintenance Engineering Electrical Department of Alkhairat 10* 125 MW Gas Turbines (Fram-9).

      1. Maintenance high voltage switchgear 6.6 KV (ABB circuit Breaker).2. Maintenance low voltage switchgear 400 V (ABB & Schneider circuit Breaker).3. Maintenance and Operation switchgear GIS 400KV& 132KV (Alstom company type).

    • Iraq government

      Jan 2015 - Apr 2015
      Operation Manager of Sada plant 2*10 MW Ekol Stem Turban Type (Jan 2015 – Apr 2015).

      Description of duties:1. Boiler operation system.2. Turbine operation system.3. Generator operation system.4. Unit auxiliary equipment.

    • UEG

      Dec 2015 - now
      Site Manager

      Site Manager Kuwait Energy Company For oil Produce in Iraq Basra Faihaa-1 location part 9 , ( Dec 2015 – present

  • Licenses & Certifications

    • This is to certify that Mr. Sadeq Yassob Jasim has worked for Al JAWZA’A Engineering & Industrial Service Ltd / owned by Mena Industrial Services Co. W.L.L (MENAISCO Bahrain) and assigned to GE IRAQ project - Al-Khairaat Plant in Karbala Iraq

      During this period of time he fulfilled his responsibilities properly in line with given instructions by Al JAWZA’A Management/Administration and had cooperative attitude with other employees working in the project.
      Mar 2014
  • Volunteer Experience

    • First aid

      Issued by with my frind in hospital on Jan 2003
      with my frind in hospitalAssociated with Sadeq Ajam