Raja Ammar Nazir, P.E., M.Sc., PMP®

Raja Ammar Nazir, P.E., M.Sc., PMP®

Followers of Raja Ammar Nazir, P.E., M.Sc., PMP®373 followers
location of Raja Ammar Nazir, P.E., M.Sc., PMP®Makkah Region

Connect with Raja Ammar Nazir, P.E., M.Sc., PMP® to Send Message

Connect

Connect with Raja Ammar Nazir, P.E., M.Sc., PMP® to Send Message

Connect
  • Timeline

  • About me

    Senior Engineer (Mechanical) at NESPAK

  • Education

    • Crescent Model Higher Secondary School, Lahore

      2000 - 2002
      Higher Secondary School Certificate Pre-Engineering
    • University of Engineering and Technology, Lahore

      -
      Master of Science in Thermal Power Engineering Mechanical Engineering
    • University of Engineering and Technology, Lahore

      2003 - 2007
      Bachelor of Science in Mechanical Engineering Mechanical Engineering
  • Experience

    • National Engineering Services Pakistan (Pvt) Limited (NESPAK)

      Jun 2007 - now

      • Water Transmission from Halli, Yubah, Qanona and Al Lith Dams to Shoaiba Station Phase – 4 o Supervision of all the works for the two (2) sites:• Qanona Dam WTP: 8 dual media filters (18,000 m3/day). • Yubah Dam WTP: 8 dual media filters (20,000 m3/day). o Carried out testing and commissioning of the whole plants for plants’ startup.o Ensued that the all the works on the sites are executed as per approved drawings / documents.o Organized meetings among Client, Consultant and Contractor to resolve issues faced during execution.o Prepared daily, weekly, monthly and annual progress reports for the projects.o Major equipment include pumps, EOT cranes, pipes and appurtenances, fire suppression systems. Show less WATER TRANSMISSION FROM HILI, YABBA, QANUNA, AND AL-LITH DAMS TO SHOAIBA STATIONo Supervision of all works for the two (2) sites being executed.• Qanona WTP: 8 dual media filters (18,000 m3/day). • Yubah WTP: 8 dual media filters (20,000 m3/day). o Carried out testing and commissioning of the whole plants for initial handover including Aspiration Smoke Detection Systems and Clean Agent Fire Suppression Systems for Electrical Rooms.o Ensued that all the works on the sites are executed as per approved drawings/documents.o Prepared daily, weekly, monthly and annual progress reports for the projects.o Major Equipment include: several pumps; cranes; pipes and appurtenances; clean agent fire suppression systems. STUDY OF WATER POLLUTION TREATMENT IN VARIOUS REGIONS OF KINGDOM OF SAUDI ARABIAo Lead Design Review Team for four (4) sites of the Project.• Al-Malaidah and Al-Sheqah WTP: 6 CFM trains, 4 NF & 2 RO skids (25,000 m3/day).• Upgrade of Buraidah WTP: Replacement of sand filters with 8 CFM trains (96,000 m3/day).• Tabouk WTP: 10 CFM trains, 5 NF & 2 RO skids (150,000 m3/day).• Upgrade of Hummimah WTP: Replacement of sand filters with 12 CFM trains and addition of 3 Brine RO skids (123,900 m3/day).o Ensured coherence and optimization among various specialties for appropriate design of the plants. o Recommended modifications for improvement in Basic and Detailed Design to reduce capital and running costs of the WTPs and ensuring compliance with projects’ requirements during review of documents / drawings including P&IDs, Hydraulic Calculations, Hydraulic Profile, Water Hammer System, Site Layout, Piping and Installation, HVAC, Plumbing, Fire Fighting, etc.o Approved vendors and subsequently technical submittals.o Major equipment include several pumps, EOT cranes, pipes and appurtenances, Tanks, etc. STUDY AND DESIGN OF UTILIZATION OF DAM WATER IN VARIOUS REGIONS OF THE KINGDOM Show less - Prepared Feasibility Design and Front-End Engineering Design (FEED) i.e. Technical Specifications, Bill of Quantities, Drawings, Engineer's Cost Estimate, etc.- Review / approval of contractors' Detailed Design i.e. Detailed Design Calculations, Shop Drawings, Implementation Methodology, Test Procedures, Test Reports, etc.regarding pumping machinery, pipeline & appurtenances, hydraulic gate equipment, cranes, oil / water storage tanks, etc.Major Projects:- 747 MW Combined Cycle Power Plant at Guddu- 425 MW Combined Cycle Power Plant at Nandipur- Remodeling of Warsak Canal System in Peshawar- Greater Water Supply Scheme, Peshawar- 840 MW Suki Kinari Hydro-power Project Show less - Assisted in preparation of Feasibility Design and Front-End Engineering Design (FEED) i.e. Technical Specifications, Bill of Quantities, Drawings, Engineer's Cost Estimate, etc.- Assisted in review / approval of contractors' Detailed Design i.e. Detailed Design Calculations, Shop Drawings, Implementation Methodology, Test Procedures, Test Reports, etc.regarding pumping machinery, pipeline & appurtenances, hydraulic gate equipment, cranes, oil / water storage tanks, etc.Major Projects:- Kachhi Canal Project- Nai Gaj Dam Project- Feasibility of Dasu Dam Project Show less

      • Project Manager

        Dec 2020 - now
      • Senior Engineer (Mechanical)

        Aug 2015 - Nov 2020
      • Senior Engineer (Mechanical)

        Jul 2010 - Aug 2015
      • Junior Engineer (Mechanical)

        Jun 2007 - Jun 2010
  • Licenses & Certifications

    • Developing a Competitive Strategy

      LinkedIn
      Jun 2020
      View certificate certificate
    • Primavera P6 Essential Training

      LinkedIn
      Jan 2021
      View certificate certificate
    • Employer Branding on Linkedin

      LinkedIn
      Jun 2020
      View certificate certificate
    • Engineer (Mechanical)

      Saudi Council of Engineers
      Sept 2015
    • Developing Your Emotional Intelligence

      LinkedIn
      Jun 2020
      View certificate certificate
    • Professional Engineer (PE)

      Pakistan Engineering Council (PEC)
      Jun 2012
      View certificate certificate
    • Problem Solving Techniques

      LinkedIn
      Jun 2020
      View certificate certificate
    • Enhancing Resilience

      LinkedIn
      Jun 2020
      View certificate certificate
    • Project Management Professional (PMP)®

      Project Management Institute
      Sept 2019
      View certificate certificate
    • Pipe Stress Analysis using CAESAR – II Software

      National Institute of Design & Analysis (NIDA)
      Mar 2011