Prashant Singh

Prashant Singh

Assistant Engineer

Followers of Prashant Singh1000 followers
location of Prashant SinghKashipur, Uttarakhand, India

Connect with Prashant Singh to Send Message

Connect

Connect with Prashant Singh to Send Message

Connect
  • Timeline

  • About me

    H.O.D-Control & Instrumentation Dept.| Specialist Industrial Process Automation of Power Plant, Sugar Plant, Distillery Plant, Chemical Plant| Expert in D&E of DCS System | Working on Industry Digitalization 5.0 |

  • Education

    • HSS, DEHRADUN

      -
      Certification Programming languages of PLC, SCADA & VFD A
    • R.L.B SR SEC SCHOOL, LUCKNOW

      2004 - 2006
      HSC PCM A
    • Project Management Institute Chennai Chapter

      -
      Certification Project Management A
    • APJ Abdul Kalam Technological University

      2006 - 2010
      Bachelor of Technology (B.Tech.) Electronics & Instrumentation Engineering A

      Activities and Societies: Member of cyber society

    • IIBA Egypt Chapter

      -
      Certification Certified Business Analysis Professional (CBAP)
  • Experience

    • NOVEL SUGAR LIMITED

      Jul 2010 - Feb 2011
      Assistant Engineer

      ● Started as an “GET & promoted to Asstt. Engineer - Instrumentation” in Instrumentation Department.● Responsible to maintain O&M along with preventive scheduled of maintenance for 5000 TCD Sugar Plant with ABB DCS.● Responsible to maintain O&M along with preventive scheduled of maintenance 8, 6, 3 MW Power Plant & 60 TPH Boiler.● Responsible to maintain O&M a raw material of Steel Plant alloy plant.● Up-keeping of Air Compressor and dryer System.● Maintain reports and calibration record of instruments and hand on calibration for various type of Instruments. Show less

    • NV Group

      Mar 2011 - Aug 2013
      Engineer Electrical & Instrumentation Engineering

      ● Worked as an “Engineer -E&I” in Electrical & Instrumentation Department and worked as shift in charge after completion of project.● Handled E&C of AFBC High Pressure 85 TPH, 87Kg/cm2 Steam Boiler (Make- IJT) with HONEYWELL DCS and 11MW Steam Turbine (Make-Siemens) with HONEYWELL DCS.● Handled commissioning of 1*120 KLPD Grain Distillery Plant (Make- PRAJ) with Siemens DCS System.● Responsible and maintained operation & maintenance of 11 MW Power Plant & 85 TPH Boiler (AFBC, Fuel Coal & Rice Husk) automation by HONEYWELL DCS System & 129 KLPD Distillery with SIEMENS DCS System● Handled commissioning of DDGS dryer system (Make- Alfa Laval) with automatic packing system.● Up-keeping of Air Compressor and dryer System of entire plant along with PET Plant.● Maintain reports, DMR, SOP and calibration record of instruments and hand on calibration for various type of Instruments. Show less

    • OASIS ETHANOL INDUSTRIES (P) LIMITED

      Sept 2013 - Feb 2015
      Sr. Engineer Electrical & Instrumentation Engineering

      ● Worked as an “Sr. Engineer – E&I and worked as shift in charge of Electrical & Instrumentation after completion of project.● Handled Commissioning of AFBC Steam Boiler 60 TPH, 87Kg/cm2 with SIEMENS DCS and 09 MW Steam Turbine (Make-Triveni) with SIEMENS DCS.● Handled commissioning of 2*107 KLPD Grain Distillery Plant (Make- PRAJ) with Allen-Bradley PLC System.● Responsible and looked operation & maintenance of 09 MW Power Plant & 60 TPH Boiler (AFBC, Fuel Coal & Rice Husk) automation by SIEMENS PCS7 DCS System & 2*107 KLPD Distillery with ALLEN-BRADLLEY PLC System.● Up-keeping of Air Compressor and dryer System.● Maintained reports, DMR, SOP and calibration records and hand on calibration for various type of Instruments. Show less

    • Balrampur Chini Mills Limited

      Mar 2015 - May 2020
      Section Head- Instrumentation Engineering

      ● Worked as section Head “Asst. Manager (Instrumentation)” in BCML, Balrampur- Distillery Division and responsible for operation and maintenance of Power Plant and Distillery Plant of capacity 196 KLPD.● Handled Erection & Commissioning of two Incineration Power Plant projects (Boiler 1x40 TPH, Boiler 1x20 TPH with TG 1x6MW & 1x2.5 MW) along with expansion of Distillery Plant (196KLPD).● Upgraded of PLC based control system into DCS based control system for old as well as new Distillery Plant & both Incineration Power Plant automation taken on DCS system.● Looked O&M of Slope Fired Incineration Boiler, Turbine with Multi-effect Evaporator & 196 KLPD Distillery plant with DCS System.● Responsible for preparing documents regarding DPR & PPR of Incineration Power Plant, budget planning & maintenance history of instruments & using it as useful reference to resolve future maintenance issues.● Skillfully managing the entire gamut of activities during project & completed without fail of time.● Involved various activity of correction, modification, and improvement in operation. Major achievement to reduce the very high R&M cost on air compressor.● Serve as Team Member of “Material Specification” at group level from Instrumentation. Show less

    • Dhampur Bio Organics Ltd.

      Jun 2020 - Mar 2022
      Manager- C&I Engineering Operation & Projects

      ● Worked as a “H.O.D– Instrumentation (Designation-Manager)” in Dhampur Sugar Mills Limited unit: Asmoli and responsible for Sugar Plant, Co- Generation Power Plant, Incineration Power Plant, Distillery Plant and Bottling Plant.● Responsible & maintained O&M of Sugar Plant with Refinery (10500 TCD), Co-Generation Power Plant of 44 MW with Boiler 170 TPH (105 Kg/cm2), 70 TPH & 50 TPH along with Turbine 30 MW, 11 MW, 3MW, Incineration Power Plant with Boiler 35 TPH & Turbine 3.2 MW, 45 TPH Boiler along with 9 MW Turbine (Siemens) and 350 KLPD multi-feed Distillery Plant along with Bottling Plant with DCS based control system i.e., Yokogawa/Siemens/Rockwell & ABB.● Handled Sugar expansion from capacity 8000 TCD to 10500 TCD along with pharma sugar production.● Handled E&C of 1x200 KLPD Distillery Plant along with Bottling Plant.● Handled E&C of 1x45 TPH Boiler along with 1x9 MW turbine with HollySis DCS system. ● Worked as team leader of a Team “Automation & Digital Transformation” for Sugar, Co-Generation Power Plant and Distillery Plant at Group level (Handled Total- 5 No Sugar Plant, 3 No Co-Gen Power Plant, 3 No Incineration Power Plant, 6 No Captive Power Plant, 4 No Distillery Plant.)● Worked as team leader of a Team “Group Audit Team” for analysis of Boiler & Turbine performance and how optimized COP and Bagasse saving in Co-Generation Power Plant at Group level (Total- 3x170 TPH Steam Boiler with 3x90MW Steam Turbine). Resulting record saving in bagasse of amount Rs. 10 Cr in a year as compared to last previous 5 years.● Involved various activity of correction, modification and improvement in operation and upgradation of control system of Sugar, Co-Gen Power Plant and Distillery Plant. Major achievement was saving of Bagasse under Co-Generation Power Plant.● Implemented TPM (Total Productive Maintenance) with M/s TQMI and played role as Group Circle Leader.● Achieved the award of Train the Trainer. Show less

    • Triveni Engineering & Industries Limited

      Apr 2022 - now
      Head- C&I Engineering Operation & Projects

      ● Working as a “H.O.D – Instrumentation Engineering operation & Projects in Triveni Engineering & Industries Limited.● Leading modernization, upgradation of process automation system with existing Sugar and Co-Generation Power Plant and Digital Transformation with IIOT under upcoming new projects of multi-feed Grain, Syrup & Molasses based Distillery Plant, Incineration Power Plant.● Handled green filed project E&C of Incineration Power Plant 2x60 TPH Boiler 2X6MW Turbine along with Multi feed Grain, syrup 2x160 KLPD & Molasses based 2x200 KLPD Distillery Plant along with BOP.● End to end all technical coordination of all technical matters related to basic engineering, detail engineering of the project.● Preparation concept note for different technical jobs that arise in planning of the project.● To develop strategies of digitalization using techniques of IIOT 4.0.● To liaise with the govt bodies CPCB, CGWA other regulatory agencies as required on technical matter and online data monitoring.● To technically ensure completeness of the project scope in achieving performance guarantee from each vendor.● To keep abreast with changing technologies for enabling transformation and achieving efficiency● Evaluating mass and energy balance for all the process to ensure cost of production is in control.● To take active part in new initiatives of the company in the field of overall performance & excellence.● Planning the execution project & maintenance activity, observing standard procedures for maintenance, and considerably reducing down time.● Skillfully managing the entire gamut of activities pertaining to all equipments like Preventive & Periodical Maintenance. Analysis of Preventive & Breakdown maintenance and restoration.● Adroitly monitoring and analyzing the equipments to avoid unexpected breakdown and efficiently handle breakdown & modification by applying various efforts. Resulting reduction of MTTR, down time tracking and efficiency improvement. Show less

  • Licenses & Certifications

    • Operations Management Foundations

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Managing Project Stakeholder

      Project Management Institute
      Dec 2022
    • Project Leadership

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Project Management Foundations Risk

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Project Management Foundations: Quality

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Project Management Foundations: Procurement

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Quality Management for Operational Excellence

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Project Management Foundations: Budgets

      Project Management Institute
      Dec 2022
    • Project Management Foundations: Requirements

      Project Management Institute
      Dec 2022
      View certificate certificate
    • Technical Product Management

      Project Management Institute
      Dec 2022
      View certificate certificate